Building permits in Bartholomew County, including the City of Columbus but not the Towns of Edinburgh and Hope, come from the Bartholomew County Department of Technical Code Enforcement, 440 Third Street, Suite 302, Columbus (812-379-1535), led by Chief Code Enforcement Officer Michelle Cox. Both the county and city building codes require a permit for any construction, alteration or repair costing more than $300, and a zoning compliance certificate from the City of Columbus–Bartholomew County Planning Department comes first.
What requires a building permit in Bartholomew County?
The “Building Code of Bartholomew County” and the “Building Code of the City of Columbus” use the same rule: a permit is needed before construction, alteration or repair of any building or structure that costs more than $300, on the department’s forms. The department lists the improvements that usually trip that rule.
Permit usually required
- New homes and commercial buildings, modular and mobile homes
- Sheds, storage buildings and attached or detached garages
- In-ground and above-ground pools
- Room additions, sunrooms, decks, porches and carports
- Electrical service upgrades and kitchen or bath remodels
- Roofing, siding and window replacement
- Storage tanks, demolition, house moving and permanent or temporary signs
Surveyor-certified site plan (lots under 2 acres)
- New homes
- New accessory buildings larger than 200 square feet
- In-ground pools
- Above-ground pools
Because the trigger is cost, even a small re-roof or window job can need a permit; the department asks owners to call 812-379-1535 for the items a particular project needs.
What the county decides and what the state holds
The county and the city each adopted a building code that sets the $300 permit rule, and the Board of Commissioners sets the permit fees by ordinance. The county licenses master electricians, and its department inspects businesses, schools and public buildings outside Columbus for fire safety and handles nuisance and zoning complaints outside the city. The state supplies the construction codes, and commercial work needs the state design release before the local permit.
Bartholomew County building department: who handles permitting
Two offices work as a pair. The Department of Technical Code Enforcement issues permits for commercial and residential construction, remodeling and pools, reviews plans, assigns addresses and inspects. The City of Columbus–Bartholomew County Planning Department handles zoning, subdivisions and development review for Columbus and the county, and also runs zoning for the Edinburgh/Bartholomew/Columbus Joint District Plan Commission; it calls itself a companion agency to the code enforcement department.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Department of Technical Code Enforcement (permits, plan review, inspections) | 440 Third Street, Suite 302, Columbus, IN 47201; 812-379-1535; fax 812-379-1765; Monday to Friday 8 a.m. to 4 p.m. |
| Columbus–Bartholomew County Planning Department (zoning compliance) | 123 Washington St., Columbus; 812-376-2550; planning@columbus.in.gov; 8 a.m. to 5 p.m. |
| Environmental Health (septic) | 440 Third Street, Suite 303; 812-379-1550 |
| Highway Department (county road driveways) | 10150 E. 25th Street; 812-379-1660; 7 a.m. to 3:30 p.m. |
| County Surveyor (regulated drains) | 440 Third Street, Suite 400; 812-379-1525 |
Cities and towns in Bartholomew County
The Planning Department administers three planning jurisdictions, mapped on the Bartholomew County GIS, and takes jurisdiction questions by phone or email.
| Community | Permit office |
|---|---|
| Columbus (city) and unincorporated county | Department of Technical Code Enforcement, after zoning compliance from the joint Planning Department |
| Edinburgh (town) | Town of Edinburgh building permits and inspections by its Building & Zoning Official; zoning through the Joint District Plan Commission |
| Hope (town) | The town’s Building and Zoning Administrator reviews building and site plans against Hope’s zoning before a building permit issues, and the county Department of Technical Code Enforcement does all inspections under contract; town office 812-546-6403 |
| Clifford, Elizabethtown, Hartsville and Jonesville (towns) | Ask the Planning Department (812-376-2550) which office serves the address |
Bartholomew County permit types
Residential permits
The residential building permit packet, updated October 1, 2022, covers houses, additions, remodels, manufactured homes, decks and patios, sheds, pole barns and detached garages, pools, demolition and relocation. On a new house, an addition, a remodel, a manufactured home or an accessory structure, the building permit includes the electrical, plumbing and HVAC permits. Plans should include a floor plan, wall detail, truss detail and material list. Trade-only jobs, roofing or siding only, and electrical reconnects have their own applications.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and multi-family buildings, additions, remodels and accessory structures use the commercial packet, and their fee also includes the electrical, plumbing and HVAC permits. The department’s forms also include fire alarm, fire suppression and exhaust hood sign-offs, a plan authentication affirmation and an energy code compliance certification, and commercial work needs the state Construction Design Release. Foundation-only permits, storage tanks, signs and cell towers are priced separately.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning compliance certificate. Issued by the Columbus–Bartholomew County Planning Department; its Plan Commission and Board of Zoning Appeals hear rezonings and variances.
- Septic release. Environmental Health issues new onsite system permits ($200), repairs ($100) and minor repairs ($50); a site assessment is $200 for one lot and $100 for each additional lot, and installers register for $50.
- Driveway. Before building a house, commercial building or outbuilding on a county road, get Highway Department approval: flag and stake the drive location, then call 812-379-1660 to meet the superintendent with your plat or the Auditor’s plat-book map. Once the location and any pipe size are approved, you either build the drive and have it approved, or post a $300 bond (cashier’s check to the Bartholomew County Treasurer) and build it within 12 months; the Building and Zoning office needs the drive approval before it issues a building permit. State roads need an INDOT permit.
- Drainage. The County Surveyor and Drainage Board maintain regulated drains.
- Flood plain. The code enforcement office answers flood plain coverage questions for a parcel.
Bartholomew County permit costs and fees
The current fees took effect October 1, 2022 under Ordinance 2022-06 of the Board of Commissioners, which raised fees last set in 1999. The fees below are “minimum fees” from the department’s residential and commercial fee sheets.
| Permit | Fee |
|---|---|
| One- and two-family dwelling (includes electrical, plumbing, HVAC) | $200 + $0.10 per sq ft on the fee sheet (see note) |
| Addition or remodeling; manufactured home | $150 + $0.10 per sq ft |
| Accessory structure (pole barn, detached garage) | $100 + $0.10 per sq ft |
| Deck or patio | $75 + $0.07 per sq ft |
| Storage shed under / over 200 sq ft | $30 / $50 + $0.10 per sq ft |
| Swimming pool (2 inspections) | $150 |
| Residential demolition / relocation | $60 / $150 + $0.10 per sq ft |
| Residential trade-only, sprinkler, roofing or siding permit | $60 first inspection, $60 each added |
| Commercial or multi-family building | $400 + $0.10 per sq ft |
| Commercial addition or remodel / accessory structure | $300 + $0.10 per sq ft / $200 + $0.10 per sq ft |
| Commercial trade-only, sprinkler, hood or fire suppression | $75 first inspection, $75 each added |
| Storage tank / foundation / cell tower | $120 / $120 / $150 each |
| Sign | $60 per sign |
| Re-inspection | $50, $100 or $200 (three amounts listed) |
| Permit renewal for one year | Half the original fee |
| Work started before the permit | Fee doubled |
Rather talk it over?
Call 1-855-478-4290 →Note on houses: the signed ordinance prints the one- and two-family rate as $200 plus “$.010” per square foot of gross floor area (including attached garage, carport and basement), while the department’s fee sheet shows $0.10; ask the department which figure it applies. Other rates agree, so they can be worked out: a 400-square-foot addition is $150 + (400 × $0.10) = $190, with the trade permits included.
Trade permits and who may pull them
On new homes, additions, remodels and commercial buildings, the electrical, plumbing and HVAC permits are part of the building permit fee, and each trade turns in its own sign-off sheet. Stand-alone trade work uses the electrical, plumbing and sprinkler, or HVAC application.
- Electricians: Bartholomew County offers only a Master Electrician license, which covers all commercial and residential (Class 1 and Class 2) work. Area departments share a standardized exam with a 75% pass mark, so an electrician licensed elsewhere may not have to retest, though a county license may still be required.
- Who may do the work: the department’s required-documents sheet (revised April 2012) says a Bartholomew County licensed electrician must do all electrical work, though a property owner may do one electrical project a year, and that plumbing must be done by a plumber licensed by the State of Indiana or by the property owner. Every sign-off sheet must be in before the permit issues.
- Owner-occupants: an owner who lives in the home may do the building, mechanical, electrical or plumbing work by signing the owner-occupant sign-off, which says the owner will not employ or pay anyone for that work; if the owner later hires someone, the department must be told and that person files his or her own sign-off.
- Fire protection: sprinkler, fire alarm, suppression and hood work carries separate sign-offs on commercial jobs.
Rather not deal with the Bartholomew County building department?
Get a free quote →How to apply for a Bartholomew County building permit
Get the zoning compliance certificate from the Columbus–Bartholomew County Planning Department, 123 Washington St.
Obtain the septic release from Environmental Health and the county or state driveway permit where they apply.
One set of construction plans (floor plan, wall detail, truss detail, material list) and a site plan, certified by a registered land surveyor on lots under 2 acres for new homes, accessory buildings over 200 square feet and pools.
Use the residential or commercial permit packet, with trade sign-offs or the owner-occupant sign-off.
For commercial work, attach the state Construction Design Release.
Submit the packet at 440 Third Street and pay the fee.
Review, corrections and what causes delay
The department asks applicants to allow 3 to 5 days for permit review when planning a start date, and it does no inspections before the permit is issued. Its required-documents sheet adds that on a lot of 2 acres or more outside a subdivision, the site plan for a new home, larger accessory building or pool need not be surveyor-certified but must be a scaled drawing showing every existing structure, the septic tank and field, and the new work; additions need a scaled, dimensioned plan, and structural work needs foundation, floor, wall and roof plans, with engineered truss prints or rafter spans and species. Subdivisions with an architectural committee need its approval too. A missing zoning certificate, septic release or driveway approval, or an uncertified site plan where certification is required, keeps a permit from issuing. Unpaid fees and fines stop the final inspection from being scheduled. A permit can be renewed for one year at half the original fee.
Inspections in Bartholomew County
Every inspection needs 24 hours’ notice: phone 812-379-1535 by 4:30 p.m. the day before and quote the inspection code. Inspectors have all day to arrive but try to fit special circumstances. For a footing, schedule the day before and then call between 8 and 9 a.m. that morning to set a time.
- Footing (code 104; 108 for a pole barn): before concrete is poured.
- Under-slab (900): before fill is placed, with all mechanicals exposed.
- Basement foundation (110): before backfill, with drain tile, gravel, insulation, damp-proofing, anchor bolts and sill plates in place; a crawl space also needs its sump pit and grading.
- Rough-in (910 for all trades): framing, firestopping, electrical, plumbing, HVAC, a completed roof and any manufactured fireplace, with the electrical service ready for the meter.
- Final (999, with 199, 299, 399 and 499 for building, electrical, plumbing and mechanical finals): do not occupy before it, and pay all fees and fines first.
The department’s forms include a certificate of completion and compliance, and its fee sheets list re-inspection fees of $50, $100 and $200.
Want this handled start to finish?
Get a free quote →Indiana building code in Bartholomew County
The department enforces the state codes under the county and city building codes and posts a table of the Indiana codes in force. FEMA’s Community Status Book lists unincorporated Bartholomew County (community 180006) as participating in the National Flood Insurance Program, with flood maps effective February 23, 2023, and in the Community Rating System at Class 8, a 10% flood insurance discount; the county listing covers only unincorporated land.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Bartholomew County permit search and official resources
The code enforcement department provides public information on zoning, code requirements, flood plain coverage and permit statistics, so ask it at 812-379-1535 for a permit record or flood status. Zoning cases and meeting agendas are posted by the Planning Department, and parcels, jurisdictions and drains are on the county GIS.
- Department of Technical Code Enforcement
- Residential and commercial permit fees (effective October 1, 2022)
- Ordinance 2022-06, permit fees
- Owner-occupant sign-off
- Plumbing and sprinkler permit application
- City of Columbus–Bartholomew County Planning Department
- Environmental Health (septic permits)
- Highway Department driveway permitting
- County Surveyor
- Town of Hope building and zoning
- Town of Edinburgh building permits
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Bartholomew County building permit FAQs
Does Columbus have its own building department?
No separate one: the county Department of Technical Code Enforcement issues building permits and inspects for both Columbus and the county.
When do I need a permit?
For any construction, alteration or repair costing more than $300, including roofing, siding and window replacement.
Can I do my own wiring or plumbing?
An owner-occupant may, by signing the owner-occupant sign-off and doing the work personally; the department’s sheet limits owners to one electrical project a year.
How do I schedule an inspection?
Call 812-379-1535 by 4:30 p.m. the day before and give the inspection code; footings also need a call between 8 and 9 a.m. that day.
How much is a permit for an addition?
$150 plus $0.10 a square foot, with the trade permits included; a 400-square-foot addition is $190.
Who issues septic permits?
Bartholomew County Environmental Health: $200 for a new system and $100 for a repair, after a site assessment.
Does the county license electricians?
Yes, with a Master Electrician license only, based on a shared regional exam with a 75% passing score.
Simplify Bartholomew County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bartholomew County sooner?
Let Alliance prepare, file, and track your Bartholomew County permits while your crew stays on the job.
More Indiana permitting guides
Brown County
Read guide →Jackson County
Read guide →Decatur County
Read guide →Bedford Building Permit Guide
Read guide →Beech Grove Building Permit Guide
Read guide →Blackford County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bartholomew County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.