Skip to main content
Municipal GuideIndianaFountain County

Fountain County, Indiana Building Permit Guide

To get a building permit in Fountain County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Outside the towns, Fountain County requires an improvement location permit from its Zoning Administrator before building in a residential, business, landfill or industrial district; the county has no building inspector and does no inspections.

Authority: Fountain County Zoning AdministratorWhere: Courthouse, 301 4th St, CovingtonPhone: 704-974-2577
Permit
Improvement locationZoning permit, not an inspection
New home fee
$0Commercial $100, industrial $250
Inspections
None by the countyComplaints are investigated
Farm-zoned land
No permit nowCounty says this may change

In unincorporated Fountain County the permit you need is an improvement location permit from the county’s Zoning Administrator, filed at the courthouse, 301 4th Street, Covington, or by email (704-974-2577). It checks zoning, setbacks, septic and floodplain; the county has no building inspector and carries out no construction inspections. A new house or home addition costs nothing to permit, a new commercial building $100. The eight cities and towns run their own process, and Lake Holiday Hideaway needs both a county and a lake permit.

What requires a permit in Fountain County?

Under the county zoning code, an improvement location permit must be obtained before any structure is built in the Business, Residential, Landfill or Industrial districts, and no permit may be issued unless the structure and its use fully conform to the zoning ordinance (Section 5.01). The application form covers new single-family dwellings, residential additions, new commercial and industrial buildings and additions, agricultural buildings and accessory structures.

Permit needed

  • New houses, additions and accessory buildings in residential, business, landfill and industrial districts
  • Remodeling that changes the use or adds lot coverage
  • Yard improvements on, over or within 10 feet of a septic system or utility easement
  • New construction off municipal sewer also needs a county septic permit

No improvement location permit

  • Routine maintenance, repair or remodeling with no change of use or added lot coverage
  • Essential services
  • Playhouses, drives, fences, concrete patios, decks, play equipment, retaining walls, sidewalks and landscaping, if not near a septic system or utility easement

Agricultural land

The county says land zoned Agriculture does not require a building permit at this time, but that this is subject to change. It still encourages a permit there, because buildings on farm-zoned land must meet state and federal septic and flood requirements, and the zoning code sets a minimum lot size and setbacks in the Agricultural district. A structure or use that breaks state, federal or county rules can lead to a penalty fee or removal.

Changes under review

The Advisory Plan Commission is rewriting the zoning ordinance, and in 2026 the Planning & Zoning page posted proposed text for review. The draft update of Article 5.02 keeps the improvement location permit for the Business, Residential, Landfill and Industrial districts, adds that a required septic permit should be shown to staff before the location permit is issued, and would write into the permit rules that nothing built in the Agricultural District needs a location permit. A draft Article 9, dated October 2026, would allow commercial solar energy systems only by special exception from the BZA in any district, while exempting small systems under 100 kW for a home or small business except for one section. Neither draft is shown as adopted; the current rules above still apply.

Short on time to read all of this?

Get a free quote →

What the county decides and what the state holds

The county decides zoning, lot size and setbacks and issues the location permit; the packet asks for a copy of the improvement blueprints and its total cost, but the county does not inspect. The county’s permit page notes that where the ordinance calls for a building permit it comes from the appropriate county staff, and that nothing in the zoning ordinance cancels the county building rules. Class 1 buildings still need the state design release before construction, whatever the county permits.

Fountain County building department: who handles permitting

The Zoning Administrator issues improvement location permits for the unincorporated county; completed applications are turned in at the Fountain County Courthouse or by email. Zoning policy belongs to the Fountain County Advisory Plan Commission, a nine-member board whose five citizen members must live in the unincorporated county. It makes recommendations to the commissioners on the comprehensive plan and zoning ordinance and approves subdivision plats and planned developments, while the Board of Zoning Appeals hears variances and special exceptions. Both meet at 6:00 p.m. in the Commissioners Meeting Room at the courthouse.

Fountain County zoning and permit office
ItemDetail
OfficeZoning Administrator and Permits, Fountain County Courthouse, 301 4th Street, Covington, IN 47932
Phone704-974-2577 (the number the county’s permit and Planning & Zoning pages print); courthouse main line 765-793-5000, Monday to Friday, 8:00 a.m. to 4:00 p.m.
FormsPermit packet at the courthouse or printed from the county website
Plan Commission and BZACommissioners Meeting Room, courthouse, 6:00 p.m.
911 addressAssessor’s office, courthouse, 765-793-6206

BZA petitions need a legal advertisement in the local paper and notice to every adjacent landowner, and the hearing cannot be held sooner than 10 days after the advertisement; the board’s decisions are final and can be overturned only by a court. Applications can be picked up at the courthouse or printed from the website, and staff tell the petitioner how to pay after the application is submitted. The 2026 BZA dates posted by the county started on January 27, February 17, March 24, April 21 and May 19, at 6:00 p.m.

People in a town follow that town’s ordinances and permit process, and the county lists a contact number for each:

Not sure this scope needs a permit?

Get a free quote →
Towns in Fountain County (Census 2025 estimates)
PlaceWho permits there
Attica (city, 3,290)Attica, for its limits and a 2-mile fringe; 765-762-2467
Covington (city, 2,774)Covington, for its limits and a 2-mile fringe; 765-793-2331
Veedersburg (town, 2,117)Veedersburg, for its limits and a 2-mile fringe; 765-294-2728
Kingman (564), Hillsboro (513), Newtown (228), Mellott (175), Wallace (82)Each town’s own process: Kingman 765-397-3921, Hillsboro 765-798-6880, Newtown 765-610-1971, Mellott 765-918-8298, Wallace 765-585-9726
Lake Holiday HideawayDual permit from the county and Lake Holiday, whose own rules are stricter and can stop an improvement the county approved; 765-397-3450

Because Attica, Covington and Veedersburg reach 2 miles past their limits, check a rural address against those fringes before you apply to the county. The county links Beacon as a tool for drawing the plot plan and finding a parcel.

Fountain County permit types

There is one county permit application, used for every type of project, and the plot plan that goes with it must show the property’s dimensions, every existing and proposed structure, the roads and access points, and the use of each building; no structure may sit on an easement, sewer line, septic system, water facility or well. The fee is set by project type and paid to the Fountain County Treasurer with the application. Only the recorded owner, or the recorded owner’s contractor, may apply; contract buyers, lessees and others without fee simple title may not.

Residential permits

For a new house, addition or accessory building, the application asks for the parcel number, lot and subdivision or section, township and range, the present and proposed use, the zoning district, the front, side and rear setbacks, and the septic permit number. A plot plan must accompany every application, and the floodplain box is signed by the floodplain administrator. New homes and home additions carry no county fee.

Commercial permits

New commercial and industrial buildings and their additions use the same application, with fees of $75 to $250; agricultural buildings are also listed on the form. Commercial wind energy conversion systems are handled under Ordinance 2011-8. Rezoning, variance and special exception applications go to the Plan Commission or BZA; their fees include the legal advertisement and the notices to surrounding owners.

Rather talk it over?

Call 1-855-478-4290 →

What comes before the permit

  • Septic. Any property not connected to a city sewer needs a septic permit from the Fountain County Health Department, now at 981 E. State Street, Suite A, Veedersburg (765-762-3035). Bring a plot plan from the septic installer; home additions also need the department’s review.
  • 911 address. Any improvement that will receive mail needs an address assigned by the Assessor’s office.
  • Driveway. A new drive onto a county road is cleared with the Fountain County Highway Department, 701 S. Mill Street, Veedersburg (765-294-2971); state roads go to INDOT.
  • Floodplain. The county checks the floodplain after the application is turned in; a site in the floodplain must go to the Indiana DNR Division of Water before the permit can be considered.
  • State design release. Class 1 buildings.

Fountain County permit costs and fees

The Plan Commission’s fee sheet is printed in the permit packet on the county website. The fee is paid to the Fountain County Treasurer and accompanies the application.

Fountain County Plan Commission fees for permits, applications and miscellaneous items
ItemFee
New home$0
Home addition$0
New commercial building$100
Commercial addition$75
New industrial building$250
Industrial addition$200
Rezone, variance or special exception$50 each, including legal notice and owner notifications
Zoning ordinance (marked on the sheet as including legal notice)$20
Comprehensive plan$25
Commercial wind energy conversion systemSet by Ordinance 2011-8

The fee sheet is undated, and the county says it is updating its ordinances, so confirm the amount with the Zoning Administrator when you file. A septic permit, a driveway permit and, on Class 1 work, the state design release are charged separately by the offices that issue them.

Trade permits and who may pull them

The county’s pages describe no electrical, plumbing or mechanical permits for unincorporated land, and with no inspector on staff the county does not inspect any trade work. The county’s permit is a zoning permit that checks location, use and setbacks.

Rather not deal with the Fountain County building department?

Get a free quote →
  • Plumbing: Indiana licenses plumbing contractors at state level; the county adds no plumbing permit of its own.
  • Electrical and HVAC: the county’s pages show no local license or registration.
  • Septic: installation is permitted by the Health Department, which also reviews additions to homes on septic.
  • Towns: Attica, Covington and Veedersburg set their own rules inside their limits and fringes; call the town.

How to apply in Fountain County

1. Confirm the jurisdiction

Make sure the site is outside the towns and the Attica, Covington and Veedersburg fringes, and note its zoning district.

2. Get the septic permit

Apply to the Health Department in Veedersburg with the installer’s plot plan if the site has no city sewer.

3. Request a 911 address

Ask the Assessor’s office to assign or check the address.

4. Arrange the driveway

Contact the County Highway Department for a county road, or INDOT for a state road.

5. Complete the permit

Fill in the application with setbacks, district and septic permit number, and draw the plot plan.

6. Turn it in and pay

Deliver it to the courthouse or email it to the Zoning Administrator, with the fee payable to the County Treasurer.

7. Post the permit

Once approved, display it in a front window, on the structure or on a utility post, in a zip-lock bag if outdoors.

Review, corrections and what causes delay

The floodplain check is done after the application is turned in, and a site in the floodplain cannot be considered until the DNR steps are complete. The application asks for the septic permit number and the setbacks, and the plot plan must show its required items clearly and completely, so gaps there hold up the permit. Projects needing a rezoning, variance or special exception wait for a public hearing; the Planning & Zoning page listed no upcoming hearings in November 2026.

Inspections in Fountain County

The county states that it does not have an inspector at this time and will not do any inspections, so no footing, framing or final inspection is scheduled with the county and no county certificate of occupancy follows. What the county does do is investigate complaints about structures already built; if it finds an ordinance violation, the owner may face fees and legal fines for not following local, state or federal law.

The Health Department’s septic process has its own review of the system, and Lake Holiday Hideaway applies its own rules, which can stop an improvement even after the county approves it.

Want this handled start to finish?

Get a free quote →

Indiana building code in Fountain County

FEMA’s Community Status Book lists unincorporated Fountain County (community 180064) as participating in the National Flood Insurance Program, on flood maps dated February 6, 2013 that show no base flood elevations. The county’s permit page reminds applicants that every structure must be checked against the DNR floodplain maps.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Fountain County permit search and official resources

The county has no online permit search; ask the Zoning Administrator at the courthouse for permit records. Plan Commission and BZA agendas, minutes and draft ordinances are posted in the county’s document center and on the Planning & Zoning page, which in 2026 carried drafts including a use table update and a Section 5.02 update.

Inspections are where schedules slip.

Get a free quote →

Fountain County permit FAQs

Do I need a building permit to build a house in Fountain County?

In a residential, business, landfill or industrial district you need an improvement location permit from the Zoning Administrator; for a new home it costs $0.

Do I need a permit on farm-zoned land?

Not at present, according to the county, which says this may change and still encourages a permit; the minimum lot size and setbacks still apply.

Will the county inspect my construction?

No. The county has no inspector and does no inspections, though it investigates complaints about finished structures.

Do I need a permit for a deck or fence?

Not unless it is on, over or within 10 feet of a septic system or utility easement.

I live in Covington, Attica or Veedersburg. Where do I apply?

With the town; each of those three also controls a 2-mile fringe outside its limits.

How much does a commercial permit cost?

$100 for a new commercial building and $75 for a commercial addition, paid to the County Treasurer.

How do I ask for a variance?

File the BZA application at the courthouse or by email; the $50 fee covers the newspaper notice and letters to adjacent owners, and the hearing is at least 10 days after the notice runs.

Where do I get a septic permit?

From the Fountain County Health Department, 981 E. State Street, Suite A, Veedersburg (765-762-3035).

Simplify Fountain County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Fountain County sooner?

Let Alliance prepare, file, and track your Fountain County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Fountain County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.