Greenwood, Indiana Building Permit Guide

To get a building permit in Greenwood, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Greenwood’s Building Commissioner, in the Department of Community Development Services at 300 South Madison Avenue, issues the city’s building permits, online through the Cityworks portal or on the city’s application forms.

Authority: Greenwood Building CommissionerFees: Ordinance 25-08Phone: 317-881-8698
Authority
Building CommissionerCommunity Development Services
New house fee
$400 + $0.05/sq ftOrdinance 25-08, March 2025
Plan review
7 business days48 hours expedited for $250
Re-inspection
$75 per repeat visitPolicy from November 1, 2026

In the City of Greenwood, building permits and inspections are handled by the Building Commissioner in the Department of Community Development Services, 300 South Madison Avenue (317-881-8698). You apply through the city’s Cityworks permit portal or on its residential and commercial applications, and the city allows seven business days to review a complete application. Under Ordinance 25-08, passed in March 2025, a new single-family home costs $400 plus $0.05 per square foot, before sewer and park impact fees.

What requires a building permit in Greenwood?

Greenwood publishes a plain “Do I Need a Building Permit?” list for common home projects, and its fee ordinance prices the rest: new homes and commercial buildings, additions, remodels, garages, pools, demolition, mobile homes, signs and tents.

Permit required

  • Decks, pergolas and gazebos bigger than 3 feet by 3 feet, attached or not
  • Every shed or barn, on a permanent foundation or not
  • Roof work that removes 25% or more of the decking
  • Siding work that changes the structure of the building
  • Window replacements that change the opening size
  • HVAC work that adds or alters ductwork; equipment that needs new cable, a larger breaker or a disconnect also needs an electrical permit
  • Commercial HVAC changes that raise airflow by more than 2,000 CFM, and wireless facility changes to footprint or height

No building permit

  • Concrete pads and patios
  • Fences, which must still meet the zoning height limits
  • Like-for-like HVAC replacement, including same-size commercial rooftop units
  • Play houses and tree houses
  • New shingles with patching of unsound decking
  • Same-size window replacement

Under Section 10-03-09 of the Unified Development Ordinance, a fence along the front lot line or between the house and the street it faces may be no more than 4 feet tall, and no fence may exceed 6 feet except in the IM and IL zones. Nothing may be placed in an easement without approval from the Board of Public Works and Safety, and any work in a right-of-way needs an Engineering Division permit.

What Greenwood decides and what the state holds

Greenwood’s plan reviews and inspections follow the codes the State of Indiana has approved, and the residential application lets the applicant say which state electrical and plumbing code the drawings follow. The city sets its own fees, permit lengths, inspection fees and zoning under the Greenwood Municipal Code and its 2020 Unified Development Ordinance. Most commercial and industrial projects need the state Construction Design Release from the Indiana Department of Homeland Security (317-232-6422) before the city permit.

Greenwood building department: who handles permitting

Three divisions share the work. The Building Commissioner issues building, demolition, mobile home, pool and tent permits, inspects permitted work and answers code questions; Kenneth Seal is the Building Commissioner and a certified building official. The Planning Division handles zoning, site development plans, subdivisions, variances, sign permits and the land alteration permits needed before site preparation. The Engineering Division handles right-of-way, street cut and sewer connection permits.

Short on time to read all of this?

Get a free quote →
Greenwood permit contacts
DetailInformation
Building CommissionerDepartment of Community Development Services, 300 South Madison Avenue, Greenwood, IN 46142
Phone and email317-881-8698; building@greenwood.in.gov (Community Development Services main line 317-887-5230)
Online filingCityworks permit portal
Fire marshalsGreenwood Fire Department Fire Marshal, 317-882-2599; White River Township Fire Department, 317-888-8337
StormwaterStormwater Department, 317-887-4711
Food businessesJohnson County Health Department, 317-346-4365

Property in unincorporated Johnson County goes to the county’s Department of Planning and Zoning, which serves land where no city or town has zoning powers, and the city’s online zoning map looks up the zoning for a Greenwood parcel.

Greenwood permit types

The Building Commissioner’s page lists five application forms: a residential building permit, which covers every home project except mobile homes; a commercial building permit; an addition to an existing building; a mobile home permit; and a temporary public-use permit for model homes. The page also offers online filing through the Cityworks portal, and the application asks for attachments in PDF format.

Residential permits

The residential application (revised June 2025) asks for the trades in the scope of work, the cost of the improvement, the water meter size, the foundation type, the energy code path, square footages and whether a homeowners association exists and has been told about the project; the city posts an HOA Affirmation of Notification Form for that. Attach a site plan with easements and setbacks and construction plans, which can be drawn professionally or by hand, covering the floor plan, electrical, plumbing and HVAC layouts, elevations, roof framing, foundation, truss or engineered beam specifications and a typical wall section. The city publishes construction guides and sample plans for decks, detached garages, sheds and pools.

Commercial permits

Commercial buildings, additions, accessory buildings and remodels have their own applications and fee lines, with structural, electrical, plumbing and mechanical work each priced on the remodel line. Model homes used temporarily by the public need a separate permit renewed each year, and tents and awnings need a 30-day permit.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning approval. Where one is required, the Planning and Zoning architectural approval (issued as an “LAP”) must be in hand before the file counts as complete; site development plans and variances go to the Plan Commission or Board of Zoning Appeals first.
  • Land alteration. Preparing a site for development needs a Planning Division land alteration permit.
  • Stormwater. Disturbing more than 10,000 square feet but less than 1 acre needs a $100 erosion and sediment control permit; 1 acre or more needs a $450 stormwater management permit.
  • Sewer. The sanitation approval (sewer availability fee or sewer connection permit) is part of a complete application.
  • Floodplain. Greenwood takes part in the National Flood Insurance Program and posts floodplain information through the Planning Division; building in a floodway also needs IDNR approval.

Greenwood permit costs and fees

Building fees come from the Official Fee Schedule in Section 4-66 of the Greenwood Municipal Code, as replaced by Ordinance 25-08, which the Common Council passed on March 17, 2025. Each fee includes a technology fee of $10, $15 or $25, and once an application is filed and paid no part of the fee is refunded.

Greenwood building permit fees (Ordinance 25-08)
WorkFee
New single-family home / two-family home$400 + $0.05 per sq ft / $500 + $0.05 per sq ft
Multifamily$150 per unit + $0.05 per sq ft per building + $100 per acre
Addition to a one- or two-family home$225 + $0.05 per sq ft
Home remodel: structural, electrical, plumbing or mechanical$75 each; $225 maximum for any combination
Detached garage or carport / accessory structure$0.10 per sq ft, $150 minimum / $0.10 per sq ft, $50 minimum
Residential pool, in-ground or above ground$150
Commercial new building$750 + $0.05 per sq ft per building + $50 per acre
Commercial addition under 10,000 sq ft$750 + $0.05 per sq ft
Commercial remodel, per trade$500 + $0.05 per sq ft; $750 + $0.05 per sq ft maximum
Commercial accessory building$150 + $0.05 per sq ft, $200 minimum
Demolition: first building / each additional / interior only$75 / $25 / $75
Re-inspection / temporary certificate of occupancy$75 / $100
Expedited review / permit extension (1 year)$250 / half the original base fee
Starting work without a permit2 times the permit base fee
Occupying without a certificate of occupancy$500 residential; $1,000 non-residential

Rather talk it over?

Call 1-855-478-4290 →

The Planning Division’s sheet of building-permit related fees, all due before the permit issues, adds a sewer connection permit of $835 and a sewer availability fee of $2,073 for a 3/4- or 5/8-inch meter, and park impact fees of $2,748 for a single-family home, $1,305.50 per unit for a two-family home and $1,786 to $2,748 per apartment by bedroom count.

Worked example from these schedules: a single-family home measured at 2,500 square feet pays $400 + (2,500 × $0.05) = $525 for the building permit; with the $835 sewer connection, the $2,073 sewer availability fee and the $2,748 park impact fee, the total is $6,181. The application records living area, garage and other area under roof separately, so confirm which square footage the city bills. The certificate of occupancy itself carries no extra charge.

Trade permits and who may pull them

New homes and additions carry their electrical, plumbing and mechanical work on the one residential permit; the application asks which trades are in scope and, for electrical and plumbing, which state code the drawings follow. On a remodel, Greenwood issues one permit per project and prices it by how many of the four parts (structural, electrical, plumbing, mechanical) are included, at $75 each and $225 at most. Commercial remodels follow the same pattern at $500 plus $0.05 per square foot per trade.

  • Who signs: the application names the applicant, who is responsible for the permit, and the owner and contractor if different. The applicant takes on scheduling inspections, correcting violations and paying any fees or fines tied to the work.
  • Plumbing: plumbing contractors are licensed by the state through the Indiana Plumbing Commission.
  • Demolition by an owner: the city posts an Owner Affidavit for Demolition.
  • Fire protection: commercial fire code questions go to the Greenwood Fire Marshal or, in its district, the White River Township Fire Department.

Rather not deal with the building department?

Get a free quote →

How to apply for a Greenwood building permit

1. Check the address and the project

Confirm the parcel is inside Greenwood on the city zoning map and check the “Do I Need a Permit?” list.

2. Clear planning and site approvals

Get any planning (LAP) approval, variance, site development plan, land alteration or stormwater permit the project needs.

3. Tell the HOA

If the property has an active homeowners association, notify it and note its decision on the application.

4. Prepare the drawings

Assemble the site plan and construction plans as PDFs, using the city’s construction guides for decks, garages, sheds and pools.

5. File in Cityworks

Submit through the Cityworks portal or on the city’s application form, and say whether you will use a third-party plan reviewer or inspector.

6. Pay and start within 45 days

Pay the permit fee when you file and the sewer and park impact fees before the permit issues, then begin work within 45 days or the permit is void.

Review, corrections and what causes delay

The city tells the applicant within three business days whether the file is complete or what is missing, and allows seven business days to review a complete application. With the Building Commissioner’s approval, an expedited application can be processed within 48 hours for $250. An application without the required planning, stormwater or sanitation approvals is not complete and is not reviewed. A permit runs for up to 365 days and can be extended under Section 7-11(b) of the code for half the original base fee.

Inspections and certificates in Greenwood

Request inspections on the city’s fillable Inspection Request form, giving the permit number and the lot and subdivision, address or commercial project name. Inspections run Monday to Friday from 9:00 a.m. to 4:00 p.m.; requested times are not guaranteed, and the office confirms the actual date and time by email during business hours. Exact times are offered only for footings, commercial inspections and visits that need the homeowner present. Cancel by emailing building@greenwood.in.gov.

From November 1, 2026, under a policy issued by the Building Commissioner on October 22, 2026, each repeat inspection costs $75 and each valid violation cited costs $150, and no further inspection is scheduled until the fee is paid; only the Building Commissioner can grant exceptions. A temporary certificate of occupancy costs $100, the final certificate of occupancy carries no extra charge, and occupying a home before it is issued costs $500 ($1,000 for other buildings).

Indiana building code in Greenwood

Greenwood reviews plans and inspects work under the codes the State of Indiana has approved. FEMA’s Community Status Book lists the City of Greenwood (community 180115) as participating in the National Flood Insurance Program, with its current flood map dated January 29, 2021.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Want this handled start to finish?

Get a free quote →

Greenwood permit search and official resources

The Building Commissioner posts a monthly building permit report in the city’s Document Center, with reports for each month of 2026 through October. For copies of permit files or other city records, use the Public Records Request form on the City Clerk’s page; the Clerk is the keeper of the city’s official records.

Inspections are where schedules slip.

Get a free quote →

Greenwood building permit FAQs

Do I need a permit for a fence in Greenwood?

No, but front fences are limited to 4 feet, other fences to 6 feet outside the IM and IL zones, and none may go in an easement without Board of Public Works and Safety approval.

Does a shed need a permit?

Yes. Every shed or barn needs a permit, foundation or not, at $0.10 per square foot with a $50 minimum.

How much is a permit for a new house?

$400 plus $0.05 per square foot, so $525 at 2,500 square feet, before sewer and park impact fees.

Do I need a permit to replace my roof?

Only if 25% or more of the decking is removed; new shingles with patching of unsound decking need no permit.

How long does plan review take?

Seven business days for a complete application, or 48 hours for $250 with the Building Commissioner’s approval.

What does a failed inspection cost?

From November 1, 2026, $75 for each repeat inspection and $150 for each valid violation, paid before the next inspection is scheduled.

How long is a permit good for?

Work must begin within 45 days of issuance, and the permit lasts up to 365 days; a one-year extension costs half the original base fee.

Simplify Greenwood permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Greenwood sooner?

Let Alliance prepare, file, and track your Greenwood permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Greenwood permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.