To get a building permit in Crawfordsville, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Crawfordsville’s Planning & Building Services Department at 300 East Pike Street issues improvement location and building permits in the city under the Unified Development Ordinance in force since July 1, 2026.

Authority: Planning & Building ServicesZoning: UDO, July 1, 2026Phone: 765-364-5152
Authority
Planning & Building Services300 E Pike St, Crawfordsville
New house
$150 + $0.10/sq ftAbove-ground living space
Contractors
$25 a yearRegistration for 12 trades
Hours
Mon–Fri 8–4Closed noon to 1 p.m.

In Crawfordsville, permits come from the Department of Planning & Building Services at 300 East Pike Street (765-364-5152), led by Director Megan Huckstep, whose office also serves as Zoning Administrator. Every job starts with an improvement location permit (ILP) under the city’s new Unified Development Ordinance, effective July 1, 2026; the department reviews the plans and calculates the fee, and on septic lots it runs a stormwater review first. A new single-family house costs $150 plus $0.10 a square foot of above-ground living space. Montgomery County’s building code does not apply in the city.

What requires a building permit in Crawfordsville?

Under Section 153.008(P) of the Unified Development Ordinance (UDO), an ILP issued by the Zoning Administrator is needed before construction of any structure begins or any use of land is established. The city’s permit page and fee list name the jobs that are permitted this way.

Residential

  • New single-family, two-family and multi-family homes
  • Room additions and remodels
  • Basements, finished or unfinished
  • Decks and porches
  • Barns, garages and post-frame buildings
  • Portable or prefabricated sheds
  • Pools and fences
  • Driveways and demolition

Commercial and land use

  • Primary buildings, additions, remodels and accessory buildings
  • Changes of occupancy, and any change of use
  • Uses that add parking spaces
  • Permanent and temporary signs
  • Grading and temporary uses

The UDO also offers a Certificate of Compliance for exterior building or site work that does not need an ILP, for a change in use, or as written confirmation that a property meets the ordinance; the Administrator checks a complete request within 5 days.

What Crawfordsville decides and what the state holds

The city sets its own permit and fire prevention fees, registers contractors, inspects rental housing, and runs its zoning, subdivision, floodplain, stormwater and historic preservation rules through the UDO, which replaced the old zoning and subdivision ordinances. Fire protection permits come from the Crawfordsville Fire Department. The state Construction Design Release for Class 1 buildings is filed with the state, separately from the city.

Crawfordsville building department: who handles permitting

The Planning Director and designated staff act as Zoning Administrator, receive applications, issue permits and certificates, and examine premises for compliance. Inspections are done by the City Building Inspector, and the fire department’s Code Enforcement Division reviews and inspects fire protection systems on commercial work.

Short on time to read all of this?

Get a free quote →
Crawfordsville permit contacts
DetailInformation
OfficeDepartment of Planning & Building Services, 300 E Pike St, Crawfordsville, IN 47933
Phone / email765-364-5152; permits@crawfordsville-in.gov (City Hall main line 765-364-5160)
HoursMonday to Friday 8 a.m. to 4 p.m., closed noon to 1 p.m.
DirectorMegan Huckstep, Director of Planning & Building Services
Fire Code Enforcement Division100 South Water St; 765-362-1277; fire protection permits
SepticMontgomery County Health Department
BoardsPlan Commission, Board of Zoning Appeals, Plat Committee, Historic Preservation Commission, Technical Advisory Committee

Elsewhere in the county, permits come from the Montgomery County Building/Zoning Department, whose building code says it does not apply in the city or its contiguous two-mile jurisdictional limit; ask both offices about a parcel just beyond the city line.

Crawfordsville permit types

The department takes online applications for ILPs, grading, signs, temporary uses and contractor registration, and posts PDF forms for demolition, change of occupancy, vacation of public ways and traffic, parking and safety requests.

Residential permits

A new house, addition, remodel, pool, shed, porch, deck or fence needs the application, a complete set of plans (floor plan, typical wall section, truss print and plumbing), a site plan and a subcontractor list. The ILP instructions add an electrical plan, a basement floor plan where there is one, and the location of streams, ponds, easements and rights-of-way on the site plan; some construction needs plans stamped by an architect or engineer. The ILP form also asks for the number of sewer taps, the water meter size and the estimated cost.

Commercial permits

Commercial primary buildings, additions, remodels and accessory buildings are charged on floor area. Plans go through the department and, for fire safety, the fire department, which allows up to 20 business days for review and works with the building inspector to inspect at the same time where possible. Sprinklers, fire alarms and kitchen hood suppression need a fire protection permit from the fire department’s Code Enforcement Division. The Technical Advisory Committee fee is $100.

Grading and demolition

Under Chapter 8 of the UDO it is unlawful to grade, excavate, fill, strip topsoil or remove vegetation without a grading permit, with one permit per site. No grading permit is needed for an excavation of 20 cubic yards or less, a fill of 40 cubic yards or less, basement, footing or pool excavation covered by an ILP or building permit, or digging a driveway or walk to the street, although the grading rules still apply. The demolition application asks for the past use of the property, a demolition plan, where and how waste will be disposed of, start and finish dates and the date the Indiana Department of Environmental Management was contacted; the site must be graded and reseeded afterwards, and the City Building Inspector inspects on completion.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Septic and stormwater. For a house on a septic system, the department performs a stormwater review and faxes it to the Montgomery County Health Department, which issues the septic permit; the building permit follows once the city receives it.
  • Utilities. Sewer, storm and street work must meet the city’s 2025 Sanitary Sewer, Storm and Street Utilities Standards.
  • Zoning relief. Variances, special exceptions, rezonings and appeals go to the Board of Zoning Appeals or Plan Commission first.
  • Subdivision. A lot split needs a primary plat; a subdivision needs primary and secondary plats.

Crawfordsville permit costs and fees

The department’s Building Permit Fees & Pricing page lists the city’s permit and administrative fees, and says whether each is due when you apply or when the permit is approved. Planning staff calculate the fee and contact you once the application is approved.

Residential permit fees
WorkFee
Single-family or two-family dwelling$150 plus $0.10 per sq ft of above-ground living space (due at approval)
Multi-family dwelling$200 plus $100 per additional unit plus $0.10 per sq ft of above-ground living space
Room addition or remodel$100 plus $0.05 per sq ft of above-grade living space
Barn, garage or post-frame building$100 plus $0.05 per sq ft
Basement, finished or unfinished$50
Deck / pool / demolition$50 each (due at approval)
Driveway / fence / portable or prefab shed$50 each (due at application)
Storm water inspection$40
Commercial permit fees
WorkFee
Primary building$300 plus $0.10 per sq ft
Addition or remodel$200 plus $0.10 per sq ft
Accessory building$100 plus $0.05 per sq ft
Change of occupancy$20
Signs / temporary signs$50 plus $0.05 per sq ft / $15

Rather talk it over?

Call 1-855-478-4290 →
Administrative fees
WorkFee
Contractor registration$25 per calendar year
Rezoning, special exception, use variance, development standards variance$100 each, plus legal ad and certified mail
Administrative appeal / vacation of public ways$50 each, plus legal ad and certified mail
Primary plat: subdivision / lot split$300 / $100, plus legal ad and certified mail
Secondary plat (subdivision only)$300, plus legal ad and certified mail
Technical Advisory Committee$100

Worked example at the listed rates: an 1,800-square-foot single-family house is $150 plus 1,800 × $0.10, or $330. The city covers the first engineering review of a development; any further engineering reviews, meetings or correspondence are invoiced to the developer and must be paid before permits are issued.

Fire prevention fees (Ordinance 3-2017, passed February 13, 2017)
WorkFee
Construction or building plan review$0.03 per sq ft, $20 minimum
Automatic sprinkler system$100 per riser
Fire alarm system$100 per zone
Special hazard system (such as hood suppression)$50 per system
Modifying an existing system$50 per item modified
Installing without a fire protection permitStop work order plus $50
Re-inspectionsFirst free; second $75; third and later $150
Acceptance testsInitial test free; each later test $50

Trade permits and who may pull them

Plumbing and electrical plans are part of the building application rather than separate permits on the city’s fee list, and the ILP asks for each contractor’s city registration number. Plumbing contractors must also hold the state plumbing contractor license.

Contractor registration

Before doing work for hire in the city, contractors in these trades must register with the department: carpentry, roofing, electrical, plumbing, concrete, landscaping, masonry, excavation, demolition, siding, HVAC, and fire alarm, fire suppression and commercial hood systems. Registration takes the application form, a certificate of insurance showing its expiration date and a $25 fee paid by cash or check to the City of Crawfordsville; it runs for the calendar year. The contractor must keep a current certificate on file and send a new one after changing insurers. The city’s pages describe no separate permit for homeowners; the registration rule covers work for hire.

Rather not deal with the building department?

Get a free quote →

How to apply for a Crawfordsville building permit

1. Check the UDO

Confirm the zoning district on the city’s zoning map and whether any variance or special exception is needed.

2. Register contractors

Each contractor for hire registers with the department for $25 a year.

3. Prepare plans

Site plan, floor plans, wall section with truss print, plumbing and electrical plans, and the contractor list.

4. Submit the ILP

Apply online or at 300 East Pike Street; the department checks the application and plans against the building requirements.

5. Septic, if needed

The Montgomery County Health Department issues the septic permit after the city sends its stormwater review.

6. Pay and collect

Staff call with the approval and fee; pay and pick up the permit, or have it mailed once paid.

Review, corrections and what causes delay

On a septic lot the building permit cannot be issued until the city has a copy of the county septic permit, so the Health Department’s review sets the pace. Commercial plans that draw a fire department deficiency letter must be resubmitted, and fire review can take up to 20 business days. Developments that need more than one engineering review pay for the extra reviews before permits are released. Applications that were complete before the UDO took effect may ask to be handled under the new ordinance.

Inspections and certificates in Crawfordsville

The owner or applicant schedules inspections directly with the City Building Inspector. After the final inspection, the department issues a certificate of occupancy and mails a copy to both the owner and the applicant; using or occupying the project before then is prohibited.

On commercial work, the fire department adds a pre-drywall rough-in inspection, an above-ceiling inspection before ceiling tiles go in, kitchen hood duct leak and wrap inspections, and acceptance tests for sprinklers, fire alarms and hood suppression, before a building final with every relevant department. The fire department’s building final checklist asks for the installers’ test paperwork for sprinklers, fire pumps, fire alarms and kitchen hood systems, and for exit signs and emergency lights tested by switching off their circuits at the panel. All certificates of occupancy are still issued through the city’s Planning and Building office, and occupying a building without the fire department’s occupancy permit carries a $250-a-day fine.

Rental registration

Under Ordinance 34-2016, owners must register every rental unit with the department each year by January 31, or within 30 days of taking title, for $5 per parcel. Each unit is inspected at least once every five years, with 72 hours’ written notice, and a landlord may ask for an inspection between tenants.

Want this handled start to finish?

Get a free quote →

Indiana building code in Crawfordsville

FEMA’s Community Status Book lists the City of Crawfordsville (community 180171) as participating in the National Flood Insurance Program, with the current flood map dated February 2, 2012. The city’s floodplain management ordinance is incorporated into the UDO.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Crawfordsville building permit FAQs

How much is a building permit for a new house?

$150 plus $0.10 per square foot of above-ground living space; an 1,800-square-foot house is $330.

Do I need a permit for a fence or shed?

Yes. Fences and portable or prefab sheds are $50 each, due when you apply.

Who issues the septic permit?

The Montgomery County Health Department, after the city sends it the stormwater review; the city then issues the building permit.

How do I schedule an inspection?

The owner or applicant calls the City Building Inspector directly.

Which contractors must register?

Anyone working for hire in carpentry, roofing, electrical, plumbing, concrete, landscaping, masonry, excavation, demolition, siding, HVAC or fire protection systems; the fee is $25 a year.

What changed on July 1, 2026?

The Unified Development Ordinance took effect, replacing the city’s old zoning and subdivision ordinances.

Do I need a grading permit to bring in fill?

Yes for more than 40 cubic yards of fill or more than 20 cubic yards of excavation, unless the digging is for a permitted basement, footing, pool, driveway or walk.

Does Montgomery County issue permits in the city?

No. The county’s building code does not apply in Crawfordsville.

Crawfordsville permit search and official resources

The department keeps records of every application, permit, certificate and inspection, as the UDO requires, and copies of documents tied to building work while any part of the structure stands. Ask Planning & Building Services for permit history on a property.

Inspections are where schedules slip.

Get a free quote →

Simplify Crawfordsville permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Crawfordsville sooner?

Let Alliance prepare, file, and track your Crawfordsville permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Crawfordsville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.