Clinton County, Indiana Building Permit Guide

To get a building permit in Clinton County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Area Plan Commission of Clinton County issues use and building permits and inspects construction in the unincorporated county and in Mulberry, Rossville, Kirklin and Colfax; Frankfort runs its own office.

Authority: Area Plan Commission of Clinton CountyFiling: By email, digitallyPhone: 765-659-6302
Authority
Area Plan Commission2 E Washington St., Suite 104, Frankfort
Serves
County + 4 townsMulberry, Rossville, Kirklin, Colfax
New house
7 inspections24-hour notice, pre-paid
Hours
Mon–Fri 8–4765-659-6302

The Area Plan Commission of Clinton County, at 2 E Washington Street, Suite 104, Frankfort (765-659-6302), issues improvement location and building permits and does the building inspections for unincorporated Clinton County and the towns of Mulberry, Rossville, Kirklin and Colfax. Permits are handled digitally: you email the project details to the office to start. Before a permit issues, the Surveyor, the Highway Department and, where there is no sewer, the Health Department must sign off, and a new house typically gets seven inspections.

What requires a building permit in Clinton County?

The Clinton County Unified Development Ordinance (UDO), adopted in 2015 and posted in a version revised August 15, 2024, requires an improvement location permit (ILP) before anyone occupies or uses land, builds, rebuilds, moves, alters or enlarges a structure, or changes a use. No other county or town permit for the work may be issued until the ILP is, and no utility may connect service to a new location without one. The UDO and the commission’s answers to common questions also list work that needs no permit.

Permit needed

  • New houses, duplexes and manufactured or mobile homes
  • Additions, remodels and alterations
  • Accessory buildings over 200 square feet, including pole barns
  • Decks attached to a building, or 30 inches or more above grade
  • In-ground pools and pools 42 inches deep or more
  • Repairs or changes to roof framing
  • Grain bins and electric meter bases
  • Changes of use (a certificate of occupancy is required even without an ILP)

No ILP needed

  • Fences that meet the UDO’s fence rules
  • Sheds of 200 square feet or less, and portable structures of that size
  • Above-ground pools under 42 inches deep
  • Single-story porches and decks under 30 inches high and not attached to another structure
  • Pre-manufactured carports of 576 square feet or less
  • Hobby greenhouses under 500 square feet
  • Replacing only shingles or roof decking

Exempt items still have to meet setbacks and the other standards for their location, and work in the floodplain overlay can need a floodplain permit even where the list says no ILP. The commission caps roofs at two layers of shingles.

What the county decides and what the state holds

The UDO covers unincorporated land once adopted by the County Commissioners and the land inside each participating town once its Town Council adopts it. The commission sets its own fee schedule, assigns addresses, reviews development plans and holds hearings, and its inspectors enforce the state’s residential, plumbing, electrical, mechanical, energy, fire and fuel gas codes, which it lists for the county and the four towns. Indiana adopts those codes and issues the design release for Class 1 buildings. A permit may not be issued while a project conflicts with the rules of the County Surveyor, a health department, a highway authority, the County Commissioners, the State Building Commissioner, IDEM or DNR.

Short on time to read all of this?

Get a free quote →

Clinton County building department: who handles permitting

The Area Plan Commission office reviews proposed developments, runs public hearings before the Area Plan Commission and Board of Zoning Appeals, issues use and building permits, assigns addresses, handles complaints about property conditions and does building inspections. The county’s largest city, Frankfort, has its own Building Services, Planning and Zoning department.

Clinton County permit contacts
DetailInformation
Area Plan Commission2 E Washington St., Suite 104, Frankfort, IN 46041; 765-659-6302; Monday to Friday, 8:00 a.m. to 4:00 p.m.
Starting a permitEmail the project details to the office’s administrative assistant (address on the commission page)
Surveyor and Drainage Board2 E Washington St., Suite 106; 765-659-6300
Highway Department (driveways)2095 Burlington Ave., Frankfort; 765-659-6379
Health Department (septic)1234 Rossville Ave., Frankfort; (765) 659-6385
Cities and towns in Clinton County
PlaceWho handles permits
Unincorporated countyArea Plan Commission of Clinton County
Mulberry, Rossville, Kirklin, Colfax (towns)Area Plan Commission of Clinton County
Frankfort (city)City of Frankfort Building Services / Planning / Zoning, (765) 654-5278
Michigantown (town)Not listed among the towns the commission serves; the published sources do not say, so ask the Area Plan Commission

The county’s Beacon GIS site, linked from the commission page, carries the zoning maps and property records.

Clinton County permit types

Building permits are started by email; the commission’s petition forms for hearings are posted as PDFs, with a note that only the copies held at the office are official.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

  • New houses and duplexes need the ILP site plan, the Surveyor’s drainage approval with a minimum first-floor elevation, Health Department approval if the home is not on sewer, and the Highway Department’s driveway approval.
  • Mobile and manufactured homes need Health Department approval when placed on a site without sewer.
  • Remodels that add bedrooms on a septic system need Health Department approval.
  • Accessory buildings above the shed and carport limits need a permit; monolithic footings for detached garages, carports and accessory buildings may not exceed 720 square feet.
  • Decks and porches need a permit if attached to a building or 30 inches or more above grade.
  • Pools need a permit when in-ground or 42 inches deep or more.

Commercial permits

Industrial, multi-family, wind energy (commercial or non-commercial), community and public facility projects need a review by the Building Inspector before the permit issues, to set the inspections the job will need. The UDO also lists commercial uses among the cases that need Board of Health approval under the private sewage disposal ordinance, development plans go to the Area Plan Commission (with a separate form for the State Road 28 overlay district), and solar projects use a solar development plan or solar overlay rezoning petition. A Class 1 building needs the state Construction Design Release.

What comes before the building permit

  • Drainage. Written approval from the County Surveyor under the county drainage ordinance; for any dwelling, the Surveyor also sets a minimum first-floor elevation, and the owner must certify it once the floor is placed or face a stop-work order.
  • Septic. Written approval from the Board of Health under the county private sewage disposal ordinance where the home will not be on sewer.
  • Driveway. Written Highway Department approval for a drive onto a county road.
  • Floodplain. Extra elevation, flood-opening, anchoring and utility information for lots in the floodplain overlay; a watercourse change needs DNR approval and a FEMA conditional letter of map revision before construction.
  • Wetlands within 100 feet of disturbed ground must be marked on site until construction ends.

Clinton County permit costs and fees

Under the UDO, the Area Plan Commission sets a schedule of fees for permits, petitions, plats and other actions, and every ILP application must include the fee it sets. The schedule is not posted with the ordinance and forms, so ask the office at 765-659-6302 for the amount for your project. Inspections must be paid in advance, before any can be scheduled, and failed inspections that need a return visit are billed as extra inspections.

Rather talk it over?

Call 1-855-478-4290 →
Clinton County costs outside the permit fee
ItemAmount or rule
Driveway bond (to build the drive after the house)$300 cashier’s check to the County Treasurer; drive must be built within 12 months
Health Department online paymentsConvenience fee of $0.40 plus 1.96%
Extra inspections after a failureCharged per extra inspection
Expired ILPNew permit and new filing fees

On Class 1 work, the state design release fee is paid to the state with the release application, separately from the county’s fees.

Trade permits and who may pull them

The commission’s inspection sequence for a house includes the trades: it checks under-floor plumbing with a pressure test before the slab, the electric service before power is connected, and all rough-ins with framing. Electric meters anywhere in the county are to be installed to Frankfort Power & Light guidelines, whichever utility serves the meter, and the ground wire may not pass through the meter base. The commission’s pages describe no county contractor license or registration; plumbing contractors hold a state license from the Indiana Plumbing Commission. Septic systems are approved by the Health Department.

How to apply for a Clinton County building permit

1. Check jurisdiction

Confirm the parcel is outside Frankfort and in the county, Mulberry, Rossville, Kirklin or Colfax.

2. Get the driveway approved

Flag the drive location, call the Highway Department between 8:00 a.m. and 3:30 p.m. and meet the superintendent on site with your plat.

3. Get Surveyor and Health approval

Drainage approval and first-floor elevation from the Surveyor; septic approval from the Board of Health if needed.

4. Email the project

Send the project details to the Area Plan Commission, which starts the permit digitally and asks for the site plan and other documents.

5. Pay fees and inspections

Pay the permit fee and pre-pay the inspections.

6. Build within six months

Finish within six months of issue, or ask for an extension before the permit runs out.

Rather not deal with the Clinton County building department?

Get a free quote →

Review, corrections and what causes delay

The Zoning Administrator has 15 days from a complete application to approve or disapprove the ILP, with written reasons for a refusal. The Highway Department faxes its driveway approval, or the bond, to the Building and Zoning Department because a drive approval is required first. Up to two extensions of up to three months each can be granted if requested before the permit expires; after that, or if the permit lapses, a new ILP and new fees are needed. Departing from the approved site plan voids the permit.

Inspections and certificates in Clinton County

Give 24 hours’ notice for every inspection; a valid permit and pre-paid inspections are required before one can be booked. Footers, walls and under-floor plumbing must be inspected before any concrete is poured.

Typical inspections (APC Inspection Guide 2021)
Permit typeTypical inspections
Single-family dwelling or duplex7: footing, pre-slab or basement wall, foundation walls, electric service, framing with rough-ins, insulation, final
Single- or double-wide mobile home3, plus 2 on a basement
Addition to a home3, plus 2 on a basement
Remodel or permanent accessory building2, plus a meter inspection if needed
Non-permanent accessory structure or grain bin1, plus a meter inspection if needed
Deck, porch or balcony2
Above-ground / in-ground pool1 / 2
Electric meter base1

An ILP request is also a request for a certificate of occupancy. Tell the office in writing within seven days of finishing the building; the Executive Director or Zoning Administrator then has 15 days to issue the certificate or a written denial. New homes also need the Health Department’s signed certificate of inspection, and buildings in the floodplain overlay need an as-built elevation certificate from a registered land surveyor first.

Want this handled start to finish?

Get a free quote →

Indiana building code in Clinton County

FEMA’s Community Status Book lists Clinton County (community 180029) as participating in the National Flood Insurance Program for its unincorporated area, with new flood maps taking effect on January 22, 2027. Frankfort participates separately (community 180030).

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Clinton County permit search and official resources

For a past permit, inspection or zoning decision in the commission’s area, contact the Area Plan Commission office, which posts its agendas and recent minutes on its page. Drainage Board agendas and minutes are on the Surveyor’s page, and property records and zoning maps are on the county’s Beacon GIS site.

Inspections are where schedules slip.

Get a free quote →

Clinton County building permit FAQs

Do I need a permit for a shed in Clinton County?

Not for a shed of 200 square feet or less: the UDO exempts temporary and permanent sheds of that size, and the commission’s FAQ says the same for portable structures. Setbacks still apply, and larger accessory buildings need a permit.

Do I need a permit for a deck?

Not if it is under 30 inches from natural grade to the deck surface and not attached to a structure; otherwise yes, with two inspections.

Do I need a permit to re-roof?

Not for replacing only shingles or decking; repairs or changes to the roof framing need a permit, and no more than two layers of roofing are allowed.

How do I apply?

Email your project details to the Area Plan Commission office, which handles building permits digitally, or call 765-659-6302.

How much notice do inspections need?

24 hours, and only after the permit is issued and the inspections are paid.

How long does a permit last?

Work must be finished within six months, with up to two three-month extensions if requested before expiry.

Does the commission issue permits in Frankfort?

No. Frankfort has its own Building Services, Planning and Zoning department; the commission serves the county and Mulberry, Rossville, Kirklin and Colfax.

Simplify Clinton County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Clinton County sooner?

Let Alliance prepare, file, and track your Clinton County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Clinton County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.