For unincorporated land beyond Washington’s two-mile zoning area, the Daviess County Building & Compliance Department (812-444-5798) reviews plans, issues permits and inspects construction under the county zoning ordinance revised May 26, 2020. A Request for Zoning Compliance Review, sent to the county Highway Department at 5247 East 100 North, Montgomery, tells the owner which approvals a project needs; an improvement location permit is required for every new house or other primary building and for additions or outbuildings larger than 40% of what already stands on the parcel. The county’s new-home handout puts the improvement location permit fee at $20. The City of Washington handles its own permits within the city and the two miles around it.
What requires a building permit in Daviess County?
The county zoning ordinance, revised May 26, 2020, sets three triggers for an improvement location permit (ILP), the county’s permit for building on unincorporated land. The zoning compliance review is how the county decides whether a project crosses those lines and which other approvals, from setbacks to septic, it needs.
ILP required (Sec. 10.2)
- Every new primary structure, such as a house, business or industrial building
- Additions to a primary building, new accessory buildings or additions to them, when the new area is more than 40% of the combined area of all buildings on the parcel as of January 1 of that year
- Any new structure or addition over 25,000 square feet, whatever the 40% test shows
Other county approvals
- Sign permits from the Advisory Plan Commission
- Floodplain development permits from the Floodplain Administrator
- Septic permits from the Health Department
- Driveway, field entrance, fence, roadside pipe and right-of-way permits from the Highway Department
- A 911 address from the Mapping Division
Starting work, changing a use or placing a sign before the required permit doubles the fee, and paying the double fee does not relieve anyone from complying with the ordinance. A cited violation of the zoning code carries a civil penalty of up to $500, rising to $1,000, $2,500, $5,000 and then $7,500 for repeat violations within 12 months.
What the county decides and what the state holds
The county decides zoning, lot sizes, which projects need an ILP, the fee schedule and county road and septic rules. The building codes themselves are the statewide rules of the Fire Prevention and Building Safety Commission. For a Class 1 structure, used by the public, three or more tenants or anyone’s employees, the state requires a Construction Design Release from the Indiana Department of Homeland Security or a certified local unit before construction, unless 675 IAC 12-6-4 exempts the work.
Short on time to read all of this?
Get a free quote →Daviess County building department: who handles permitting
The Building & Compliance Department handles unincorporated land, working out of the county Highway Department in Montgomery, and its forms run in the name of the Daviess County Advisory Plan Commission. The county’s new-home handout instead sends finished paperwork to a “Plan Director’s Office” at 2200 Memorial Avenue in Washington, (812) 254-8208, the same number as the City of Washington’s Building Commission; call 812-444-5798 first to learn which office takes your file. Find the parcel and its township with the county’s parcel search, and check the zoning map before you apply.
| Place | Who issues building permits |
|---|---|
| Unincorporated townships | Daviess County Building & Compliance Department and Advisory Plan Commission, 812-444-5798 |
| City of Washington and the two miles around it | Washington Building Commission, 2113 Memorial Avenue, (812) 254-8208; see the Washington guide |
| Odon, Elnora, Montgomery, Plainville, Cannelburg and Alfordsville | The published county and town sources do not say whether each town issues its own permits or uses county zoning; ask the town office (Odon 812-636-4321, Elnora 812-692-5415, Montgomery 812-486-3298, Plainville 812-687-7300, Cannelburg 812-486-3672, Alfordsville 812-644-7567, as the county Highway Department lists them) |
Daviess County permit types
The county works from a short set of numbered Advisory Plan Commission forms. Form APC 1, the Request for Zoning Compliance Review, describes the project, its classification (agricultural, residential, commercial or industrial), its size and height and the land area to be disturbed. Staff answer on Form APC 2, the Zoning Compliance Review, ticking each approval the project needs. Form APC 7 is the ILP application, and Form APC 8 is the site plan checklist.
Residential permits
- New homes. The county’s new-home handout lists the order: a 911 address from the Mapping Division (812-254-8644), a county driveway permit (or an INDOT permit on a state highway), a septic permit or written proof of public sewer service, then the zoning compliance review and the ILP. A home needs at least 1.5 acres in the A-1 district or a 10,000-square-foot lot in R-1; parcels platted before January 1, 2014 keep their existing size.
- Agricultural notice. Anyone getting an ILP for a home in an agricultural zone, or in an R-1, R-2, B-1 or B-2 district near the agricultural district, signs a notice acknowledging nearby farm operations and Indiana’s right-to-farm law.
- Additions and outbuildings. Only those over the 40% threshold, or over 25,000 square feet, need an ILP.
- Fences near roads. A new fence that affects county right-of-way needs the Highway Department’s Property Improvement Permit.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial ILP applications list parking spaces, maximum lot coverage, and every primary and accessory structure with its size, height and use, plus a site plan meeting the APC 8 checklist. A food business or bed and breakfast also needs a food establishment plan review from the Health Department, and a Class 1 building needs the state design release. Any building or addition over 25,000 square feet needs an ILP regardless of what is already on the site.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. If the use is not permitted, the review sends you to the Board of Zoning Appeals for a special use permit or to the Advisory Plan Commission for a rezoning; setback or other standard problems need a variance of development standards from the BZA.
- Erosion and stormwater. Every project must use erosion controls under 327 IAC 15-5; when an acre or more will be disturbed, a stormwater pollution prevention plan goes to the Daviess County Soil and Water Conservation District for approval.
- Floodplain. Building in the floodplain district needs a floodplain development permit from the Floodplain Administrator under the county’s Floodplain Management Ordinance.
- Septic. The Health Department must issue the septic permit before construction starts.
- Roads. County driveways and right-of-way work go to the Highway Department; work on a state highway goes to INDOT’s Vincennes District (812-895-7309).
- Subdivisions and new roads. Plats and new public roads go to the Advisory Plan Commission under the county subdivision standards.
Daviess County permit costs and fees
Under Section 14.1 of the zoning ordinance, the Advisory Plan Commission adopts its own fee schedule for permits, rezonings, special uses, variances, subdivisions and appeals, and posts it in the commission’s office rather than in the ordinance. The amounts the county publishes are below; ask 812-444-5798 for the rest of the schedule.
| Item | Fee |
|---|---|
| Improvement location permit, new home (new-home handout) | $20, check payable to the Daviess County Treasurer |
| Other ILPs, signs, rezonings, variances, special uses, plats | Advisory Plan Commission fee schedule, posted in its office |
| Work started before a required permit (Sec. 14.2.1) | Fee doubled |
| Zoning violation after a citation (Sec. 14.2.2) | Up to $500 first; $1,000 second; $2,500 third; $5,000 fourth; $7,500 each further violation within 12 months |
| Septic permit | Non-refundable application fee paid when applying to the Health Department |
| Driveway / right-of-way work | Highway Department Property Improvement Permit; drive and roadside pipes sized by the County Engineer or Supervisor |
Rather talk it over?
Call 1-855-478-4290 →The double-fee rule applies to construction, remodeling, a new sign, a change of use or anything else needing a permit, rezoning, variance or special use. A septic system adds the cost of a certified soil scientist’s soils evaluation and a certified installer, and an INDOT or county driveway may require a drive pipe of the size the county or state sets; 16-gauge corrugated metal pipe is not allowed on county roads. Class 1 buildings also pay the state design release fee.
Trade permits and who may pull them
The county’s published forms are zoning and ILP forms; none of them is a separate electrical, plumbing or mechanical permit, and the county pages describe no local contractor license or registration. Ask the Building & Compliance officer which inspections your ILP carries and whether any trade work needs its own sign-off.
- Plumbing. Plumbing contractors and journeyman plumbers are licensed by the Indiana Plumbing Commission.
- Septic installers. The Health Department requires a certified installer and keeps a list of installers, inspectors, pumpers and soil scientists.
- Utility lines. Utility work placed in county right-of-way needs the Highway Department’s right-of-way request, which can be filed online.
- Owners. The ILP application asks for the applicant, any design consultant and the owner; an applicant who is not the owner must attach Form APC 4, the owner’s affidavit and consent.
How to apply for a Daviess County building permit
Use the parcel search and zoning map; land inside Washington or within two miles of it goes to the city.
Request a 911 address from the Mapping Division if the lot has none.
Get the county driveway permit (or INDOT’s) and the Health Department septic permit, or proof of sewer service.
Send Form APC 1 to the Building & Compliance office at the Highway Department, 5247 East 100 North, Montgomery, or by email to the office.
Variance, special use, rezoning, floodplain, sign or stormwater approvals come next, as ticked on Form APC 2.
Submit Form APC 7 with the site plan, deed record and the approvals, sign the agricultural notice and pay the fee.
Start within 24 months and finish 30% of the plan within the time the ordinance sets.
Rather not deal with the Daviess County building department?
Get a free quote →Review, corrections and what causes delay
Most delays come from the steps outside the office: soils evaluations for a septic permit, driveway pipe sizing, and zoning cases that wait for the monthly board meetings. Under Section 10.2(g), a permit holder who does not start within 24 months, or who has not completed 30% of the development within three years of issuance or one year after starting, whichever is later, can be called before the Board of Zoning Appeals. For one- and two-family homes, state law since January 1, 2026 gives a local unit three business days to confirm an application is complete and seven to review plans.
Inspections and certificates in Daviess County
The Building & Compliance Department schedules its own inspections; call 812-444-5798 and ask which visits your permit needs. Other offices inspect their own pieces: the Health Department makes the final inspection of a new septic system, the Highway Department inspects and approves driveway entrances, pipes and other right-of-way work, and the Soil and Water Conservation District approves stormwater plans on sites of an acre or more. The Health Department’s environmental health staff work Monday to Friday, 8:30 a.m. to 4:30 p.m., but are often in the field, so phone 812-254-8666 before visiting. On Class 1 buildings, the state design release and released plans must be kept on site.
Indiana building code in Daviess County
The county applies the statewide codes through its Building & Compliance Department and keeps its own rules in the zoning ordinance, subdivision standards, floodplain ordinance and Septic Ordinance 2023-3. FEMA’s Community Status Book lists unincorporated Daviess County (community 180433) as participating in the National Flood Insurance Program in the emergency phase, entered September 29, 2008, with a flood hazard boundary map dated May 5, 1978; Washington and the towns have their own entries.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Daviess County permit search and official resources
To look up a past ILP, zoning decision or site plan, ask the Building & Compliance Department; under the zoning ordinance, filed site plans become a permanent county record. The parcel search gives owner, township and parcel number, BZA meetings are streamed on the county’s YouTube channel, and both boards post agendas before meetings and minutes once approved in the county’s Agenda Center.
Want this handled start to finish?
Get a free quote →- Building & Compliance Department
- Request for Zoning Compliance Review (Form APC 1)
- Zoning Compliance Review checklist (Form APC 2)
- Application for Improvement Location Permit (Form APC 7)
- Permit process for new home construction
- Daviess County Zoning Ordinance (revised May 26, 2020)
- Daviess County zoning map
- Floodplain Management Ordinance
- Advisory Plan Commission
- Board of Zoning Appeals
- Highway Department permits, policies and standards
- Property Improvement Permit (driveways, fences, signs)
- Online request to use county right-of-way
- Septic system information and applications
- Surveyor’s Office
- Daviess County parcel search
- City of Washington permits and zoning
- IDHS building plan review and design releases
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Daviess County building permit FAQs
Do I need a permit to build a house in rural Daviess County?
Yes. Every new primary structure needs an improvement location permit, after a zoning compliance review, a 911 address, a driveway permit and a septic permit or proof of sewer.
How much is the permit for a new home?
The county’s new-home handout lists $20, paid by check to the Daviess County Treasurer; other fees are on the Advisory Plan Commission’s schedule.
Does a shed or garage addition need a permit?
Only when the new area is more than 40% of all existing buildings on the parcel as of January 1, or over 25,000 square feet; the zoning compliance review tells you.
How big must a lot be for a new house?
At least 1.5 acres in A-1 or 10,000 square feet in R-1, unless the parcel was platted before January 1, 2014.
Who issues septic permits?
The Daviess County Health Department, 300 East Hefron Street, Suite 150 (812-254-8666), before construction; a certified soil scientist and installer are required.
Does the county issue permits in Washington?
No. The Washington Building Commission handles the city and the two miles around it.
When do the zoning boards meet?
The Advisory Plan Commission meets the second Thursday and the BZA the third Thursday of each month at 6 p.m., at the County Government Center, 300 East Hefron Street.
Simplify Daviess County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Daviess County sooner?
Let Alliance prepare, file, and track your Daviess County permits while your crew stays on the job.
More Indiana permitting guides
Washington
Read guide →Knox County
Read guide →Pike County
Read guide →Dearborn County Building Permit Guide
Read guide →Decatur County Building Permit Guide
Read guide →DeKalb County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Daviess County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.