Skip to main content

Clay County, Indiana Building Permit Guide

To get a building permit in Clay County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Clay County’s government lists no county zoning or building department; the county permits septic systems, wells and driveway culverts, while Brazil runs its own building permits for the city and a 2-mile fringe.

Authority: Clay County Health Department (septic)Brazil: own Planning & Zoning officePhone: (812) 448-9021
County building permit
None listedNo county zoning or building office
Septic
Health Department18 N Walnut St, Brazil
Driveway culvert
Highway permitNo fee; county right-of-way
Brazil
City permitsOver $500 of work, plus 2-mile fringe

Clay County’s official site lists no plan commission, zoning office or building department among its offices, and the commissioners’ recent minutes show no county building permit program. The county offices a builder does deal with are the Clay County Health Department (septic and well permits, 18 N. Walnut Street, Brazil, 812-448-9021), the Highway Department (driveway culverts in the county right-of-way) and the Surveyor. Brazil issues building permits through its Planning and Zoning office, and its 2024 contractor ordinance reaches 2 miles beyond the city limits.

What requires a permit in Clay County?

For unincorporated land, the permits that the county’s own pages describe are about the site rather than the building: a septic permit for any new, modified or repaired onsite sewage system, a well permit for a private water well, a culvert permit to put a driveway pipe in a county road right-of-way, and a utility right-of-way permit for utility companies. The county’s office directory has no planning, zoning or building inspection office, and the commissioners’ 2025 regular-meeting minutes and their May, September and October 2026 minutes record no zoning or building permit business. Ask the commissioners’ office at 812-448-9008 before relying on that for a large project.

County permits

  • Septic systems: new installs, modifications and repairs, residential or commercial (Health Department)
  • Residential water wells (Health Department)
  • Driveway culverts in the county right-of-way (Highway Department, no fee)
  • Utility work in the county right-of-way (Highway Department)

Brazil city permits

  • Any project costing more than $500, labor and materials included
  • Houses, garages, accessory buildings, pools, additions, decks and porches
  • Repairs and replacements on existing structures
  • Demolition and signs
  • No permit for a fence, though height and setback rules apply

What the county decides and what the state holds

Without a county building department, the state rules still apply on their own terms: a Class 1 building needs the state Construction Design Release before construction, and Brazil requires that release with any commercial building permit. On June 12, 2026 the County Commissioners said they opposed a data center in the county and were working on an ordinance for that kind of project; at the September 8, 2026 meeting they said they were waiting on the county attorney, and the minutes posted through October 2026 record no ordinance adopted.

Short on time to read all of this?

Get a free quote →

Clay County building department: who handles permitting

The Health Department, Highway Department and Surveyor are the county offices involved in building on a lot. The Highway Department does no work on roads inside Brazil, Carbon, Center Point, Clay City, Harmony, Knightsville or Staunton, so driveway questions in those places go to the town.

Clay County offices for builders
DetailInformation
Health Department (septic, wells)18 N. Walnut St., Brazil, IN 47834; (812) 448-9021; fax (812) 448-9018; Monday to Friday 8:00 a.m. to 4:00 p.m., closed 11:30 to 12:30
Highway Department (culverts, right-of-way)409 N. State Road 59, Center Point, IN 47840; 812-448-9040; fax 812-448-9058; highway@claycountyin.gov
Surveyor (drainage, right-of-way lines)Courthouse Room 110, 609 E. National Ave., Brazil; 812-448-9017
CommissionersCourthouse Room 106; 812-448-9008
Soil and Water Conservation District551 E US 40, Suite B, Brazil; 812-446-8986
Cities and towns in Clay County
PlaceWho handles permits
Brazil (city)Brazil Planning and Zoning office, City Hall, 203 E National Ave.; 812-446-0050; its contractor ordinance and permit map include a 2-mile fringe
Harmony, Knightsville (towns)A handwritten note on Brazil’s fringe map reads “Harmony & Knightsville No Permitting”; ask each town for its own rules
Carbon, Center Point, Clay City, Staunton (towns)The published sources do not say; ask the town hall

The county GIS map shows parcel lines and can help place a lot inside or outside a town; the Surveyor keeps the annexation descriptions for each city and town.

Clay County permit types

Residential permits

  • Septic system permit. The Health Department’s onsite sewage system application covers new installs, modifications and repairs. It needs the parcel ID and an official address, the installer’s details, the builder for new construction, the number of bedrooms and occupants, the water supply, large fixtures such as jetted tubs over 125 GPM, and a floor plan with the design location. The application expires one year after it is bought, the fee is non-refundable, and any change after the minimum specifications are issued voids it.
  • Well permit. Residential water well applications go to the same office, online or on paper.
  • Septic records. Existing system records are requested on a separate form.
  • Driveway culvert. Owners install their own culvert after the Highway Department approves the application for sizing and ordinance compliance; the county does not supply or install driveway pipes.
  • In Brazil: an improvement location permit from the Planning and Zoning office for structures over 120 square feet or on a permanent foundation, additions, pools and ponds, driveways, grading and other listed work, and a building permit for projects over $500.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

The septic application has a commercial box and asks for the use of the structure and the number of employees. Commercial buildings anywhere need the state design release; inside Brazil the release is filed with the local building permit application.

What comes before the building permit

  • Soil evaluation. An Indiana registered soil scientist takes at least three borings where the septic system will go and sends the results to the Health Department.
  • Right-of-way. Most county roads have a 33-foot right-of-way, 16.5 feet from the center of the road; the Surveyor confirms where it differs.
  • Floodplain. The Surveyor’s office keeps flood zone maps, and the county takes part in the federal flood insurance program.
  • Brazil fringe. Check Brazil’s city and 2-mile fringe map for building permits if the lot is near the city.

Clay County permit costs and fees

The county’s posted pages give two fee rules: the driveway culvert permit is free, and Health Department fees are paid with the application; the department takes business checks but not personal checks, offers online card payment on its forms page, and gives no refunds. The septic application states its fee is non-refundable but does not print the amount; the registrar quotes it at (812) 448-9021.

Rather talk it over?

Call 1-855-478-4290 →
Clay County and Brazil fees and rules
ItemFee or rule
Driveway culvert permit (county)No fee
Septic permit (county)Paid with the application; non-refundable; application valid one year
Brazil building permitGraduated scale printed on the back of each permit, plus inspection fees at issue
Brazil sign permit$1 per sq ft of sign, plus footer and electrical inspection fees
Brazil contractor registration$100 a year; $500,000 liability insurance, workers’ compensation and a $25,000 surety bond
Brazil contractor violationsRevocation of registration or up to $100 a day

Brazil counts labor at the normal local rate when owners do their own work, and values donated materials at their customary cost, when it decides whether a job passes the $500 threshold.

Trade permits and who may pull them

The county itself licenses no contractors on its posted pages. Brazil’s Ordinance 5-2024, adopted August 14, 2024 and in effect since January 1, 2025, requires contractors working for hire in the city, including the 2-mile extra-jurisdictional area, to register with the Planning and Zoning Department in eleven trades: carpentry, roofing, electrical, plumbing, concrete, windows and doors, masonry, excavation, demolition, siding and HVAC. Registration lasts one year and does not replace any state or local trade license. The city’s permit FAQ still says that only electricians and plumbers need to be licensed in Brazil, so ask the office which rule applies to your trade. Plumbing contractors hold a state license from the Indiana Plumbing Commission.

Septic systems must be built by the installer named on the Health Department application, to a design the department has approved.

Rather not deal with the Clay County building department?

Get a free quote →

How to get permits for a Clay County project

1. Place the parcel

Use the county GIS map to see whether the lot is in Brazil, its 2-mile fringe, a town, or the unincorporated county.

2. Apply for the septic permit

File the onsite sewage system application with the parcel ID, official address and fee, online or at 18 N. Walnut Street.

3. Get the soil evaluation

Hire a registered soil scientist, who sends at least three borings to the Health Department.

4. Approve the design

The department issues minimum requirements, the installer designs the system to meet them, and the department approves it.

5. Apply for the culvert

Submit the driveway culvert application to the Highway Department before placing a pipe in the right-of-way.

6. Clear any city permit

In Brazil or its fringe, file the city permit application at least 10 days before work starts.

Review, corrections and what causes delay

The Health Department has 30 days from a complete application to issue or deny a septic construction permit, citing IC 16-41-25-1, and applications without a parcel ID and official address are not accepted. Changing the plan after minimum specifications are issued voids the application. In Brazil the Building Administrator may take up to 10 days to review plans.

Inspections in Clay County

The Health Department inspects every septic system with the excavation open, before the system is covered, and needs at least 2 business days’ notice before digging starts to set the date; skipping that notice can delay the job. After the inspection the installer covers the tank and drain field, and the system may then be used. In Brazil, inspection fees are paid when the permit issues, and the contractor is responsible for calling the building inspector for the required inspections.

Indiana building code in Clay County

FEMA’s Community Status Book lists Clay County (community 180408) as participating in the National Flood Insurance Program for its unincorporated area, with flood maps effective September 2, 2011.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Clay County permit search and official resources

Existing septic records are requested from the Health Department on its septic records request form, online or on paper. County commissioners’ minutes from 2024 onward are posted in the county’s online document library, and the Surveyor’s office holds drain files, flood zone maps and legal surveys.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Clay County permit FAQs

Does Clay County issue building permits?

The county lists no building or zoning department, and the commissioners’ recent minutes show no county building permit program; it issues septic, well and culvert permits.

Who issues septic permits in Clay County?

The Clay County Health Department, 18 N. Walnut Street, Brazil, (812) 448-9021, after a soil scientist’s evaluation and an approved installer design.

How long does a septic permit take?

The department has 30 days from a complete application to issue or deny it.

Do I need a permit for a driveway culvert?

Yes, in a county right-of-way. The Highway Department’s permit is free, and the owner installs the culvert.

Does Brazil need a permit for my project?

Inside Brazil, any project costing more than $500 needs a building permit, and its contractor rules reach 2 miles past the city limits.

Do I need a permit for a fence in Brazil?

No, but front-line fences are limited to 3½ feet, side and rear fences to 7 feet, and fences must sit 1 foot inside the lot lines.

Is a data center ordinance in effect?

The commissioners said in June 2026 they were working on one; the minutes posted through October 2026 show none adopted.

Simplify Clay County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Clay County sooner?

Let Alliance prepare, file, and track your Clay County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Clay County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.