To get a building permit in Jefferson County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Jefferson County’s Planning, Zoning & Building Inspection office, run from the County Surveyor’s office in Madison, issues improvement and building permits outside the zoning areas of Madison and Hanover, by appointment and with cash or check payment.

Authority: Jefferson County Planning, Zoning & Building InspectionZoning: Unified Development Ordinance (2023)Phone: 812-265-8925
Permit office
Surveyor’s Office annex315 Jefferson St, Madison
House fee
$0.15 per sq ftAll covered areas, $75 minimum
Payment
Cash or checkNo debit or credit cards
Not covered
Madison, HanoverAnd their buffer zones

In Jefferson County, improvement and building permits for land under county zoning come from the Planning, Zoning & Building Inspection office, which shares space and staff with the County Surveyor at 315 Jefferson Street, Annex Building, Madison (812-265-8925). The office is working by appointment, takes cash or checks only, and charges $0.15 per square foot of covered area for a house. The City of Madison and the Town of Hanover, and their buffer zones, are outside its jurisdiction.

What requires a building permit in Jefferson County?

The county’s permit rule is in its Unified Development Ordinance (UDO), effective April 6, 2023 and last amended September 18, 2025. The office’s plain-language guide, “Do I need a permit or an approval?”, sums it up.

Building permit needed

  • All primary structures, such as a house
  • Accessory buildings and structures of 200 square feet or more, such as barns and storage sheds
  • Solar and wind energy systems
  • Signs and temporary storage containers
  • Demolition of an existing structure (no fee)
  • Construction, excavation, grading, paving, landscaping or remodeling in a floodplain

No building permit

  • Swimming pools, above-ground or in-ground
  • Fences and retaining walls
  • Pavement such as slabs and walks
  • Swing sets, playhouses, basketball poles, mailboxes and lamp posts
  • Home utility hook-ups such as cable or internet

Exempt items still have to meet the UDO: fences may not sit in easements or create a traffic hazard, must be at least 5 feet from a public road, may go on the property line only with the neighbor’s written approval, and are limited to 6 feet in the R1, R2 and R3 districts. Razor wire, barbed wire and electric fences are allowed only for farm or industrial uses. Repairs and maintenance of existing structures, farming and gardening need no permit even in a floodplain.

What the county decides and what the state holds

The county commissioners enacted the UDO under the state planning law, replacing the 2004 zoning and subdivision ordinances, and the Plan Commission approved the current fee schedule. The county’s inspection sheet states that the Indiana One- and Two-Family Dwelling code applies to houses, and that commercial additions and new structures need a state Construction Design Release before work starts; the permit instructions ask for the release before you even apply. The Plan Commission’s public hearing on the Two-Mile Buffer Zone has been moved from December 2 to December 9, 2026, at 5:30 p.m. at the Jefferson County Fairgrounds.

Jefferson County building department: who handles permitting

The County Surveyor is the Director of the Planning & Zoning Office, which also handles building inspection and floodplain administration; the office and its staff are shared with the Surveyor’s Office. Staff write building permits and approve surveys, the building inspector issues permits, inspects new construction and issues certificates of occupancy, and a zoning enforcement officer investigates written, signed complaints.

Short on time to read all of this?

Get a free quote →
Who handles zoning and permits in Jefferson County
AreaOffice
Land under Jefferson County zoningPlanning, Zoning & Building Inspection, 812-265-8925
City of Madison (pop. 12,304) and the Madison BufferCity of Madison, 812-265-8324
Town of Hanover (3,866) and the Hanover BufferTown of Hanover, 812-866-2131
Brooksburg (71) and Dupont (340)Not named as exceptions on the county’s pages; ask the county office which rules apply
County office details
DetailInformation
AddressSurveyor’s Office, 315 Jefferson Street, Annex Building, Madison, IN 47250
Phone812-265-8925; building inspector 812-274-3929; administrative assistant 812-274-3928
Hours8:00 a.m. to 4:00 p.m., Monday to Friday; currently by appointment
PaymentCash or check to the Jefferson County Plan Commission

The county’s zoning GIS shows every parcel’s classification, including the City of Madison, Madison Buffer, Town of Hanover and Hanover Buffer categories.

Jefferson County permit types

The county issues an “Improvement / Building Permit” for most construction, with separate fee lines for houses, carports, commercial and industrial buildings, agricultural buildings, signs, towers, solar and wind systems and parking lots.

Residential permits

A house permit covers all covered areas, including the garage, porch and basement. Bring or email architectural drawings showing plumbing, electrical and HVAC, a floor layout with room, door and window sizes (noting tempered glass), an elevation plan with eave and peak heights, the estimated cost and use, and a site plan with setbacks. The electrical plan must show a service entry of at least 200 amps, the panel location and a licensed electrical contractor. A manufactured home must meet the HUD code with a red label, be no more than 10 years old when first placed, sit on a permanent foundation, be skirted and face the street. You may live in a manufactured home kept on its wheels on the same lot for a year while building a house, with two possible six-month renewals, if both have permits.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial buildings are priced at $0.15 per square foot with a $250 minimum, industrial at a $500 minimum. The state design release comes first, and parking lots, signs, towers and solar or wind farms have their own fees; the schedule also lists special exception fees for solar and wind projects, communication towers and confined feeding operations.

What comes before the building permit

  • Septic or sewer. A septic permit or approval letter from the Jefferson County Health Department, or a public sewer tap receipt, before the permit; any project with plumbing not on a municipal sewer needs the health department’s sign-off.
  • Owner consent. The owner applies, or gives the builder written consent to apply.
  • Floodplain. Floodplain work needs the county permit, and work in the floodway needs an Indiana DNR permit first.
  • Zoning. Setbacks come from the UDO’s zoning districts; variances and special exceptions go to the Board of Zoning Appeals, which meets at 5:00 p.m. on the first Tuesday of the month, and rezonings and subdivision plats to the Plan Commission.
  • County roads. The Highway Department, 3135 Clifty Drive, Madison (812-273-1708, 7 a.m. to 3 p.m. weekdays), maintains about 540 miles of county roads; state highways and city and town streets are not county roads.

Jefferson County permit costs and fees

The fee schedule was approved by the Plan Commission on June 6, 2023 and is marked “prices subject to change”. Fees are paid in cash or by check to the Jefferson County Plan Commission; the office does not take debit or credit cards.

Jefferson County fee schedule (Plan Commission, June 6, 2023)
PermitFee
Residential (all covered areas: garage, porch, basement)$0.15 per sq ft, $75 minimum
Commercial / industrial$0.15 per sq ft, $250 / $500 minimum
Carport: prefab anchored without foundation / other$50 / $0.15 per sq ft
Agricultural building (farm use only)$50 under 6,000 sq ft; $100 over
Sign / communication tower / tower co-location or work$150 / $2,000 / $500
Residential solar or wind$0.15 per sq ft of footprint
Solar or wind farm$2,000 + $5 per acre over 10 acres
Parking lot$100 + $1 per space after 20
Change of use / certificate of occupancy without a permit$75 / $25
Renewal before expiry / reissue after expiry50% of original / full new fee
Work without a permit / missed inspection$150 / $250 per inspection
Stop-work order violation / illegal use of a structure$250 + $50 a day / $1,500 + $50 a day
Variance / special exception / rezoning$50 / $75 ($1,000+ for solar, wind, towers, CFOs) / $350
Zoning verification letter / duplicate permit card$25 / $25

Rather talk it over?

Call 1-855-478-4290 →

Worked example: a 2,000-square-foot house with a 500-square-foot garage and a 200-square-foot covered porch counts 2,700 square feet of covered area, or 2,700 × $0.15 = $405. A 1,200-square-foot farm machine shed used only for agriculture is $50. Demolition permits are free, and appeals and use classification applications cost nothing. The health department charges $200 for a septic permit when it is issued.

Trade permits and who may pull them

Jefferson County folds electrical, plumbing and HVAC work into the improvement/building permit; the plans for each trade go in with the application and are checked at the rough-in inspection. The permit requirements call for a licensed electrical contractor, a licensed plumbing contractor and a licensed HVAC contractor to be named on the plans. Plumbing contractors hold Indiana licenses; the county pages do not describe a local licensing program for the other trades or a homeowner exemption, so call the building inspector before planning to do the work yourself. A septic system must be designed, laid out and installed by a contractor certified by the Jefferson County Health Department, after a soil evaluation by a certified soil scientist.

How to apply for a Jefferson County building permit

1. Check the zoning map

Use the county’s zoning GIS to confirm the parcel is not in Madison, Hanover or either buffer, and note its district and any floodplain.

2. Get septic or sewer approval

Obtain the health department septic permit (through a certified contractor) or a sewer tap receipt.

3. Get the state release for commercial work

Class 1 commercial buildings need the Construction Design Release before you apply.

4. Prepare drawings and a site sketch

Architectural drawings with plumbing, electrical and HVAC, and a sketch showing setbacks from the road and the side and rear lines.

5. Book an appointment

Call the building inspector (812-274-3929) or the office (812-274-3928), and email the drawings or bring a set.

6. Pay and receive the permit card

Pay by cash or check to the Plan Commission; keep the card for the inspector.

Rather not deal with the Jefferson County building department?

Get a free quote →

Review, corrections and what causes delay

No building permit is issued without the septic permit or sewer tap receipt, and commercial applications wait for the state release. Any change to plans or specifications must be approved by the building inspector, who may issue written on-site changes. Buildings must be started within one year and completed within three. A permit can be renewed before it expires for half the original fee; after it expires, the full fee applies again. State law since January 1, 2026 also sets local deadlines for one- and two-family reviews and inspections.

Inspections and certificates of occupancy

Call the building inspector at 812-274-3929, Monday to Friday, 8 a.m. to 4 p.m., at least 24 hours ahead. The builder should call before pouring footers and whenever the next stage is ready; if the inspector has not come within 48 hours of the call, the builder may go ahead and cover the work. Inspections are made as needed, with a minimum of three:

  • Footers: before concrete is poured, after rebar is placed, or for a pole building when the holes are dug and solid concrete is in place.
  • Rough-in: framing, plumbing, heating and electrical.
  • Final: required for the certificate of occupancy, after which the permit file is closed.

The county also sets build details on its inspection sheet: an attached garage on a slab must slope away from the living quarters to a floor drain or the garage door, and pole-building holes must be at least 40 inches deep with 4 inches of solid rock or concrete at the bottom and two bags of concrete mix around the post. Missing an inspection costs $250 per inspection.

Indiana building code in Jefferson County

The county’s inspection sheet applies the Indiana One- and Two-Family Dwelling code to houses, while the UDO governs zoning, subdivisions, accessory structures, driveways, signs and floodplain and airport overlays. FEMA’s Community Status Book lists unincorporated Jefferson County (community 180104) as participating in the National Flood Insurance Program, with maps effective April 2, 2015; the state’s floodplain map viewer shows the mapped areas.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Jefferson County permit search and official resources

For an existing permit, certificate of occupancy or survey, contact the Planning & Zoning Office, which keeps the permit files and approves surveys. The county’s Laserfiche public portal is being expanded beyond the marriage records it holds so far, and Plan Commission meetings are recorded and posted on the county’s government meetings YouTube page.

Inspections are where schedules slip.

Get a free quote →

Jefferson County building permit FAQs

Does the county issue permits in Madison or Hanover?

No. Parcels in the City of Madison, the Town of Hanover or either buffer are under the city’s or town’s zoning control; call Madison at 812-265-8324 or Hanover at 812-866-2131.

How much is a permit for a new house?

$0.15 per square foot of covered area, including the garage, porch and basement, with a $75 minimum; 2,700 covered square feet is $405.

Do I need a permit for a pool or a fence?

Not a building permit; pools, fences and retaining walls are exempt, but fences must follow the UDO’s height and placement rules.

Does a shed need a permit?

Accessory buildings of 200 square feet or more do; smaller ones do not, though they still must meet the UDO.

Can I pay by card?

No. The office accepts cash or checks payable to the Jefferson County Plan Commission only.

What do I need before applying for a house?

A septic permit or approval letter from the health department, or a sewer tap receipt, plus drawings showing plumbing, electrical and HVAC and a site sketch.

When does the Plan Commission meet?

At 5:30 p.m. on the first Tuesday of the month, right after the Board of Zoning Appeals, at the Surveyor’s Office annex.

Simplify Jefferson County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Jefferson County sooner?

Let Alliance prepare, file, and track your Jefferson County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Jefferson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.