Putnam County, Indiana Building Permit Guide

To get a building permit in Putnam County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Putnam County’s Planning and Building Department in the Greencastle courthouse issues improvement location and building permits for unincorporated land and five towns; the City of Greencastle runs its own.

Authority: Putnam County Planning and BuildingFees: 2026 fee breakdownPhone: (765) 301-9108
Authority
Planning and BuildingCourthouse, 4th floor, Room 46
New house
$400 + $0.20/sq ftOver 1,000 sq ft, plus $300 inspections
Contractors
County listing, $100/yr$20,000 bond
Inspections
9 a.m. to 3 p.m.24 hours’ notice

In Putnam County, the Planning and Building Department at the courthouse, 1 West Washington Street, 4th floor, Room 46, Greencastle ((765) 301-9108), issues improvement location permits and building permits for all unincorporated land and for the towns of Bainbridge, Cloverdale, Fillmore, Roachdale and Russellville; Lisa Zeiner is its Director and Building Administrator. The City of Greencastle handles its own zoning and permits. Under the 2026 fee breakdown a new house costs $400 plus $0.20 for each square foot over 1,000, plus a $300 inspection fee.

What requires a building permit in Putnam County?

The county building code (chapter 150, as filed with the state in 2022) says construction may not start without a valid building permit from the Building Commissioner, and the department’s permit list and 2026 fee breakdown show the work it covers. Building before the improvement location permit or other required permit is issued costs twice the normal fee.

County permit applications

  • New houses and accessory dwellings
  • Additions and alterations
  • Attached decks and porches
  • Detached garages, sheds and other accessory buildings
  • Modular and manufactured homes
  • Above-ground, in-ground and indoor pools and hot tubs
  • Fences, signs, solar panels and electrical work
  • Demolition and cell towers
  • Commercial, educational, church and storage buildings

Other approvals that may apply

  • Improvement location permit (zoning) from the same office
  • Septic permit from the Health Department
  • Driveway permit from the County Highway Department or INDOT
  • Stormwater permit for disturbing an acre or more
  • Floodplain review in a mapped flood zone
  • State design release for commercial buildings

The fee sheet lists a $60 roof permit only for structural changes to trusses or rafters, and prices a residential alteration by the inspections it needs. The residential checklist asks applicants to confirm the lot is not in a flood zone or classified forest before filing.

What Putnam County decides and what the state holds

The county writes its own building code (chapter 150 of the county code), fee breakdown, contractor listing rules, Unified Development Ordinance and stormwater ordinance, and its department is also the floodplain administrator. Every commercial building needs a state Construction Design Release from the Indiana Department of Homeland Security before the county will permit it, and the county building application demands a licensed plumber’s license number for plumbing work.

Putnam County building department: who handles permitting

The Planning and Building Department handles land use, zoning, building permits, inspections and floodplain administration for the unincorporated county, and staffs the Plan Commission and Board of Zoning Appeals. Its reach into the towns differs by service, so check the table for the address.

Short on time to read all of this?

Get a free quote →
Who permits where in Putnam County
PlaceBuilding permits / zoning
Unincorporated Putnam CountyCounty building permits; county zoning (Area Plan Commission)
BainbridgeCounty building permits; the department is zoning administrator, with Bainbridge’s own plan commission packet
Cloverdale, Roachdale, RussellvilleCounty building permits; members of the Area Plan Commission
FillmoreCounty building permits and inspections under an interlocal agreement; not on the county zoning list, and complaints go to the town
Greencastle (city)Not covered by the county department; zoning through the Greencastle City Planner
Putnam County permit offices
OfficeContact
Planning and BuildingCourthouse, 1 W. Washington St., 4th floor, Room 46, Greencastle; (765) 301-9108; planning@co.putnam.in.us
Director / Building AdministratorLisa Zeiner
Health Department, Environmental(765) 653-0203, option 2; weekdays 8:00 a.m. to 4:00 p.m., closed noon to 1:00 p.m.
County GIS / plat officeCourthouse, 4th floor; 765-653-0248

To see which zoning applies to a parcel outside Greencastle, open the county GIS site and switch on its zoning layer.

Putnam County permit types

The department posts separate applications, revised in May and July 2026, for each kind of work: accessory dwelling, building, cell tower, commercial, deck and porch, demolition, detached accessory, electrical, fence, modular and manufactured home, permit renewal, sign, solar and swimming pool.

Residential permits

  • New homes and accessory dwellings use the building application. It asks for sewer type (public or septic), heating fuel and electric utility, the floor, basement, garage and covered porch areas, the foundation type, any advanced structural components such as roof trusses or I-joists, the energy compliance method, and a licensed plumber’s license number. The prescriptive energy paths are 2x6 walls with R-19, or 2x4 walls with R-13 plus R-5 or R-15 plus half-inch foam; walls of 2x4 with R-13 or R-15 alone need a blower door test.
  • Plan review. The residential checklist covers footing depth, slab insulation, foundation drains, a conditioned or vented crawl space, egress windows (opening at least 24 by 20 inches, sill no higher than 44 inches, 36-inch window wells with a ladder), attic access, complete elevations, roof slopes, chimney height and fireblocking, framing plans with spans, and truss plans before framing.
  • Accessory buildings use the detached accessory or deck and porch applications and their own plan review checklist.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial buildings, additions, educational, institutional and church buildings, storage buildings, apartments and hotels use the commercial application and the commercial plan requirements, and need the IDHS design release first. The department’s Technical Advisory meeting lets petitioners and developers review proposed projects with staff; the next one is at 9:00 a.m. on November 24, 2026 in the courthouse’s second-floor meeting room.

What comes before the building permit

  • Improvement location permit. Zoning approval from the same department under the Unified Development Ordinance adopted December 4, 2023.
  • Septic. The Health Department’s septic permit must be issued before construction starts on a septic system and before the building permit.
  • Driveway. A driveway permit from the Putnam County Highway Department, or from INDOT on a state highway.
  • Stormwater. Development disturbing an acre or more, including ponds, files a stormwater, erosion control and drainage plan under the county ordinance and technical standards, plus IDEM’s construction general permit.
  • Plan Commission and BZA. Both meet on the second Thursday, at 6:00 p.m. and 7:00 p.m., in the courthouse’s first-floor Commissioners’ meeting room.
  • HOA approval. Where a property owners’ association exists, its approval letter goes in with the application.

Putnam County permit costs and fees

The department’s 2026 fee breakdown sets permit fees by type of work. The sheet notes that its fees do not include the cost of each inspection ($60), shows the accessory-structure lines as totals, and charges $60 for a single inspection or a reinspection.

Putnam County permit fees (2026 fee breakdown)
WorkFee
Primary and accessory dwellings$400 per unit + $0.20 per sq ft over 1,000; $300 inspection fee (5 inspections); $20 certificate of occupancy
Residential addition / alteration$360 / $60 per inspection
Manufactured home, double-wide / single-wide or temporary$460 / $240
Attached deck / detached accessory building / prebuilt accessory$180 / $270 / $120
Pools: above-ground / in-ground / indoor spa or hot tub$120 / $240 / $180
Electrical / fence / roof with structural changes$60 each
Demolition / solar panels$110 / $135
Sign$100 + $2 per sq ft of sign face
Commercial, educational, institutional or church building$1,000 + $0.20 per sq ft; $60 per inspection; $20 certificate of occupancy
Commercial addition$600 base; $60 per inspection; $20 certificate of occupancy
Storage buildings$2,000 + $0.20 per sq ft; $60 per inspection; $60 electrical if applicable; $20 certificate of occupancy
Apartments, hotels and motels$2,000 + $0.10 per sq ft; $180 inspection fee per unit; $20 certificate of occupancy
New cell tower / storage tanks$1,120 / $120
Work started before the ILP or permitTwice the permit fee

Rather talk it over?

Call 1-855-478-4290 →

Worked example from the house line: a home with 2,000 square feet as the department counts it pays $400 + (1,000 × $0.20) = $600 for the permit, plus the $300 inspection fee and the $20 certificate of occupancy, or $920. The application collects living, basement, garage and covered porch areas separately, so confirm which areas the department counts. Under the county building code as filed with the state, a permit can be renewed once before it expires for 80% of the original fee (a full year) or 40% (six months), with a $60 minimum. Contractor listing costs $100 a year, and the comprehensive plan and UDO books sell for $40 and $60.

Trade permits and who may pull them

Anyone engaged in construction work that needs a county building permit must be a listed contractor. Listing is renewed every year with an application, a $100 fee, a surety bond of at least $20,000 payable to Putnam County, and proof of liability insurance naming the County Commissioners as additional insured. An individual building a dwelling or structure for their own use or occupancy signs the Contractor Listing Exemption affidavit instead and takes on all responsibility for the construction, permits, fines and penalties.

  • Electrical. A separate electrical application and a $60 electrical final inspection for stand-alone electrical work; new homes include a rough inspection among their five.
  • Plumbing. The building application will not be complete without a licensed plumber’s name, company and license number.
  • Mechanical. Heating fuel and air conditioning type are recorded on the building application.
  • Septic. Installed only under a Health Department permit.

The department also handles complaints about building code violations, unsafe buildings and zoning violations for the unincorporated county and the towns of Bainbridge, Roachdale and Russellville, on a signed complaint form; complaints in Greencastle or Fillmore go to the city or town.

Rather not deal with the Putnam County building department?

Get a free quote →

How to apply for a Putnam County building permit

1. Check the parcel

Confirm it is outside Greencastle, look up its zoning on the county GIS, and check flood zone and classified forest status.

2. Get the septic and driveway permits

Apply to the Health Department for the septic permit and to the Highway Department or INDOT for the driveway.

3. List the contractor or sign the exemption

Every contractor needs a current county listing; an owner-builder signs the exemption affidavit.

4. Complete the right application

Pick the 2026 form for the work, fill in the energy method and plumber’s license, and sign the affidavit.

5. Submit plans and the plot plan

Bring or send building plans, the plot plan, any HOA letter and the application fee to Planning and Building in Room 46.

6. Start within three months

Book the first inspection; under the county code as filed with the state, work must start and pass a foundation inspection within three months, and the permit is valid for one year.

Review, corrections and what causes delay

The residential checklist is the department’s review list, so missing truss plans, egress details or energy information are common reasons for corrections. Zoning petitions for the Plan Commission or BZA are due by 3:30 p.m. on the deadline date by email or in person; the deadline for the January 2027 meeting is December 11, 2026, and items filed for December carry over to January because the December 10 meeting is reserved for the public hearing on the updated UDO. Commercial work waits on the state design release.

⚠️ UDO update hearing. The Plan Commission will hold a public hearing on proposed changes to the Unified Development Ordinance (Draft C, dated November 2, 2026) at 6:00 p.m. on December 10, 2026 at the courthouse. Until adopted, the December 4, 2023 UDO applies.

Inspections in Putnam County

Call (765) 301-9108 at least 24 hours ahead; inspections run Monday to Friday between 9:00 a.m. and 3:00 p.m., same-day inspections are not offered, and booking early is advised because slots are not guaranteed. Your building permit lists the inspections the project needs. A new house gets five: footer, foundation, rough-in, insulation and final; a double-wide manufactured home gets footer, foundation, electrical and final; decks and detached buildings get post hole and final; in-ground pools get lower bonding, upper bonding and final; demolition gets pre- and post-demolition visits.

A $20 certificate of occupancy applies to new dwellings and commercial buildings. Reinspection fees ($60) are due before the reinspection or before the certificate of occupancy. Stormwater sites are closed out with the county’s termination inspection checklist.

Indiana building code in Putnam County

Putnam County adopts the state building rules by reference in chapter 150 of its county code, and its department is the floodplain administrator for unincorporated land. FEMA lists unincorporated Putnam County as participating in the National Flood Insurance Program, with flood maps effective June 5, 2012.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Putnam County building permit FAQs

Does Putnam County issue building permits in Greencastle?

No. The county department covers unincorporated land and the towns of Bainbridge, Cloverdale, Fillmore, Roachdale and Russellville; Greencastle handles its own.

How much is a building permit for a new house in Putnam County?

$400 plus $0.20 per square foot over 1,000, plus a $300 inspection fee and a $20 certificate of occupancy; 2,000 counted square feet comes to $920.

Can a homeowner build without a listed contractor?

Yes, for a dwelling or structure for their own use, by signing the Contractor Listing Exemption affidavit and accepting responsibility for permits and penalties.

Do I need a permit for a fence or a shed?

Yes. A fence permit is $60, and detached accessory buildings are $270 ($120 for a prebuilt one), each with its own application.

What happens if I start before getting a permit?

Starting before the improvement location permit or other required permit is issued doubles the permit fee.

When can I get an inspection?

Monday to Friday, 9:00 a.m. to 3:00 p.m., with at least 24 hours’ notice by phone at (765) 301-9108.

Do I need a septic permit first?

Yes. On land without sewer the Health Department’s septic permit must be issued before the county building permit.

Putnam County permit search and official resources

For a past permit or inspection record on a county permit, contact the Planning and Building Department at planning@co.putnam.in.us or (765) 301-9108. Plan Commission and BZA agendas and approved minutes are posted on the department page, and meetings have been livestreamed on the county’s YouTube channel since July 1, 2025. The Health Department has its own public records search form for septic files.

Inspections are where schedules slip.

Get a free quote →

Simplify Putnam County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Putnam County sooner?

Let Alliance prepare, file, and track your Putnam County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Putnam County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.