Skip to main content
Municipal GuideIndianaBlackford County

Blackford County, Indiana Building Permit Guide

To get a building permit in Blackford County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Blackford County Planning & Zoning, in the courthouse at 110 West Washington Street, Hartford City, issues improvement location, building, roofing and demolition permits, with applications through its online e-permitting portal.

Authority: Blackford County Planning & ZoningFiling: County e-permitting portalPhone: 765-348-3884
Authority
Planning & Zoning110 W. Washington St., Hartford City
Zoning reach
County + 3 townsHartford City, Montpelier, Shamrock Lakes
Inspections
24 hours’ noticeFees paid when you pull the permit
Hours
8–noon, 1–4Monday to Friday

Building permits in Blackford County come from Blackford County Planning & Zoning, 110 West Washington Street, Hartford City (765-348-3884), which serves the Area Plan Commission and the Board of Zoning Appeals. The county zoning ordinance, revised in November 2023, covers all unincorporated land plus Hartford City, Montpelier and Shamrock Lakes, and an improvement location permit is needed before any structure is built, moved, enlarged or structurally altered.

What requires a permit in Blackford County?

The Planning & Zoning office sums up its rule as permits for porches, roofs, decks, sheds, garages, pole barns, homes, signs and more, with no permit for interior remodeling. The zoning ordinance spells out the permits behind that summary.

Permit required

  • Improvement location permit before any structure is built, rebuilt, moved, enlarged or structurally altered, and for a temporary dwelling
  • Occupancy permit before using new or altered structures or vacant land, or changing a use
  • Roofing permit: the office’s FAQ requires one for a roof-over or a tear-off and re-roof, and the ordinance defines replacement as removing and replacing more than 30% of an existing roof (none is needed for new construction)
  • Demolition permit before any main or accessory building is torn down or removed
  • Signs of 4 square feet or more
  • Commercial wind and solar projects

No permit

  • Routine maintenance, repair and remodeling that does not change the use, lot coverage or building size, including interior remodeling
  • Fences, drives, sidewalks, patios, retaining walls, play equipment and landscaping
  • Signs under 4 square feet and public utility essential services
  • Farm structures worth less than $1,000 used only for agricultural production

A fence needs no permit but must still meet the ordinance: the office asks that it sit one foot in from the property line and not block the view from any road or alley. A pre-fabricated shed needs a permit with only its site location, and no plans or inspections.

What the county decides and what the state holds

The Area Plan Commission and the Planning Director set the permit procedures under the zoning ordinance, and the commission adopts the filing fee schedule by resolution, outside the ordinance itself. The Drainage Board and Surveyor run the county stormwater ordinance, the Health Department licenses septic installers, and the Indiana Department of Natural Resources holds primary jurisdiction over construction in a floodway. Commercial (Class 1) buildings also need the state Construction Design Release.

Short on time to read all of this?

Get a free quote →

Blackford County building department: who handles permitting

Planning & Zoning takes building, demolition and commercial wind and solar applications, schedules inspections and takes code violation complaints. Its Area Plan Commission includes members appointed by the county, the Hartford City and Montpelier mayors and councils, the Shamrock Lakes council, the school board and the extension board, with the county surveyor serving by office; the BZA likewise has Hartford City, Montpelier and Shamrock Lakes representatives.

Blackford County permit contacts
OfficeContact
Planning & Zoning (building, demolition, roofing, wind and solar permits)110 West Washington Street, Hartford City, IN 47348; 765-348-3884; Monday to Friday 8 a.m. to noon and 1 to 4 p.m.
County Surveyor and Drainage BoardSame building; 765-348-1203; 8 a.m. to 4 p.m.; Drainage Board 9:30 a.m. on the first Monday of the month
County Highway Department2504 N 200 E, Hartford City; 765-348-0306; 7 a.m. to 3 p.m.
Blackford County Health Department (septic)506 E. Van Cleve St., Hartford City; 765-348-4317

Cities and towns in Blackford County

Blackford County communities and the county zoning ordinance
CommunityWhat the official sources show
Unincorporated countyCounty zoning ordinance; permits from Planning & Zoning
Hartford City (city, 5,898 residents)Inside the county zoning ordinance’s jurisdiction, with its own seats on the Area Plan Commission and BZA
Montpelier (city, 1,489)Inside the county ordinance’s jurisdiction, with commission and BZA seats
Shamrock Lakes (town, 215)Inside the county ordinance’s jurisdiction, with commission and BZA seats
Dunkirk (city; 128 residents in Blackford County)Not listed in the county ordinance’s jurisdiction; ask Planning & Zoning which office serves a Dunkirk address

For an address in Hartford City, Montpelier or Shamrock Lakes, give Planning & Zoning the address when you call 765-348-3884 so the office can confirm the zoning district and the inspections that apply there.

Blackford County permit types

Residential permits

  • Homes, additions and garages: an improvement location permit with a plot plan, followed by an occupancy permit when the work is done.
  • Porches, decks, sheds and pole barns: permitted the same way; a pre-fabricated shed needs only its site location.
  • Roofing: no plans, but the application must give the roofing material and say whether it is a roof-over or a tear-off.
  • Demolition: the application shows the building’s location, description and owner and the contractor; afterward all debris is removed and holes are filled to grade.
  • Temporary dwellings also need an improvement location permit.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial buildings follow the same improvement location and occupancy permit steps, and commercial wind and solar permits are filed through the county portal. A development of one acre or more of disturbed land needs its stormwater plans accepted in writing by the Drainage Board or Surveyor before a building permit is issued, and commercial (Class 1) buildings need the state design release.

What comes before the building permit

  • Zoning approvals. Rezonings and subdivisions go to the Area Plan Commission under the zoning and subdivision control ordinances; variances go to the BZA.
  • Stormwater. Ordinance 2019-05 exempts single-family homes in accepted subdivisions, new buildings or cumulative additions under 500 square feet, land disturbance under one acre and farming; other developments need accepted plans first, and a pre-submittal meeting can be requested.
  • Regulated drains. Outside platted subdivisions, no permanent structure, fences included, may go within 75 feet of the top of bank of a regulated open drain or the center line of a tiled regulated drain unless the Drainage Board accepts it.
  • Septic. Systems are installed only by installers holding the Health Department’s annual septic contractor license.
  • Floodway. Work in a floodway falls under the Indiana DNR’s primary jurisdiction.

Blackford County permit costs and fees

The zoning ordinance says permit filing fees follow a fee schedule adopted by Area Plan Commission resolution, which is not part of the ordinance, and the Planning & Zoning page links no fee schedule. The office tells you at issuance which inspections your project needs, and those inspection charges are paid when you pull the permit. The ordinance lets the commission revise that schedule each year, applies it to improvement location, demolition, roofing and occupancy permits and to zoning petitions, and makes every fee non-refundable. Call Planning & Zoning at 765-348-3884 for the current amounts.

Rather talk it over?

Call 1-855-478-4290 →
Blackford County charges and who sets them
ItemWhat the county publishes
Improvement location, building, roofing and demolition permitsFee schedule adopted by Area Plan Commission resolution; quoted by Planning & Zoning
InspectionsListed for your project at issuance and paid when the permit is pulled
Stormwater plan review and pre-paid inspectionsSet by the County Commissioners on the Drainage Board’s recommendation; the Surveyor sends a written statement, paid by certified check, cashier’s check, money order or card
Annual septic installer license$75; $75 late fee if not renewed in time
Work without a permitFines under the zoning ordinance, and possible removal of work that fails code or ordinance

Trade permits and who may pull them

The county’s pages describe permits by project rather than by trade: a new home or addition is one improvement location permit with the inspections the office assigns, and the inspection list for each build is set when the permit is issued.

  • Plumbing: plumbing contractors hold the state license.
  • Septic installers: every installer working in the county needs the Health Department’s annual $75 septic contractor license before installing a new system or finishing a permitted one, and all septic contractors must be registered with the department.
  • Electrical and HVAC: the county’s Planning & Zoning page lists no county license or registration for these trades; ask the office what it needs on file with your application.

How to apply for a Blackford County permit

1. Check the zoning

Look up the parcel on the county GIS and confirm the zoning district with Planning & Zoning.

2. Clear stormwater and drains

For a larger development, get stormwater plans accepted by the Drainage Board or Surveyor; keep structures 75 feet from regulated drains outside subdivisions.

3. Arrange septic

Use a septic installer licensed by the Blackford County Health Department.

4. Draw the plot plan

Prepare a scaled plot plan of the lot and the proposed work, plus building plans except for roofing and pre-fab sheds.

5. Apply online

File through the county e-permitting portal linked from the Planning & Zoning page, or call 765-348-3884 for help.

6. Pay and schedule

Pay the permit and inspection fees when you pull the permit, then book each inspection at least 24 hours ahead.

Rather not deal with the Blackford County building department?

Get a free quote →

What the plot plan must show

Every permit application needs a scaled plot plan showing the property’s location, size and nature; the location and dimensions of existing and proposed structures; adjoining roads and any existing or new access to them; the existing and proposed use of the land and buildings; and the location and type of sewer, water and drainage facilities. Where the use is not on a community sanitary sewer, the applicant attaches evidence that the county Board of Health has issued a septic permit.

Review, corrections and what causes delay

A missing plot plan, an unresolved zoning question that needs the BZA, or stormwater plans not yet accepted all keep a permit from issuing. Under the stormwater ordinance, a project whose fees are unpaid will not be advanced or accepted. Anyone affected by a decision of the zoning administrator may appeal to the BZA by filing a notice of appeal stating the grounds, and the board may attach conditions when it permits a use. Since January 1, 2026 state law (IC 36-7-2.5) sets local deadlines for one- and two-family permits: 3 business days to confirm an application is complete and 7 business days for plan review.

Inspections and occupancy

When the permit is issued, the office lists the inspections that particular build requires and explains how to schedule them; each must be scheduled at least 24 hours in advance, and the office can be reached at 765-348-3884. Pre-fabricated sheds need no inspections. The county may also inspect stormwater work for compliance with Ordinance 2019-05.

After an improvement location permit, the zoning ordinance requires an occupancy permit, which is not issued until the structure is complete and meets the ordinance; it is also needed before using vacant land or changing a use. Building without a permit can bring fines, and work that misses code or ordinance requirements may have to be torn out. The ordinance sets fines of $10 to $300 per offense plus attorney fees and costs, with each day of a continuing violation a separate offense. A permit expires, with written notice to the owner, if work has not begun within 180 days or is not substantially complete within two years; further work then needs a new permit.

When a home with a septic system built before 1985 is offered for sale, the Health Department requires an inspection of the system by an IOWPA-credentialed or county-licensed installer, who reports the findings to the department in writing under local ordinances 2019-01 and 02-01.

Want this handled start to finish?

Get a free quote →

Indiana building code in Blackford County

FEMA’s Community Status Book lists unincorporated Blackford County (community 180478) as participating in the National Flood Insurance Program, with flood maps effective July 7, 2014; the county listing covers only unincorporated land.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Blackford County permit search and official resources

Permits and code complaints are handled in the county’s iWorQ e-permitting portal; for an older permit or occupancy record, ask Planning & Zoning at 765-348-3884 or at the courthouse. Parcel maps are on the county’s GIS, and septic inspection records are kept by the Health Department.

Inspections are where schedules slip.

Get a free quote →

Blackford County building permit FAQs

Do I need a permit for a fence in Blackford County?

No, but the fence must meet the ordinance: about one foot inside the property line and clear of road and alley sight lines.

Do I need a permit to reroof?

Yes. The office requires a roofing permit for a roof-over or a tear-off and re-roof; you give the material and the method, and no plans are needed.

Is a permit needed for interior remodeling?

No, as long as the work does not change the use, lot coverage or building size.

Can I apply online?

Yes. Building, demolition and commercial wind and solar permits go through the county e-permitting portal linked from the Planning & Zoning page.

How much notice do inspections need?

At least 24 hours; the office tells you at issuance which inspections your project needs.

Is a septic inspection needed when I sell my house?

Yes, if the house has a residential septic system built before 1985; a licensed or IOWPA-credentialed installer inspects it and reports to the Health Department.

How long is a permit good for?

Work must begin within 180 days and be substantially complete within two years, or the permit expires.

Can I build near a county drain?

Outside platted subdivisions, permanent structures and fences must stay 75 feet from a regulated drain unless the Drainage Board agrees.

Simplify Blackford County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Blackford County sooner?

Let Alliance prepare, file, and track your Blackford County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Blackford County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.