In Grant County, the Grant County Area Plan office issues the improvement location permit and the building permit, and its staff inspect the work, in unincorporated areas and in Jonesboro, Fairmount, Matthews, Upland, Van Buren and Sweetser. The cities of Marion and Gas City issue their own permits. You apply at 401 South Adams Street in Marion (765-668-4765), and fees follow Appendix A as amended by Ordinance 15-2025, effective October 20, 2025: a new house is $192 plus 13 cents a square foot, capped at $320.
What requires a building permit in Grant County?
Under the Building Code of Grant County (sections 153.145 to 153.166 of the county code), no construction may take place without a valid building permit from the Area Plan Commission. Area Plan’s checklist says a permit is needed if any item below describes your job.
Permit needed
- Any new principal or accessory building over 120 square feet
- Additions and room additions
- Heating, ventilation or air-conditioning work
- Remodels, alterations and repairs, including any change to a load-bearing wall
- Swimming pools of every kind, above-ground or in-ground
- Decks, and enclosing an existing porch
- Replacing or repairing a roof
- Fences 6 feet tall or taller
No permit
- Accessory buildings of 120 square feet or less (the fee schedule lists “no permit required”)
- Fences under 6 feet, kept clear of utility and road easements and corner sight lines
- Temporary pools that are taken down in the fall
Yard barns and garages over 200 square feet must sit on a permanent foundation or footer, although the Building Inspector may approve other anchoring methods. Most parcels may hold only one single-family or two-family dwelling unless the tract is at least 40 acres. The county’s FAQ says tearing down a building on private property needs no county permit, yet the fee schedule adopted in October 2025 lists demolition permits for principal and accessory buildings over 120 square feet ($96 residential, $122 other), so ask Area Plan before you demolish.
What Grant County decides and what the state holds
The county code adopts the Fire Prevention and Building Safety Commission’s rules by reference, so the technical standards are the state’s. What the county sets is local: zoning under the 1974 Area-wide Zoning Ordinance, setbacks, the permit fee schedule, contractor registration, inspections and the certificate of occupancy. Every structure wired for electrical service must pass a branch-circuit analyzer test before it gets a certificate of occupancy. Area Plan’s FAQ notes that a house converted to a bed and breakfast becomes Class 1, needing the state release.
Grant County building department: who handles permitting
Grant County Area Plan combines the planning department and staff, the 13-member Area Plan Commission and the seven-member Board of Zoning Appeals. The department issues improvement location and building permits, inspects permitted work, enforces the zoning and subdivision ordinances and takes petitions for rezoning, variances and special exceptions. Todd Glancy is the Executive Director.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | 401 South Adams Street, 4th floor, Marion, IN 46953 |
| Phone / fax | 765-668-4765 / 765-651-0892 |
| areaplan@grantcounty.in.gov | |
| Hours | Office 8 a.m. to 4 p.m.; permits 8 a.m. to 3 p.m., Monday to Friday |
| Area served | Unincorporated Grant County and the towns of Jonesboro, Fairmount, Matthews, Upland, Van Buren and Sweetser |
Which office serves your address
| Place | Who issues building permits |
|---|---|
| Unincorporated areas | Grant County Area Plan |
| Jonesboro, Fairmount, Matthews, Upland, Van Buren, Sweetser | Grant County Area Plan; the county also tells owners to check with the town hall |
| Marion | City of Marion: planning issues the improvement location permit and the Building Department the building permit (see the Marion guide) |
| Gas City | The city issues its own permits, according to Area Plan |
| Swayzee | Not on Area Plan’s list; the town has its own Area Planning Board and Zoning Board. Ask the town office, 213 South Washington Street, 765-922-7953 |
| Fowlerton and the Grant County part of Converse | Not on Area Plan’s list, and the published sources do not say; ask Area Plan or the town |
To check a parcel, use the county GIS map on the Area Plan page or call the office.
Grant County permit types
Area Plan issues the improvement location permit (ILP) and the building permit together on one application, with the certificate of occupancy (COO) at the end. There are separate forms for residential work and for commercial, industrial and public buildings, plus sign, tower, home occupation and subdivision forms.
Residential permits
- Residential ILP and COO application: covers single-family and two-family homes (site-built or manufactured), mobile homes, room additions, accessory buildings and their additions, roofs, roofed decks and patios or those over 31 inches high, porches, pools and remodels. It asks for the estimated cost, the county sanitation (septic) permit number, the highway permit number and any town approval.
- Time limits: you have one year to start and one more year to finish; manufactured homes, mobile homes and pools must be finished within six months of issue, or the permit is void.
- Flood areas: if the lot is in a flood district, an elevation certificate is due within six months.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
The commercial, industrial and public buildings application covers new buildings, additions, accessory buildings and parking lots. It asks whether property lines are staked and for the state project release number. You get one year to start and two years to finish. The county code requires a copy of the state design release with the application whenever state rules require one, and the Area Plan forms page carries the CDR application and the CDR exemption form.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: setbacks for most properties are 30 feet in front in agricultural or suburban areas (15 to 25 feet in towns), side yards of 10% of the front yard width (at least 5 feet, no more than 25), and rear yards of 20 feet for a house and 5 feet for accessory buildings.
- Septic: a permit from the Grant County Health Department before you build, repair or replace a system.
- Driveway: the Grant County Highway Department for county roads (765-667-6044) or the state highway office (260-484-9541) for state routes.
- Drainage: the Drainage Board works through the County Surveyor’s Office (765-651-2407), which keeps the regulated county drains.
- Flood: a floodplain development permit from the Floodplain Administrator in a mapped flood area, and an IDNR permit for work in a floodway.
- Class 1 work: the state Construction Design Release before construction.
Grant County permit costs and fees
Area Plan fees are set by Appendix A, the Area Plan fee schedule, first effective July 1, 2018 and amended effective October 20, 2025 by Ordinance 15-2025. The schedule is to be reviewed every five years, with fees rising at the same rate as the county’s assessed valuation. The fee covers the regular inspections.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| New home or relocated home | $192 plus $0.13 per sq ft of floor area, maximum $320 |
| Residential addition | $51 plus $0.13 per sq ft, maximum $192 |
| Residential accessory building over 120 sq ft | $0.13 per sq ft, minimum $32, maximum $320 |
| Residential interior remodel / manufactured home | $96 / $128 |
| Two-family and multi-family dwellings | $192 per unit |
| Pools: above-ground / in-ground | $51 / $83 |
| Roofing: residential / commercial | $32 / $58 |
| Temporary power pole, meter or panel upgrade | $32 |
| Commercial, industrial or agricultural new building | $320 plus $0.13 per sq ft |
| Commercial accessory building or addition | $0.13 per sq ft, minimum $160 |
| Commercial interior remodel | $121 plus $0.13 per sq ft |
| Churches, schools and institutions (new) | $192 plus $0.13 per sq ft |
| Demolition over 120 sq ft: residential / other | $96 / $122 |
| Signs | $0.96 per sq ft per visible face, minimum $58 |
| Re-inspection | $85 residential; $245 other |
| Failure to call for an inspection | $65 each, maximum $250 |
| Starting before the permit is issued | Twice the permit fee |
| Using a structure or pool before the COO | $250 |
| Variance, special exception or rezoning | $128 each |
| Contractor registration | $38 a year |
Worked examples from the schedule: a 24 by 30 foot detached garage at a house is 720 square feet × $0.13, or $93.60. A new 1,800-square-foot house would be $192 plus $234, but the residential new-home fee is capped at $320, and any home over about 985 square feet reaches the cap. Septic, driveway and state design release fees are separate.
Trade permits and who may pull them
Area Plan does not use separate trade permit forms: the residential and commercial applications list the plumbing, electrical, heating and mechanical, foundation and masonry contractors on the building permit itself, and plumbing contractors must give their state plumbing license number. Temporary power poles, meter changes and panel upgrades carry their own $32 fee, and roof and electrical hookup permits can be issued over the phone.
- Contractor registration: anyone who contracts, verbally or in writing, to do construction or demolition in Area Plan’s jurisdiction must register, and subcontractors must register too. Registration runs from January 1 to December 31, costs $38 and cannot be transferred. Employees working under a registered contractor do not register separately.
- Owners: property owners and tenants working on their own property are excluded from registration, as are full-time maintenance employees of the owner.
- Suspension: the BZA, acting as a building commission, may suspend a registration for unpermitted work, missed inspections or similar violations.
- Agents: a contractor pulling a permit must supply the contract or a letter from the owner.
Contractors can register online through Schneider GeoPermits, or in the office or by phone.
Rather not deal with the Grant County building department?
Get a free quote →How to apply for a Grant County building permit
Check that the parcel is unincorporated or in one of the six towns Area Plan serves, not in Marion, Gas City or Swayzee.
Get the septic permit from the Health Department and a driveway permit from the county or state highway office, and note both numbers for the form.
Every contractor and subcontractor must hold a current Grant County registration before the permit is issued.
Use the residential or commercial ILP and COO form with plans drawn to scale and a plot plan showing property lines and setbacks (no plot plan is needed when all work is inside an existing building).
Bring it in before 3 p.m., or drop it off, fax it or email it to areaplan@grantcounty.in.gov; emailed and faxed permits are usually ready the next day.
Pay the Appendix A fee and keep the permit on site, then call for each inspection.
Review, corrections and what causes delay
Simple permits filed at the counter are often issued before you leave, but new homes and commercial buildings take longer because plans are reviewed. A floor plan with window locations and each room’s use labelled is the minimum Area Plan accepts. Missing septic or driveway numbers, an unregistered contractor or a missing design release hold an application up.
Inspections and certificates in Grant County
The owner and the contractor are both responsible for calling Area Plan for every required inspection, and missed inspections can bring violations, fines or a stop-work order. Call 765-668-4765 between 8 a.m. and 4 p.m. with at least 24 hours’ notice; inspections usually take place between 9:30 a.m. and 3:30 p.m. on the next working day, in a morning or afternoon window rather than at a set time.
- Regular inspections are included in the permit fee; a re-inspection costs $85 for residential work and $245 for other work and must be paid before the certificate of occupancy.
- Pools must pass inspection and receive a certificate of occupancy before anyone uses them; an above-ground pool needs a 48-inch barrier, which can be the pool wall with a self-locking ladder.
- The certificate of occupancy is issued after the final inspection shows the work meets state and local codes, and no structure may be occupied before it.
Area Plan’s software sends reminders for inspections not yet called in, and expired permits are generally passed to code enforcement.
Indiana building code in Grant County
The Building Code of Grant County incorporates the commission’s rules, with later amendments as they take effect. The flood damage prevention ordinance posted on the Area Plan page, a model dated May 23, 2024, names the Zoning Administrator as Floodplain Administrator and sets the flood protection grade at the base flood elevation plus two feet. FEMA lists unincorporated Grant County (community 180435) as participating in the National Flood Insurance Program, with maps effective October 30, 2025.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Grant County permit search and official resources
For a past permit, plans or a certificate of occupancy, email areaplan@grantcounty.in.gov or call 765-668-4765 with the address; the Health Department will search its septic permit files by address. The Area Plan Commission and the BZA generally meet on the first Monday of the month in the Annex council chambers, with filing deadlines in the middle of the month before, and missed meetings can be watched on the county’s YouTube page.
- Grant County Area Plan
- Area Plan hours and how to get a permit
- Area Plan FAQs (permits, setbacks, fences, pools)
- Appendix A fee schedule, Ordinance 15-2025
- Area Plan forms (residential, commercial, CDR, contractor)
- Residential ILP and COO application
- Commercial, industrial and public building application
- Grant County Code of Ordinances (Building Code, sections 153.145–153.166)
- Flood damage prevention ordinance (model dated May 23, 2024)
- Schneider GeoPermits for Grant County
- Grant County Health Department septic FAQ
- Septic application and sewage ordinance
- Town of Swayzee planning and zoning boards
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Grant County building permit FAQs
Does Grant County issue permits in Marion?
No. Marion and Gas City issue their own permits; Area Plan covers unincorporated land and Jonesboro, Fairmount, Matthews, Upland, Van Buren and Sweetser.
Do I need a permit for a shed?
Not for 120 square feet or less. Larger sheds need an accessory building permit at 13 cents a square foot (minimum $32), and over 200 square feet a permanent foundation unless the inspector approves another method.
Do I need a permit to replace my roof?
Yes. A residential roofing permit is $32, and roof permits can be issued over the phone with a credit or debit card.
How much is a permit for a new house?
$192 plus 13 cents per square foot of floor area, capped at $320, plus the septic permit if the lot is not sewered.
Does a fence need a permit?
Only a fence 6 feet tall or taller; keep any fence clear of easements and of the sight line at a corner lot.
Do contractors have to register?
Yes, every contractor and subcontractor working under contract in Area Plan’s area, at $38 a year; owners working on their own property do not.
Where do I get a septic permit?
From the Grant County Health Department’s environmental division on the first floor of 401 South Adams Street, after a certified soil scientist completes a soil analysis; new systems are $150.
Simplify Grant County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Grant County sooner?
Let Alliance prepare, file, and track your Grant County permits while your crew stays on the job.
More Indiana permitting guides
Marion
Read guide →Madison County
Read guide →Blackford County
Read guide →Greenfield Building Permit Guide
Read guide →Greensburg Building Permit Guide
Read guide →Greenwood Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Grant County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.