To get a building permit in Boone County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Boone County Area Plan Commission office in Lebanon issues improvement location (building) permits for unincorporated Boone County and the Town of Advance; packets are sent in as PDFs and the fee is paid when the permit is picked up.

Authority: Boone County Area Plan CommissionFees: $160 base fee plus inspections (March 4, 2026)Phone: 765-482-3821
Authority
Area Plan CommissionRural county and Advance
Base fee
$160Plus each inspection
Inspections
24-hour noticeCall 765-482-3821
Office
Mon–Fri 8–4116 W. Washington St., Lebanon

Outside the cities and towns that run their own departments, Boone County building work is permitted by the Boone County Area Plan Commission (APC), which serves the unincorporated county and the Town of Advance from Suite 101 of the county office building at 116 W. Washington St., Lebanon (765-482-3821). Since March 4, 2026 a permit costs a $160 base fee plus a set charge for every inspection the job needs, and the fee is paid in cash or by check when the permit is ready.

What requires a building permit in unincorporated Boone County?

The APC calls its building permit an improvement location permit, and its October 2026 residential packet lists what needs one. Lebanon, Zionsville, Whitestown and the other towns with their own offices set their own lists.

Permit required

  • New single-family and two-family homes, accessory dwellings and the placement of a manufactured home
  • Additions to houses and to accessory buildings
  • Barns, pole barns, garages, carports, decks, enclosed patios, gazebos, greenhouses, sheds and any other structure larger than 50 square feet
  • Fences taller than 6 feet
  • In-ground and above-ground swimming pools
  • Electrical service changes, remodels, roof upgrades, demolition and temporary mobile homes, each under its own form or fee line

No permit

  • Fences under 6 feet tall
  • Small structures of 50 square feet or less that the packet does not otherwise list

A house outside a platted subdivision is a “restricted use” in the Agriculture (AG) district, so the owner must first file a Review of Residential in AG application before the building permit. Every permit or petition granted by the office gets at least one site inspection before approval.

⚠️ Data center moratorium. Ordinance 2026-08, adopted by the Board of Commissioners on June 15, 2026, stops the filing, processing, review and acceptance of all applications related to data center facilities from June 16, 2026 until June 15, 2027.

What the county decides and what the state holds

The county writes its own zoning ordinance (posted with amendments through December 2025), subdivision control ordinance (amended May 2026), floodplain and unsafe building ordinances, overlay districts for I-65, major thoroughfares and energy projects, and its own permit fees. The state sets the building codes the inspector applies and the Construction Design Release for Class 1 buildings; the county’s commercial checklist asks for the full state release, any state variance and the local fire marshal’s approval before it issues a permit.

Boone County building department: who handles permitting

The Area Plan office administers and enforces zoning, floodplain, building and unsafe-structure rules for its area, keeps the records of the Area Plan Commission, the Plat Committee and the Board of Zoning Appeals, and issues improvement location permits. Nicole M. Schell is the Executive Director.

Short on time to read all of this?

Get a free quote →
Boone County Area Plan Commission office
DetailInformation
OfficeBoone County Office Building, 116 W. Washington St., Suite 101, Lebanon, IN 46052
Phone / fax765-482-3821 / 765-483-5241
HoursMonday to Friday, 8 a.m. to 4 p.m.
Area servedUnincorporated Boone County and the Town of Advance
BoardsArea Plan Commission and Board of Zoning Appeals; posted meetings on December 2 and December 9, 2026 at 7 p.m.

Cities and towns in Boone County

Find the 10-digit county parcel number and the city or town limits on the Boone County GIS map viewer before you file; the packet will not accept the state parcel ID.

Who permits building work in each Boone County community
CommunityPermit office
Unincorporated county and Advance (town)Boone County Area Plan Commission, 765-482-3821
Lebanon (city)City of Lebanon Planning Department, 401 S. Meridian St. (Lebanon guide)
Zionsville (town)Zionsville Planning & Building Department, 1100 W. Oak St. (Zionsville guide)
Whitestown (town)Whitestown Building Department, 6210 Veterans Drive (Whitestown guide)
Thorntown (town)Town of Thorntown: its Unified Development Ordinance of May 4, 2026 sets its own improvement location and building permit process; Town Hall, 101 W. Main St., 765-436-2205
Jamestown (town; part of it lies in Boone County)Town of Jamestown building permits and zoning; Municipal Building, 765-676-6331
Ulen (town)Not named among the places the APC serves; ask the APC office (765-482-3821) which office handles a Ulen address

Boone County permit types

The APC sorts its forms into residential, residential electrical and remodel, commercial-industrial, commercial electrical, demolition and home occupation applications, plus the Review of Residential in AG packet and separate floodplain, BZA and APC petition packets.

Residential permits

The single- and two-family packet covers new homes, accessory dwellings, manufactured homes, accessory structures, additions, tall fences and pools. Its checklist asks for the signed application, a site plan, construction plans that include the HVAC, plumbing and electrical layout, an energy efficiency certificate, the septic and well permit or the sewer and water release, the driveway permit, the drainage permit and a recorded deed with the Recorder’s stamp. For a new structure or an addition, a registered professional surveyor must draw the site plan and show the sewage and water connections, drainage and spot elevations, and the packet adds that APC Development Plan approval is required before the permit is issued. A consent form is needed when the applicant is not the owner.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

For commercial and industrial work the county issues a single blanket permit that covers every trade, so tradespeople do not get separate permits. New commercial or industrial buildings, buildings with three or more dwelling units, and wireless, solar and wind projects need Development Plan approval from the APC first. The checklist adds a narrative of the use, landscape and erosion control plans, dimensioned elevations, the state design release and any state variance, local fire marshal approval and, for kitchens, food preparation and pools, Boone County Health Department approval.

What comes before the building permit

  • Zoning approvals. Rezonings, development plans and major subdivisions go to the Area Plan Commission; variances, special exceptions and appeals go to the Board of Zoning Appeals. Neighbors within 660 feet are notified of hearings.
  • Septic and well. Onsite sewage systems are permitted and inspected by the Boone County Health Department (116 W. Washington St., Room B201, 765-483-4458), starting with a soil report from a soil scientist and a certified plot plan.
  • Driveway. A county road entrance needs a Boone County Highway Department driveway permit (1955 Indianapolis Rd., 765-482-4550; $200 for a residential drive); a state road needs INDOT (765-362-3700). The certificate of occupancy waits until the drive is accepted.
  • Drainage. The County Surveyor (Room 102, 765-483-4444) issues a drainage permit for any new structure, addition or pond inside the county drainage jurisdiction, and nothing may be built or planted in a regulated drain easement.
  • Floodplain. The APC administers the county floodplain ordinance and keeps the official flood maps; use its 2026 floodplain development permit packet in a mapped flood area.

Boone County permit costs and fees

The APC replaced its old square-foot schedule, used from January 1, 2011 to March 4, 2026, with a schedule based on review time and inspections. After review you receive a fee calculation worksheet that itemizes the charge. Fees are paid only when the permit is issued and ready to collect, in cash or by check to the Boone County Treasurer.

Rather talk it over?

Call 1-855-478-4290 →
Boone County APC building permit fees (effective March 4, 2026)
ItemFee
Base fee (every permit; includes up to 2 hours of structural plan review, processing and scheduling)$160
Additional structural plan review$45 per hour, billed in 15-minute steps
Site plan and ordinance review$150 per hour, billed in 15-minute steps
Footing, under-slab, foundation, temporary electric or single-trade rough-in inspection$45 each
Full rough-in (HVAC, plumbing, electric, framing)$90
Insulation and energy efficiency inspection$70
Final / final with certificate of occupancy$45 / $90
Electrical service change or upgrade only$65
Fence or roof upgrade$50 each
Demolition / sign$100 / $100 plus inspections
Temporary mobile home$155 for the first two years, then $300 a year
Construction trailer / home occupation registration$100 each
New cell tower / co-located antenna$250 / $50
Starting work without a permitPermit fee charged again on top of the permit (double)
Construction error requiring a variance5 times the original permit fee plus the variance fee

Re-inspections and unplanned extra inspections are charged at the price of that inspection and must be paid before the inspector returns or before the certificate of occupancy. As an illustration, a house that needs footing, foundation, full rough-in, insulation and a final with certificate of occupancy carries $340 in inspection charges on top of the $160 base fee, with any site plan review billed separately by the hour. Board petitions since October 6, 2025 cost $800 for a variance or special exception, $200 for each additional variance, and $1,000 for a development plan, a rezoning or PUD, or a minor residential subdivision.

Trade permits and who may pull them

Trade work in the APC’s area is not split into separate trade permits on commercial jobs: the blanket commercial permit carries electrical, plumbing and mechanical work, and the plans must show all three layouts. On homes, electrical-only work (new service, reinstated service or upgrades), remodels, basement finishes and fire repairs share one residential application, and the inspection list prices single-trade rough-ins separately.

  • Plumbing: both residential applications ask for the plumbing contractor’s name and state license number, matching Indiana’s licensing of plumbing contractors.
  • Electrical and HVAC: the application asks for the contractor’s name and contact details; the county’s posted forms and fee schedule show no separate county contractor license or registration fee.
  • Owners: the forms have separate owner and contractor sections, and an owner-applicant signs the same application; a consent form is needed when someone other than the owner applies.
  • Code questions: the inspection page directs state and international building code questions to the county building inspector by email.

Rather not deal with the Boone County building department?

Get a free quote →

How to apply for a Boone County building permit

1. Confirm the office

Look up the parcel on the Boone County GIS viewer, note the 10-digit county parcel number, and make sure it is outside Lebanon, Zionsville, Whitestown, Thorntown and Jamestown.

2. Clear zoning first

File the Review of Residential in AG for a house outside a platted subdivision, or a development plan, variance or special exception where the project needs one.

3. Collect the outside permits

Get the septic and well permits (or sewer and water release), the county or INDOT driveway permit, the surveyor’s drainage permit and the recorded deed.

4. Send the packet as PDFs

Submit electronically, one PDF per checklist item named to match the item; image files are refused. Paper is accepted only with digital plans.

5. Book the filing appointment

When review of the submittal is done, the office emails instructions to complete the filing.

6. Pay and pick up

Pay the worksheet total in cash or by check to the Boone County Treasurer when the permit is ready; the office never asks for wire transfers.

Review, corrections and what causes delay

Missing outside permits, a site plan not drawn by a surveyor, a state parcel ID instead of the county number, or files sent as images all hold a packet up. Projects that need Development Plan approval or a BZA hearing wait for that decision before the permit. The application states that work must start in good faith within 90 days or the application is void. Since January 1, 2026 state law (IC 36-7-2.5) also gives local units deadlines for one- and two-family permits: 3 business days to say an application is complete and 7 business days for plan review.

Inspections and certificates

Call the APC office at 765-482-3821 at least 24 hours ahead with the permit number, the permit holder’s name and the type of inspection. The fee schedule names the stages a job may need: temporary electric, footing, under-slab, foundation, rough-in (full or single trade), insulation and energy efficiency, and final. New conditioned buildings and additions must also meet the APC’s energy code checklist, including the insulation certificate posted at the electric panel and air-sealing or blower-door verification.

A failed inspection, or more inspections than planned, triggers a re-inspection fee that must be paid before the next visit or before the certificate of occupancy, at the inspector’s discretion. A final that issues a certificate of occupancy costs $90, and where a county road driveway was permitted, the certificate also waits for the Highway Department to accept the drive.

Indiana building code in Boone County

The APC applies the state codes through its building regulations and publishes an energy code sheet for new homes, additions and conditioned accessory buildings. FEMA’s Community Status Book lists unincorporated Boone County (community 180011) as participating in the National Flood Insurance Program, with flood maps effective January 18, 2012; the county listing covers only unincorporated land.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Boone County permit search and official resources

The Area Plan office issues the county’s permits and keeps the records of the APC, Plat Committee and BZA, including petitions, plats and minutes, so ask that office, in writing or by phone, for copies of a permit, plat or petition. Recorded deeds and plats are searchable through the Recorder’s online records lookup, and parcel data is on the county GIS.

Inspections are where schedules slip.

Get a free quote →

Boone County building permit FAQs

Does the county permit my address in Zionsville or Whitestown?

No. The APC serves only unincorporated Boone County and Advance; Lebanon, Zionsville, Whitestown, Thorntown and Jamestown handle permits inside their limits.

How much is a building permit in Boone County?

A $160 base fee plus each inspection the job needs, and hourly site plan or extra structural review where needed; the office sends an itemized worksheet.

Do I need a permit for a fence?

Only for a fence taller than 6 feet, which costs $50. Fences may not go inside a regulated drain easement.

Can I build a house on farmland outside a subdivision?

Only after a Review of Residential in AG, because a house outside a platted subdivision is a restricted use in the AG district.

Who issues the septic permit?

The Boone County Health Department, which permits and inspects onsite sewage systems; the APC needs that permit, or a sewer and water release, before it issues a building permit.

How do I schedule an inspection?

Call 765-482-3821 at least 24 hours ahead with your permit number, name and the inspection type.

Can I apply for a data center project now?

No. Ordinance 2026-08 halts data center applications from June 16, 2026 until June 15, 2027.

Simplify Boone County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Boone County sooner?

Let Alliance prepare, file, and track your Boone County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Boone County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.