Inside the City of Goshen, building, electrical, HVAC and plumbing permits come from the Goshen Building Department in the Annex Building, 204 East Jefferson Street, Suite 5 (574-534-1811, weekdays 8:00 a.m. to 4:30 p.m.), where Myron Grise is Building Commissioner. Applications go through the city portal, where staff generally review them within 24 hours, or at the counter, and every new building first needs a zoning clearance signed by Planning & Zoning and Engineering. Permit fees are set by Ordinance 5256, passed June 22, 2026.
What requires a building permit in Goshen?
Under Goshen City Code section 6.1.1.7, a permit is needed before anyone builds, alters, remodels, rehabilitates or adds to a building or structure or places a mobile home, and before new or altered electrical, mechanical or plumbing systems are installed. The department’s page spells out that this includes:
Building permit
- New buildings and additions
- Alterations, remodeling and rehabilitation
- Roof replacement, siding and windows
- Placing a mobile home
Trade permits
- New or altered electrical systems
- New or altered mechanical (HVAC) systems
- New or altered plumbing, including water heaters and water softeners
- Fire suppression, detection and alarm systems, inspected with the Fire Chief
Getting the permit is a joint duty of the owner and the contractor, and both can face the code’s penalties when work goes ahead without one. The code treats as violations building without a required permit, letting someone else build in violation, and ignoring a Building Commissioner’s order within the time it sets; the city may also go to court in Elkhart County for an injunction. When unsure, call the department at 574-534-1811 before starting.
What Goshen decides and what the state holds
The department enforces the Indiana Building Code, the State Energy Code and the Goshen Municipal Code, and the city sets its own fees, licenses electrical and HVAC contractors, runs zoning through its Plan Commission and Board of Zoning Appeals, and registers and inspects every rental home under the Neighborhood Preservation Ordinance. Building permit review includes a check that new construction and substantial improvements are reasonably safe from flooding. Class 1 projects need the state Construction Design Release before the city issues permits, and appeals of department orders go first to the city’s Board of Building Appeals within 15 days, then to the state Fire Prevention and Building Safety Commission. The appeals board has five members qualified in building construction: the Fire Chief, who acts as its secretary, two members named by the Mayor and two by the Common Council.
Short on time to read all of this?
Get a free quote →Goshen building department: who handles permitting
The Building Department, set up in 1973, issues permits, inspects construction and trade work, licenses electrical and mechanical contractors, and handles rental registration and exterior property maintenance. Planning & Zoning is a separate department in Suite 4 of the same building, and Engineering and Stormwater sign off on site work. Since Ordinance 5001, passed by the Common Council on July 2, 2019, every residential property used for rent or lease must be registered with and inspected by the Building Department under the Neighborhood Preservation Ordinance (Ordinance 4860).
| Office | Contact |
|---|---|
| Building Department | Annex Building, 204 E. Jefferson St., Suite 5, Goshen, IN 46528; 574-534-1811; fax 574-533-8626; weekdays 8:00 a.m. to 4:30 p.m. |
| Building Commissioner | Myron Grise (also commercial building inspector) |
| Planning & Zoning | 204 E. Jefferson St., Suite 4; 574-534-3600; weekdays 8:00 a.m. to 5:00 p.m.; Planning & Zoning Administrator Rhonda Yoder |
| Stormwater (final site requirements) | 574-533-8733 |
| Online portal | cityportal.goshencity.com (applications, payment, permit activity) |
| Flood insurance | Participates in the National Flood Insurance Program (community 180058); current map August 2, 2011 |
Goshen is the Elkhart County seat, but the county’s Planning and Development office on Elkhart Road serves the unincorporated county and four towns, not the city (see the Elkhart County guide).
Goshen permit types
The portal lists building permits and trade permits under their own headings; trade permits may require a licensed contractor. The Plan Commission meets on the third Tuesday and the BZA on the fourth Tuesday of each month at 4:00 p.m. in the Council Chambers of the Police and Courts Building, 111 East Jefferson Street.
Residential permits
Every new house is reviewed by Planning & Zoning and by Engineering, and no permit is issued until both have signed the zoning clearance. For a new home the electrical, HVAC and plumbing fees are included in the building permit fee: the trade permits are still issued separately, at no charge, and each subcontractor applies for its own. No electrical, HVAC or plumbing inspection is done until the subcontractor’s permit has been issued. Homeowners may apply for any permits related to their own property.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
All new commercial construction, and some remodels, go through site plan review. Upload a permit request on the portal with construction plans stamped by the architect; site plans are reviewed separately and should not be uploaded with them. Add the zoning clearance signed by Planning & Zoning and Engineering and the state design release where needed. Commercial, industrial, multi-family (three or more units) and public or institutional projects go through the city’s Technical Review, in which Planning, Engineering, Stormwater, Fire and Building review the plans together, after an earlier predevelopment meeting for concept proposals; Technical Review fees are set by Ordinance 5024.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Engineering & Zoning Clearance. One form records the zoning district, setbacks, lot coverage, height, flood zone, whether sewer, water, well or septic serves the lot, and whether sidewalks or landscaping are required. Engineering approves water and sewer, the site plan, stormwater clearance, the post-construction plan and any driveway permit before Zoning signs.
- Variances and rezonings. These go to the BZA and Plan Commission on their monthly schedules.
- Flood zones. The building permit review checks flood safety for new construction and substantial improvements in special flood hazard areas.
- State release for Class 1 buildings.
Goshen permit fees
Building, trade and other permit fees are set by Ordinance 5256, Building Code Fees, which the Common Council passed and the Mayor approved on June 22, 2026. It covers residential, commercial, electrical, mechanical and plumbing permits, other permits and services. Its fees take effect 90 days after publication of the notice of adoption under IC 5-3-1; the city posted that notice on its website on June 23, 2026, so confirm with the department that the new fees are in force on your filing date. The ordinance can be inspected at the Clerk-Treasurer’s Office, 202 South Fifth Street, and the Building Department page links its current fee list; ask the department (574-534-1811) for the amount on your permit, or wait for the portal’s approval e-mail, which carries the payment link. Permits are not considered issued until paid, by cash, check or card.
- New houses: the electrical, HVAC and plumbing fees are included in the building permit fee.
- Inspections: the City Code requires permit and inspection fees to be paid before a permit is issued, and charges re-inspection fees when work is incomplete or not ready.
Rather talk it over?
Call 1-855-478-4290 →| Application | Fee |
|---|---|
| Improvement location permit, primary building | $20 |
| Developmental variance / use variance | $125 / $200 |
| Conditional use permit | $20 |
| Rezoning | $200 |
| Administrative appeal; ordinance amendment; modify a commitment | $125 each |
| PUD preliminary site plan / final site plan | $200 + $5 per acre / $100 |
| Minor subdivision / major subdivision primary / secondary | $200 / $250 + $5 per lot / $150 |
| Plat or public way vacation | $175 |
| Technical meeting | $200 |
| Written zoning, floodplain or nonconforming verification | $40 per property |
Electrical and HVAC contractor licenses carry a late fee when renewed late (see the trade section). Rental registration and rental inspection fees are on a separate sheet.
Trade permits and who may pull them in Goshen
Goshen does not license general contractors or require a bond from them. Trade work is different:
- Electrical and mechanical (HVAC) contractors working in the city must be licensed and registered with the city under Ordinance 5120. The ordinance defines Class A mechanical contractors (heating, ventilating, cooling and refrigeration) and Class B (mobile homes only); neither may make the electrical connection from the equipment to the main service box. Applicants pass an exam approved by the Building Commissioner with a score of 70% or better, or show a license from another locality whose requirements are equal to or greater than Goshen’s, and the Board of Works or its designee approves the license; a refused applicant can appeal to the Board of Works, which holds a hearing within 15 days. A new license covers the rest of the current year plus two more calendar years and expires December 31 of the last year, with a renewal notice each November. The department page sets the late fee after January 31, while the ordinance text waives it if the renewal fee is paid by February 28; ask which date applies.
- Plumbing contractors must hold a current state license.
- Who files: the department’s guidance says homeowners may apply for any permits for their own residential property, property owners may apply for commercial construction permits, and electrical, HVAC and plumbing permits must be applied for by licensed contractors.
- Subcontractors file their own trade permits; the general contractor does not.
- Fire systems: the Fire Chief or a designee helps inspect suppression, detection and alarm systems and reports to the Building Commissioner.
Rather not deal with the building department?
Get a free quote →How to apply for a permit in Goshen
File the Engineering & Zoning Clearance with your site details; Engineering and Planning & Zoning must both sign it.
Book a predevelopment meeting for a concept, then Technical Review; get the state design release for Class 1 work.
Create an account at cityportal.goshencity.com and confirm the verification e-mail (check your spam folder).
Choose the permit and upload documents; commercial plans must carry the architect’s stamp. Counter filing at the Annex Building is also accepted.
The approval e-mail carries a payment link; the permit is issued, and can be printed, only once paid.
Each trade applies for its own permit before its inspections can start.
Review, corrections and what causes delay
Portal applications are generally reviewed within 24 hours when filed between 8:00 a.m. and 5:00 p.m. on weekdays, in the order received; applications sent outside those hours may be delayed. Projects in Technical Review follow its 2026 calendar. A missing signature on the zoning clearance, site plans uploaded with the building plans, unlicensed trades and unpaid invoices are the points the department’s instructions stress. A permit expires one year after it is issued.
Inspections and certificate of occupancy in Goshen
Allow 24 to 48 hours’ lead time when requesting an inspection from the Building Department, and expect inspection reports by e-mail through the portal account. Inspectors may enter a site with credentials between 7:00 a.m. and 6:30 p.m., Monday through Saturday, unless other arrangements are made.
- Trade inspections start only after each subcontractor’s permit is issued.
- Re-inspections of work that is incomplete or not ready are charged under the fee ordinance.
- Certificate of occupancy: required before anyone occupies a new or altered building. It follows a passed final building inspection plus the Planning & Zoning and Stormwater exterior site requirements (landscaping, stormwater and similar items).
- Cold weather: when weather prevents finishing those exterior items, owners may apply for a Completion Agreement under Resolution 2021-29 to occupy first, but the final building inspection must still be passed.
Want this handled start to finish?
Get a free quote →Indiana building code
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Goshen building permit FAQ
Do I need a permit to replace my roof or windows in Goshen?
Yes. The Building Department lists roof replacement, siding and windows among the work that needs a permit.
Do I need a permit for a water heater or water softener?
Yes. New or altered plumbing systems, including water heaters and water softeners, need a permit pulled by a licensed plumbing contractor.
Can a homeowner apply for a permit in Goshen?
Yes, for residential work on their own property, according to the department’s guidance. Electrical, HVAC and plumbing permits are applied for by licensed contractors.
How fast are Goshen permits reviewed?
Portal applications are generally reviewed within 24 hours during weekday business hours, and the permit is issued once paid.
How much does a Goshen building permit cost?
Fees are set by Ordinance 5256 (June 22, 2026), available at the Clerk-Treasurer’s Office; for a new house the trade permit fees are included in the building permit fee. Call 574-534-1811 for a quote.
Does a general contractor need a Goshen license?
No. General contractors are not licensed by the city and need no bond; electrical and HVAC contractors need a city license and plumbers a state license.
How long is a permit good for?
One year from the date of issue under City Code section 6.1.1.8.
Does Elkhart County issue permits in Goshen?
No. The city issues its own; the county office covers unincorporated land and the towns that use it.
Permit search and official resources
Current permit activity is published on the city portal’s dashboard, and applicants track their own permits, approvals and inspection reports in their portal account. For older permits, call the Building Department at 574-534-1811 or ask at the Annex Building counter.
Inspections are where schedules slip.
Get a free quote →- Goshen Building Department
- Goshen city permit portal
- How to apply for permits online
- Who can apply for a permit and how
- Notice of adoption, Ordinance 5256 building code fees
- Ordinance 5120, electrical and mechanical contractor licensing
- Goshen City Code (Title 6, building code administration)
- Goshen Planning & Zoning, Plan Commission and BZA
- Zoning Ordinance fee schedule (August 2023)
- Engineering & Zoning Clearance form
- Development resources and Technical Review
- Final inspection and exterior requirements for a certificate of occupancy
Simplify Goshen permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Goshen sooner?
Let Alliance prepare, file, and track your Goshen permits while your crew stays on the job.
More Indiana permitting guides
Elkhart County
Read guide →Elkhart
Read guide →Kosciusko County
Read guide →Grant County Building Permit Guide
Read guide →Greenfield Building Permit Guide
Read guide →Greensburg Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Goshen permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.