In Jennings County, one office handles building permits everywhere: the Jennings County Area Plan Commission and its Department of Code Enforcement at the Government Center, 200 East Brown Street, Vernon (812-352-3005). The commission is a joint body for the county, the City of North Vernon and the Town of Vernon, so a single improvement location permit and building permit process applies across all three. The fee schedule in the county’s zoning ordinance charges $0.12 per square foot for a new house, and the office also licenses electricians and inspects their wiring.
What requires a building permit in Jennings County?
Jennings County runs two linked permits under its zoning ordinance and its building code chapter. The improvement location permit (ILP) comes first and costs nothing under the ordinance’s fee schedule; the building permit follows. The building code chapter requires a permit before any construction, alteration or repair that involves or affects electrical, plumbing, ventilating, heating or air conditioning systems or structural elements.
ILP and permit needed
- New houses, manufactured homes, garages, pole buildings and other accessory buildings
- Room additions, remodels and finished or unfinished basements
- Any structural alteration, enlargement, conversion or repair
- Decks and above-ground or in-ground pools and spas
- Demolition and moving a building, and new or changed signs
- Any digging of earth, and a change in the use of land other than farming
No permit under the ordinance
- Fences
- Roofing, siding and other cosmetic repair or maintenance that does not alter or extend the building
- Portable or mobile storage sheds up to 120 square feet
- Landscaping and agricultural land management
- Farm buildings used only for agricultural purposes (see the 10-acre note below)
The farm exemption may have a size limit: the office’s 2021 ordinance-changes sheet, which is headed “proposed”, quotes an amendment enacted June 9, 2008 under which any building on less than 10 acres needs a building permit whatever its use, so ask the office before building on a small parcel. The fee schedule also sets a minimum of 950 square feet for a new single-family or manufactured home and 600 square feet for a single-wide.
What Jennings County decides and what the state holds
The building code chapter adopts the Fire Prevention and Building Safety Commission’s rules in Title 675 of the Indiana Administrative Code by reference (building, residential, plumbing, electrical, mechanical, energy, pool and fire codes), including later amendments as they take effect. The county sets its own fees, zoning, electrical licensing and property-maintenance rules; the blight ordinances that took effect July 1, 2021 carry fines from $100 to $1,500. Class 1 buildings need the state Construction Design Release, and the county asks for a copy before it issues the local permit.
Short on time to read all of this?
Get a free quote →Jennings County building department: who handles permitting
The Area Plan Commission is a multi-jurisdictional plan commission. The 2006 zoning ordinance replaced unified zoning rules that the county, North Vernon and Vernon had each adopted in 1996, and its building chapter defines Jennings County as including the Town of Vernon and the City of North Vernon. North Vernon’s own permits page says the Area Plan Commission serves the city for building permits, code enforcement, plan review, construction inspections and development requirements. The ordinance names the commission’s Executive Director as the Building Commissioner; Marie Shepherd is the Executive Director.
| Detail | Information |
|---|---|
| Office | Area Plan Commission / Department of Code Enforcement, Government Center, 200 East Brown Street (mail: P.O. Box 400), Vernon, IN 47282 |
| Phone / fax | 812-352-3005 / 812-352-3009 |
| Hours | Monday to Friday, 8:00 a.m. to 4:00 p.m. (county office hours) |
| Online | Permit applications, permit search, contractor and license search, and inspection requests with a contractor code, linked from the Area Planning page |
| Covers | Unincorporated Jennings County, the City of North Vernon and the Town of Vernon |
Jennings County permit types
The ILP application, printed in the zoning ordinance, lists garages, room additions, utility sheds, pole barns, pools and signs, and asks for the lot, township and section, zoning, construction type and cost, size, living and non-living area, bedrooms and baths, electric company and flood zone. It also names the general contractor and whoever does the footing and foundation, structure, electrical, plumbing and mechanical work.
Residential permits
For a site-built house, bring the building design or blueprints; for a manufactured home, the floor plan, the pier and tie-down layout and the purchase agreement. Every file needs the property card, contract or deed, the septic permit or a septic hook-on letter (or sewer tap permit), the water permit, letter or tap form, a driveway permit, and a sketch showing lot lines, the new structure, its distances to every property line and the road, and the septic field. The ILP form adds a material list for building permits.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial, institutional and industrial buildings need the state design release in the file, and a septic permit for a new, expanded or re-zoned commercial or industrial lot comes from the state rather than the county health department. Site development plan review, rezonings and special uses go through the Area Plan Commission, which meets at 6:00 p.m. at the Government Center, generally on the first Monday of the month (November 2 and December 7 in late 2026).
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Septic. The Jennings County Health Department (812-352-3024) issues residential septic permits after a soil evaluation, a septic application and the floor plans; only Jennings County certified septic contractors may install or repair a system, and disturbing the absorption field site can void the permit.
- Sewer. Where sewer is available, the tap permit comes from the utility serving the lot: North Vernon’s wastewater department, Jennings Northwest Regional Utilities, the Town of Vernon Clerk-Treasurer or the Campbell Township Rural Sewer District.
- Driveway. A new drive off a county road without an existing culvert needs a county garage permit; a drive off a state highway needs INDOT’s permit; a drive off a North Vernon street needs the city’s permit.
- Floodplain. No permit can be given for a site in the special flood hazard area (zone A) until the State of Indiana has approved it, and the ILP form asks for the flood zone.
- Land disturbance. Work disturbing 1 acre or more needs IDEM’s construction stormwater permit (the ordinance’s “rule 5”) before the building permit.
- Variances. The Area Board of Zoning Appeals meets at 6:00 p.m. at the Government Center on dates in its 2026 schedule (November 19 and December 17).
Jennings County permit costs and fees
Permit fees follow the official schedule adopted by the Board of Commissioners, the Vernon Common Council and the North Vernon Council, and are paid at the Area Plan Commission before a building permit issues. The schedule printed in the appendix of the 2006 zoning ordinance is below. North Vernon’s permits page links a newer Jennings County permit fee sheet, so ask the office whether any figure has changed before you budget.
| Work | Fee |
|---|---|
| New single-family home or manufactured home | $0.12 per sq ft |
| Basement, finished or unfinished | $0.12 per sq ft |
| Remodel under 420 sq ft / over 420 sq ft | $50 / $0.12 per sq ft |
| Room addition under 254 sq ft / over 254 sq ft | $30 / $0.12 per sq ft |
| Garage or pole building under 254 sq ft / over 254 sq ft | $30 / $0.12 per sq ft |
| Utility or mini barn under 254 sq ft / over 254 sq ft | $30 / $0.12 per sq ft |
| Duplex / multifamily | $0.16 per sq ft |
| Commercial and institutional / industrial | Base fee of $150 / $200 plus a per-sq-ft rate that falls from $0.12 to $0.08 as the building gets larger |
| Electrical: new service / upgrade | $25 / $25 |
| Above-ground pool or spa / in-ground pool | $30 / $60 |
| Demolition: minor / major (commercial and industrial) | $30 / $75 |
| Certificate of occupancy / improvement location permit | $2 / no charge |
| Work started before the permit | 2 times the permit fee |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the appendix schedule: a new 1,800-square-foot house is 1,800 × $0.12 = $216, and a 1,000-square-foot unfinished basement under it adds $120, for $336 before septic, sewer and driveway costs. Rezonings, subdivisions and other petitions carry filing fees plus the cost of newspaper notice and mailed notice to neighbors, which the applicant pays. Septic permit fees are set by the Health Department.
Trade permits and who may pull them
Trade work is covered by the same building permit when it is part of a project, and the ILP form lists who does the electrical, plumbing and mechanical work. A new electrical service or service upgrade has its own $25 permit.
- Electricians are licensed locally. The zoning ordinance’s electrical chapter requires anyone in business as an electrician or electrical contractor in the county, North Vernon or Vernon to hold a license issued by the Area Plan Commission, after an examination. The first license is $25 and a three-year renewal $15; licenses expire on December 31 and can be renewed without a new exam if the renewal is filed within 30 days after expiry. The office posts an Electrical Contractor Renewal form asking for the county license number, test date, bond, insurance and workers’ compensation, and its 2026 schedule lists a Board of Electrical Examiners meeting on April 29, 2026.
- Electrical inspections are done by the county’s Building Commissioner or inspector.
- Plumbers hold the state plumbing contractor license from the Indiana Plumbing Commission.
- Contractor registration. The office’s 2021 ordinance-changes sheet, which is headed “proposed”, describes a contractor card for anyone doing more than $5,000 of construction work: a current code book, proof of liability insurance, $30 the first year and $10 a year to renew, with a $250 fine for working unregistered. Ask the office whether registration applies to your job.
- Owners. The fee schedule says a building permit is obtained by the owner or the contractor.
Rather not deal with the Jennings County building department?
Get a free quote →How to apply for a Jennings County building permit
Look up the parcel on the county GIS and check the setbacks on the property card with the Area Plan office.
Start the soil evaluation and septic application with the Health Department, or get the sewer tap permit from your utility.
From the county garage, INDOT or the City of North Vernon, depending on the road.
Online through the Area Planning page or on the paper form, with plans, a material list and a site sketch.
Commercial work needs the Construction Design Release; flood zone sites need state approval; 1 acre or more of disturbance needs IDEM’s permit.
Pay the fees at the Area Plan Commission before the building permit issues.
Review, corrections and what causes delay
The ordinance requires every building permit file to hold the deed or property card, the septic or sewer approval, the water form, the plans and the driveway permit, so a missing outside approval stops the permit. The Health Department will not complete its septic specification sheet until the soil evaluation, application and floor plans are in. Changes to approved plans must be resubmitted and approved before the work changes, and the office can refuse a permit for any work that breaks state law or the zoning ordinance.
Inspections and certificates in Jennings County
The Building Commissioner makes the inspections needed to confirm the work matches the permit and the code. Contractors with a contractor code can request inspections through the online system linked from the Area Planning page, and the office takes questions at 812-352-3005. Work found incomplete or not ready can be charged a re-inspection fee. Township and fire district fire chiefs assist with inspections of fire suppression, detection and alarm systems.
A building cannot be occupied until the Zoning Enforcement Officer has inspected it and issued a certificate of occupancy ($2). The office must issue the certificate, or explain in writing why it cannot, within 14 days of being told in writing that the building is ready. A temporary certificate of up to six months is possible during a major alteration or for partial occupancy. Building permits expire one year after issue and demolition permits after 90 days; the Building Commissioner can extend one when circumstances beyond the holder’s control stop the work.
Indiana building code in Jennings County
The county’s building chapter incorporates the state rules by reference and applies them in the county, North Vernon and Vernon; agricultural buildings and fences fall outside it. FEMA’s Community Status Book lists unincorporated Jennings County (community 180108) as participating in the National Flood Insurance Program, with its current flood map dated April 2, 2015.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Jennings County permit search and official resources
The Area Planning page links an online permit search, a contractor and license search, and permit applications. For older files, ask the Area Plan office at the Government Center; the ordinance requires the Zoning Enforcement Officer to keep records of every building permit and certificate of occupancy. To report a code violation, bring the signed complaint form with a photo to the office; the county warns that complaints are public records.
- Jennings County Area Planning (permits, portal links, downloads)
- Jennings County Zoning Ordinance (with building and electrical chapters and fee schedule)
- Area Plan ordinance changes sheet, 2021
- Subdivision Ordinance
- 2026 Area Plan, BZA and Electrical Examiners meeting schedule
- Electrical contractor renewal form
- Property ordinances effective July 1, 2021
- City of North Vernon permits page (Area Plan Commission services)
- Jennings County Health Department septic permit steps
- Jennings County Surveyor
- Jennings County GIS
- FEMA Community Status Book, Indiana
- Indiana DHS current building and residential code rules
- Indiana DHS building plan review
Inspections are where schedules slip.
Get a free quote →Jennings County building permit FAQs
Who issues building permits in North Vernon?
The Jennings County Area Plan Commission, which serves the city for building permits, plan review and inspections, as it does Vernon and the rural county.
How much is a permit for a new house?
$0.12 per square foot under the zoning ordinance’s schedule, so an 1,800-square-foot house is $216; ask whether the newer fee sheet changes it.
Do farm buildings need a permit?
Not if used only for agriculture, under the zoning ordinance; the office’s 2021 changes sheet quotes a 2008 amendment requiring a permit for any building on less than 10 acres, so ask the office first.
Do I need a permit for a small shed?
A portable or mobile shed up to 120 square feet needs no ILP; a mini barn under 254 square feet is a $30 permit.
Can any electrician work in Jennings County?
No. Electricians and electrical contractors need a license from the Area Plan Commission, which requires an examination.
Who issues septic permits?
The Jennings County Health Department (812-352-3024), after a soil evaluation; only county-certified septic contractors may install the system.
How long is a permit valid?
One year from issue, or 90 days for demolition, with extensions only for reasons beyond the holder’s control.
Simplify Jennings County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Jennings County sooner?
Let Alliance prepare, file, and track your Jennings County permits while your crew stays on the job.
More Indiana permitting guides
Jefferson County
Read guide →Ripley County
Read guide →Jackson County
Read guide →Johnson County Building Permit Guide
Read guide →Kendallville Building Permit Guide
Read guide →Knox County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Jennings County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.