Dearborn County issues building permits through its Building Department, led by Building Commissioner Bill Shelton at the Government Center, 165 Mary Street, Lawrenceburg ((812) 537-8822, Monday to Friday 8:30 a.m. to 4:30 p.m.), with an online application. On unincorporated land the Planning & Zoning Department ((812) 537-8821) first issues the improvement location permit, $55 for a house under the fee schedule effective January 4, 2022, and it will not release that permit until the health and driveway permits are in. Aurora, Greendale and Lawrenceburg run their own zoning. A moratorium on solar, battery storage and data center projects is in place while the county rewrites its solar rules.
What requires a building permit in Dearborn County?
The county’s 2024 permit application sheet lays out five checkpoints, each run by a different department in the Government Center. Which ones apply depends on the work, and the sheet tells applicants to present it to each department to copy.
The five county checkpoints
- Health Department: on-site sewage systems and sewer connections
- MS4 Department: stormwater quality plans
- Transportation & Engineering: driveways and road improvements
- Planning & Zoning: the use, location and height of improvements
- Building Department: building, remodeling, electrical and plumbing work
Improvement location permits
- Major ILP: a new house or manufactured home, with attached structures
- Minor ILP: additions, pole barns, garages, sheds, swimming pools, ponds, decks, carports, shelters and temporary structures
- Home occupation permits
- Sign permits, temporary, permanent or electronic message
The ILP instructions say a health permit, a driveway permit and a building permit may also be required depending on the request, and Planning & Zoning will not release the ILP until the health and driveway permits are issued. Work started before a permit doubles the zoning fee as a post-construction permit.
What the county decides and what the state holds
The county sets its zoning ordinance, subdivision rules, fees and permit steps, and its Building Commissioner enforces the state building codes and issues certificates of occupancy. Those codes are the Fire Prevention and Building Safety Commission’s, and the county building application carries a line for the state’s fire and building safety approval. A Class 1 structure needs a Construction Design Release from the Indiana Department of Homeland Security before construction unless 675 IAC 12-6-4 exempts the work. Planning & Zoning is also running the 2025 Comprehensive Plan Update, with a public survey and a community event.
Dearborn County building department: who handles permitting
The Building Department issues building permits and certificates of occupancy, and Planning & Zoning handles improvement location permits, the Plan Commission and the Board of Zoning Appeals for unincorporated land. The three cities run their own zoning offices; the county’s pages do not list which cities or towns its Building Department inspects for, so a city or town address should be checked with both the municipality and (812) 537-8822.
Short on time to read all of this?
Get a free quote →| Place | Zoning / improvement location permit |
|---|---|
| Unincorporated county | Dearborn County Planning & Zoning, 165 Mary Street, Lawrenceburg, (812) 537-8821 |
| Lawrenceburg | City Zoning Department, 230 Walnut Street, (812) 532-3561; pre-application meeting and online zoning permit portal |
| Greendale | City of Greendale online improvement location permit and sign permit forms; zoning map effective January 2022 |
| Aurora | City of Aurora ILP, BZA, site plan and floodplain applications; Administration Building, 235 Main Street, 812-926-1777 |
| Dillsboro, Moores Hill, St. Leon, West Harrison | The published county sources do not say; ask the town hall |
Building Commissioner Bill Shelton heads the Building Department, which shares the Government Center at 165 Mary Street with Planning & Zoning, the Surveyor and Environmental Health. Inspection record forms and rough-in and final inspection checklists are posted on its page.
Dearborn County permit types
Building permits are applied for online through the county’s permit portal or on the paper Building Permit Application, which asks for the owner, the general contractor, the architect or engineer and their license number, the plumber and license number, the electrician, the HVAC and foundation contractors, the lender and the value of the work. County staff then record the construction type, total square footage, dwelling units and occupancy.
Residential permits
- New houses and manufactured homes. A major ILP with a major plot plan, which shows utility work such as sewer, water, storm drainage and septic sites, plus a building permit; bedroom windows must meet code.
- Additions, garages, pole barns, decks and pools. A minor ILP with a minor plot plan, and a building permit where construction is involved.
- Septic. The application asks for the number of bedrooms with a floor plan, and every application needs an on-site review by the Environmental Health Specialist.
- Home businesses. A home occupation permit from Planning & Zoning.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial, institutional and industrial projects use the county’s long-form site plan review application, go through the Technical Review Committee before any Plan Commission hearing, and pay for major or minor site plan review and any grading plan. A Class 1 building also needs the state design release before construction. Signs need sign permits priced by area.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Health. Septic systems and sewer connections go to the Health Department’s environmental health office, (812) 537-8841; the county posts a septic installer list and a soil scientist list.
- Stormwater. Stormwater quality plans go to the MS4 coordinator, (812) 532-2033, who also takes MS4 permits online.
- Driveways. Transportation & Engineering, (812) 537-8740; the permit center lists its online driveway portal as temporarily offline.
- Zoning. The ILP with its plot plan; with the zoning portal listed as offline, the office asks applicants to call (812) 537-8821.
- Roads and drains. The county Highway Department, 10255 Randall Avenue, Aurora ((812) 655-9394), maintains more than 500 miles of county roads and 102 bridges, and the Surveyor’s Office ((812) 532-3216) carries out stormwater investigations under the state drainage code, IC 36-9-27.
- Variances. The BZA hears variances, use variances, conditional uses and appeals at 6:00 p.m. in the Henry Dearborn Room of the Government Center.
Dearborn County permit costs and fees
Zoning and planning fees come from the Plan Commission fee schedule effective January 4, 2022; the Planning Director settles disputes about which fee applies. The building permit application has a line for the permit fee, but the county’s posted documents do not list building permit rates; call (812) 537-8822 for an amount.
| Item | Fee |
|---|---|
| Improvement location permit, major (house, incl. attached structures) | $55 |
| Improvement location permit, minor (additions, garages, pole barns, sheds, pools, ponds, decks) | $35 |
| Home occupation | $55 |
| Permit after construction has started | Double the applicable fee |
| Signs: temporary / permanent / electronic message | $25 / $40 / $75, each plus $1 per sq ft |
| BZA: variance; variance of use or conditional use; appeal | $300; $400; $300, each plus hard costs |
| Zone map amendment | $500 + $5 per acre + hard costs |
| Technical Review Committee submittal | $150 |
| Site plan review: major / minor | $500 / $125 |
| Grading plan only | $20 per disturbed acre up to 10 acres; $10 per acre above |
| Preliminary plat; secondary plat | $150 + $25 per lot; $150 |
| Hard costs: legal advertisement; notice signs; inspection per site visit | $35; $15; $50 |
| Septic permit application sheet | $25 fee noted on the 2024 form |
Rather talk it over?
Call 1-855-478-4290 →For a typical new house on unincorporated land, the zoning part of the bill is the $55 major ILP; the building permit, septic and driveway charges are added by their departments. Building without the ILP turns the $55 into $110. The county also posts an older Plan Commission schedule from October 30, 2017, labelled for Aurora, with lower amounts; the January 2022 schedule is the current county one.
Trade permits and who may pull them
Electrical and plumbing work is approved by the Building Department as part of checkpoint 5, and the building permit application names the plumber and electrician, with a license number for the plumber. Plumbing contractors in Indiana are licensed by the state Plumbing Commission. The county pages do not describe a separate county license or registration for electricians, HVAC or general contractors, so ask the Building Department whether your contractor needs anything on file before the permit issues.
- Septic installers. The Health Department publishes a septic installer contractor list for on-site systems.
- Design professionals. The application records the architect or engineer and license number where one is used.
- Owners. The application has an owner line and a contractor line and is signed by the contractor, agent or owner, so an owner can apply for work on their own property.
How to apply for a Dearborn County building permit
Check that it is unincorporated; Lawrenceburg, Greendale and Aurora handle their own zoning.
Fill in the county permit application sheet and take it to each department to copy.
Apply for the septic permit or sewer release and schedule the on-site review; send stormwater plans to MS4.
Get Transportation & Engineering’s driveway approval.
Submit the ILP form, plot plan and fee to Planning & Zoning; it is released once health and driveway permits are in.
Apply online or on paper to the Building Department, listing every contractor.
Book each inspection a day ahead and get the certificate of occupancy before moving in.
Rather not deal with the Dearborn County building department?
Get a free quote →Review, corrections and what causes delay
The ILP is held until the health and driveway permits are issued, so start the health and driveway applications first. A certified survey sent back as incomplete costs $35 for each updated submittal, and a major revision to a Plan Commission application is charged half the original fee. The county’s permit center page says the online zoning and driveway portals were taken offline for upgrades, so call those offices before filing. State law since January 1, 2026 gives local units three business days to confirm a one- or two-family application is complete and seven to finish plan review.
Inspections and certificates in Dearborn County
Inspection requests go to the Building Department at (812) 537-8822, in person or by phone, with at least 24 hours’ notice; a request received after 9 a.m. is inspected the next working day. The department posts an inspection record form and checklists for the rough-in and final inspections. A building may not be used or occupied until the Building Commissioner issues a certificate of occupancy, and a permit becomes void if the work it covers is not finished within two years of issue. Planning & Zoning charges $50 a site visit for inspections tied to BZA and Plan Commission approvals, and the Environmental Health Specialist inspects septic sites.
Indiana building code in Dearborn County
The county Building Commissioner enforces the state codes, and the building department’s resource page links the state’s residential and commercial code amendments and the state plan submittal system. FEMA’s Community Status Book lists unincorporated Dearborn County (community 180038) as participating in the National Flood Insurance Program, with flood maps effective April 16, 2014; that entry covers unincorporated land only, and Aurora takes requests for floodplain analysis.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Dearborn County permit search and official resources
For a past building permit or certificate of occupancy, ask the Building Department; for an ILP, variance or zoning record, ask Planning & Zoning. Plan Commission and BZA agendas are posted on the Planning & Zoning pages, and the Surveyor’s Office keeps section corner records, survey books and historic aerial photos.
Want this handled start to finish?
Get a free quote →- Dearborn County permit center
- Building Department
- Building permit application
- Inspection forms and checklists
- Planning & Zoning Department
- Plan Commission fee schedule (January 4, 2022)
- Improvement location permit packet
- Site plan review application
- 2024 septic permit application and checkpoint sheet
- Solar, BESS and data center moratorium updates
- Plan Commission
- Board of Zoning Appeals
- Dearborn County zoning ordinance
- Dearborn County zoning map
- Environmental Health
- Highway Department
- Surveyor’s Office
- Lawrenceburg Zoning Department
- Greendale permits and forms
- Aurora ordinances, zoning and permits
- IDHS building plan review and design releases
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Dearborn County building permit FAQs
Who issues building permits in Dearborn County?
The county Building Department, 165 Mary Street, Lawrenceburg, (812) 537-8822, with zoning approval first from Planning & Zoning on unincorporated land.
How much is the zoning permit for a new house?
A major improvement location permit is $55 under the January 4, 2022 fee schedule; building, septic and driveway fees are separate.
Do I need a permit for a pole barn or shed?
Yes, a $35 minor improvement location permit, which covers additions, garages, pole barns, sheds, pools, ponds and decks, plus a building permit where required.
Why is my improvement location permit on hold?
Planning & Zoning cannot release it until the health and driveway permits are issued.
How do I schedule an inspection?
Call (812) 537-8822 at least 24 hours ahead; requests after 9 a.m. are handled the next working day.
Can I build a solar farm or data center right now?
The county lists a moratorium on solar, battery storage and data center projects; the Plan Commission may vote on new solar rules on November 23, 2026.
How long is a building permit good for?
The work must be completed within two years of issue, or the permit becomes void.
Simplify Dearborn County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Dearborn County sooner?
Let Alliance prepare, file, and track your Dearborn County permits while your crew stays on the job.
More Indiana permitting guides
Ripley County
Read guide →Franklin County
Read guide →Daviess County
Read guide →Decatur County Building Permit Guide
Read guide →DeKalb County Building Permit Guide
Read guide →Delaware County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Dearborn County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.