Cedar Lake is a town, and inside its limits building permits come from the Planning, Zoning & Building Department at Town Hall, 7408 Constitution Avenue ((219) 374-7000), open Monday to Friday from 8:00 a.m. to 4:30 p.m. Permit applications and contractor registrations are submitted through the GovWell online portal, and every contractor working in town must be registered first. An inspection that cannot be done because the work is not ready costs $35.
What requires a building permit in Cedar Lake?
The department’s own rule is broad: a building permit is required for new construction, additions, alterations and repairs, and for installing mechanical, plumbing and electrical systems. It names the common cases below and asks owners to contact the department whenever they are unsure, because early advice avoids costly corrections.
Building permit
- New homes and additions
- Detached garages, sheds and other accessory structures
- Decks, patios and fences
- Swimming pools
- Mechanical, electrical and plumbing work
- Demolition
Town approval besides the permit
- Any shed, driveway, culvert, fill or grade change in a drainage easement
- Fences or landscaping in a drainage easement, which need the Town Engineer’s approval
- Variances and appeals from the Board of Zoning Appeals
- Rezoning, plats and site plans from the Plan Commission
- Alarm permits from the Clerk-Treasurer ($10, valid two years)
Patios and fences are on the town’s permit list, so do not assume flatwork or a privacy fence is exempt. Bulk requirements (setbacks, heights and lot coverage) and the schedule of uses for each zoning district are posted on the department’s pages.
What Cedar Lake decides and what the state holds
The town reviews applications against the Indiana Building Code in 675 IAC, its Zoning Ordinance and its other local ordinances, sets its own permit, tap and impact fees, and registers contractors. Projects that disturb an acre or more also need IDEM construction stormwater coverage. A building used by the public, by three or more tenants or by anyone’s employees is a Class 1 structure: the Indiana Department of Homeland Security must issue a Construction Design Release before work starts, unless 675 IAC 12-6-4 exempts it, and the town permit does not replace that release.
Cedar Lake building department: who handles permitting
The Planning, Zoning & Building Department evaluates all building permit requests and processes contractor registrations for the town; permits are approved by the Building Commissioner, and Plan Commission filings are reviewed first with the Building Administrator. The Plan Commission (seven members) handles rezoning, subdivisions, site plans and plats; the Board of Zoning Appeals (five members) hears variances, special use exceptions and appeals. Drainage review also runs through the department. Cedar Lake is incorporated, so the Lake County Plan Commission does not issue permits here (see the Lake County guide).
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Planning, Zoning & Building Department, Town Hall, 7408 Constitution Avenue (PO Box 707), Cedar Lake, IN 46303 |
| Phone and email | (219) 374-7000; buildingdept@cedarlakein.gov |
| Hours | Monday to Friday, 8:00 a.m. to 4:30 p.m. |
| Online portal | GovWell (permits, contractor registration, fee payment) |
| Jurisdiction | Town of Cedar Lake limits only |
Older town forms and the town’s boards and commissions page still print (219) 374-7400; the department page gives (219) 374-7000.
Cedar Lake permit types
Every application is filed in GovWell: create a free account, open My Projects, start a New Submittal, enter the property, pick the services (building permit, contractor registration and so on), read the requirements shown for that permit type, upload the forms and plans, and submit. Drafts can be saved and finished later, a confirmation email follows the submission, and the status can be tracked in the portal.
Residential permits
- Plans. The town’s building permit application asks for a plat of survey showing existing and proposed structures, all setbacks and existing and proposed grades, and two sets of drawings with floor plans, foundation, elevations, electrical plans and wall sections.
- New homes also need energy documents and truss certifications, and an as-built survey at the final inspection.
- Trusses and I-joists. Where a building uses lightweight trusses or I-joists, a Firefighter Safety Notification form records their type and location.
- Flood areas. The application asks whether the lot is in a floodplain.
- Erosion control is required on construction sites.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Zoning standards for houses
The department posts the bulk requirements of Zoning Ordinance 1402 for each district; any departure needs a variance. The two main single-family districts compare as follows.
| Standard | R-1 | R-2 |
|---|---|---|
| Maximum height (at peak, measured from 12 inches below top of foundation) | 35 feet | 30 feet |
| Minimum lot area, interior / corner | 15,000 / 16,500 sq ft | 10,000 / 12,500 sq ft |
| Minimum lot width, interior / corner | 90 / 100 feet | 80 / 100 feet |
| Front yard on most local roads | 30 feet | 30 feet |
| Side / rear yard | 12 / 30 feet | 8 / 30 feet |
| Maximum lot coverage | 25% | 25% |
| Minimum house size | 1,500 sq ft one story; 1,700 sq ft 1½ story; 2,200 sq ft two story | Same as R-1 |
| Attached garage | 400 to 1,100 sq ft | 400 to 1,100 sq ft |
Not sure this scope needs a permit?
Get a free quote →Front yards are deeper on federal aid urban roads (40 feet) and on state or federal highways, and the R-T two-family district allows 40% lot coverage.
Commercial permits
Commercial projects go through the same portal, usually after site plan approval by the Plan Commission and drainage review under the town’s Stormwater Management Ordinance and Stormwater Technical Standards, which cover detention, erosion and sediment control and long-term water quality. Class 1 buildings need the state design release in hand, and developers pay the town’s engineering, legal and publication costs under Subdivision Control Ordinance 498.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning check. Confirm the district’s setbacks, heights and permitted uses on the department’s bulk requirements and schedule of uses pages.
- Plan Commission. Rezoning, concept plans, plats, site plans and PUD amendments start with an appointment with the Building Administrator, then a Plan Commission work session. Applications are due by the first Friday of the month for the following month’s meeting.
- Board of Zoning Appeals. Variance applicants notify adjacent owners by certified mail and publish a legal notice at least 10 days before the hearing, then file the proofs at least 5 business days ahead; an approval must be used within one year.
- Drainage easements. Any crossing of or encroachment into a drainage easement needs town acceptance before work begins.
- State stormwater. One acre or more of disturbance, or part of a larger plan of development, needs IDEM’s Construction Stormwater General Permit.
Cedar Lake permit costs and fees
The town does not post its building permit fee amounts on its permit pages; the building permit application shows how a permit is billed, with separate lines for the zoning fee, building fee, sewer tap and sewer development fees, water tap and water development fees, a park impact fee and an escrow fee. Fees are paid through GovWell. Ask the department for the total for your address before you sign a contract.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Re-inspection (work not ready) | $35 |
| Developmental variance / use variance / appeal (BZA) | $50 each |
| Preliminary plat | $275 minimum, plus subdivision requirements |
| Rezone | $100 |
| Site plan, PUD amendment or concept plan | No filing fee |
| Developer costs (engineering, legal, publication) | Billed to the developer under Ordinance 498 |
| Alarm permit (Clerk-Treasurer) | $10 for two years |
Variance and Plan Commission applicants also pay for certified mailings and the newspaper legal notice themselves. A new house will carry the park impact fee and the water and sewer tap and development fees on top of the building and zoning fees, so the utility lines can be larger than the permit itself.
Trade permits and who may pull them
Mechanical, electrical and plumbing work needs a building permit from the same department, and the application records the electrical amperage and service work, plumbing fixtures, water line and meter size, and the number of furnaces and air-conditioning units. The town requires every contractor performing work in Cedar Lake to be registered, and the permit form asks for each contractor’s Cedar Lake license number.
- Registration. Contractors register through GovWell, the same portal used for permits.
- Public list. The town publishes its registered contractors (company, trade type such as general or specialty siding and roofing, phone and certificate number) on its open data page, downloadable as a spreadsheet, so owners can check a firm before hiring it.
- Plumbing. Plumbing contractors also hold the state plumbing license.
- Homeowners. The town’s pages do not describe a homeowner permit or homeowner trade test; ask the department before doing your own electrical or plumbing work.
Sanitary sewage from Cedar Lake is treated at the Lowell wastewater treatment plant, overseen by a Joint Management and Oversight Board that also serves Lake Dalecarlia; sewer tap and sewer development fees are separate lines on the town’s permit form.
Rather not deal with the building department?
Get a free quote →How to apply for a Cedar Lake building permit
Review zoning, setbacks, drainage easements and the floodplain before drawing plans.
Each contractor registers with the town in GovWell before the permit is issued.
Variances, rezoning or site plans go to the BZA or Plan Commission first.
Plat of survey with grades, two drawing sets, energy and truss documents for new homes, erosion control and the firefighter notification where needed.
Start a New Submittal, choose the permit, upload everything and submit; a confirmation email follows.
Pay the fees in the portal, then book inspections as the work progresses.
Review, corrections and what causes delay
Each application is checked against the Indiana Building Code, the Zoning Ordinance and local standards. The town says it uses an AI-assisted plan review that compares the plans with local codes and flags possible problems, and that town staff verify every item before any decision; the aim is earlier feedback for applicants. Typical holds are an unregistered contractor, a survey without grades or setbacks, missing energy or truss documents for a new house, and work in a drainage easement that has not been accepted by the town.
Inspections in Cedar Lake
Inspections are scheduled with the Planning, Zoning & Building Department once the permit is issued, and fees, including re-inspections, can be paid in GovWell. If an inspector arrives and the work is not ready, the re-inspection fee is $35. New homes need an as-built survey at the final inspection, so book the surveyor early.
Keep erosion and sediment controls working for the whole job and keep mud and debris off town streets; the stormwater page asks residents to report sediment leaving construction sites. Unsafe buildings are handled by the town’s Unsafe Building Commission.
On August 27, 2026 the town posted the hours of FEMA intake centers in Crown Point and Hobart for Lake County residents with uninsured or underinsured home damage. Fixing a damaged house is repair work under the town’s permit rule, so file for a permit before rebuilding; the application also asks whether the lot is in a floodplain.
Indiana building code in Cedar Lake
Cedar Lake approves permits for compliance with the Indiana Building Code (675 IAC) together with its own Zoning Ordinance and local standards. The town published a draft Cedar Lake Vision 2040 Comprehensive Plan for public review on November 5, 2026. FEMA’s Community Status Book lists Cedar Lake (community 180127) as participating in the National Flood Insurance Program, with maps effective January 18, 2012 that are marked as having no elevations determined.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Cedar Lake permit search and official resources
If you applied through GovWell, track the project under My Projects. For older permits or another property’s records, file the town’s Request for Public Records form with the Clerk-Treasurer at Town Hall, or ask the department at buildingdept@cedarlakein.gov. The registered contractor list can be checked online at any time.
- Planning, Zoning & Building Department
- GovWell online permit portal
- Building permit application (rev. August 23, 2023)
- Firefighter safety notification (trusses and I-joists)
- Variance application and BZA fees
- Planning application and Plan Commission fees
- Bulk requirements by zoning district
- Stormwater management and drainage easements
- Registered contractors list
- Town code and ordinances
- Request for public records
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Cedar Lake building permit FAQs
Do I need a permit for a fence or patio in Cedar Lake?
Yes. The department lists decks, patios and fences among the projects that need a building permit, and fences in a drainage easement also need the Town Engineer’s approval.
How do I apply for a permit?
Online through GovWell: create an account, start a New Submittal, choose the permit, upload the forms and plans and submit.
Does my contractor need to register with the town?
Yes. Every contractor working in Cedar Lake must be registered, and registration is also done in GovWell.
How much is a re-inspection?
$35 when the work is not ready at the scheduled inspection.
How much does a variance cost?
$50 for a developmental variance, use variance or appeal, plus the cost of certified mail and the newspaper notice.
Can I build a shed over the drainage easement at the back of my lot?
Only if the town accepts an application first; sheds, driveways, culverts, fill and grade changes in a drainage easement all need approval before work begins.
How long does a variance approval last?
One year: a BZA approval that is not exercised within one year of the decision becomes void unless the board says otherwise.
Is Cedar Lake a city?
No, it is a town in Lake County with its own building department; Lake County does not issue permits inside the town.
Simplify Cedar Lake permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cedar Lake sooner?
Let Alliance prepare, file, and track your Cedar Lake permits while your crew stays on the job.
More Indiana permitting guides
Lake County
Read guide →Crown Point
Read guide →East Chicago
Read guide →Chesterton Building Permit Guide
Read guide →Clay County Building Permit Guide
Read guide →Clinton County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Cedar Lake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.