For land outside Metropolis, Brookport and Joppa, Massac County hands out its building permit forms through the Supervisor of Assessments, Room 1A, 1 Superman Square, Metropolis (618-524-9632, weekdays 8 a.m. to 4 p.m.); call or stop in to get one. The county posts no building code, zoning ordinance or permit fee online. Its Highway Department, which runs every county and township road as a unit road district, issues permits for utilities in county right-of-way and installs driveway culverts at the cost of materials. Large solar farms need a special use permit from the Board of Commissioners under the county solar ordinance.
What requires a permit in Massac County?
The county’s website names these permits and approvals for unincorporated land:
County approvals
- Building permits: forms from the Supervisor of Assessments
- Building or maintaining utilities in county right-of-way: Highway Department permit
- Overweight or oversized loads on county roads, such as a house section or heavy equipment: Highway Department permit, $25 to $250 a load
- New driveway culverts off county-maintained roads: installed by the Highway Department
- Commercial solar energy facilities: special use permit from the Board of Commissioners
Not posted online
- The building permit form itself and its fee
- A county zoning ordinance or building code
- The county solar ordinance text
- Septic and well permit rules
Because the form and its instructions are only available from the office, call 618-524-9632 before you plan a house, garage or addition to learn what the county asks for and what it charges.
What the county decides and what the state holds
The three-member Board of Commissioners adopts county ordinances, including the solar siting ordinance, decides special use permits for solar farms, and appoints members to boards such as the Southern 7 Health Department board and the Cache River Drainage Board. Plumbers and roofing contractors hold state licenses, and the commissioners discussed in March 2026 that state legislation would require changes to the county solar ordinance from June 1, 2026. The commissioners had already approved an amendment to the Massac County Commercial Solar Ordinance on January 28, 2025, and in December 2025 two of them agreed with the county’s attorney that a company only installing transmission lines does not fall under it.
Massac County building department: who handles permitting
No county page describes a building or zoning department. Permit-related offices on the county site:
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Supervisor of Assessments | Building permit forms; parcel records, GIS and aerial maps; exemptions | 1 Superman Square, Room 1A, Metropolis, IL 62960; 618-524-9632; Monday to Friday 8 a.m. to 4 p.m. |
| Highway Department | Right-of-way utility permits, oversize and overweight permits, driveway culverts, county and township roads | County Engineer Brad Watson, 2736 North Avenue, Metropolis, IL 62960; 618-524-5227 |
| Board of Commissioners | Ordinances and solar special use permits | 1 Superman Square, Metropolis; meets on scheduled Tuesdays, usually twice a month |
| Emergency Management Agency | Hazard mitigation plan; flood and earthquake preparedness | 1 Superman Square, Room 1B; 618-524-2999 |
Cities and villages in Massac County
The county describes itself as made up of Metropolis, Brookport and Joppa; the Census 2025 estimates are Metropolis (5,727), Brookport (691) and Joppa (330), out of 13,502 county residents. The county’s pages do not cover permits inside the towns, so ask the city or village hall there. Use the county GIS hub’s parcel search to see whether a property lies inside a town.
The City of Metropolis runs its own Building & Zoning department, reachable at 618-524-3411. Its zoning code sets where residential, commercial, industrial and recreational uses may go, the size of lots and buildings and the density of development, and the city warns that a building or demolition permit may be needed before any work starts; its code of ordinances and zoning map are linked from the city website.
Massac County permit types
Residential permits
- Building permits: request the form from the Supervisor of Assessments by phone or in person; the office also keeps the property record for the parcel and its exemption forms.
- Driveway access: for a home on a county-maintained road, the Highway Department installs the new driveway culvert and charges the cost of materials.
- Septic and wells: the county does not post these rules; the commissioners appoint members to the Southern 7 Health Department board, so ask that health department.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial solar energy facilities go through a special use permit under the Massac County Solar Ordinance. The SB Energy application for the Shawnee Energy Project, a proposed 650-acre solar facility, received a public hearing before the commissioners on April 14, 2026, where the developer walked through the ordinance’s standards: public health and safety, compatibility with nearby properties, orderly development, infrastructure, safe access and traffic, county planning objectives and compliance with county rules. Copies of the application were made available in the County Clerk’s office. At a special meeting on June 15, 2026, the commissioners adopted an ordinance denying a special use permit for siting a commercial solar energy facility. In March 2026 they also approved a zoning letter for the electric lines of Tunnel Hill Solar, a Johnson County project whose transmission line and substation lie in Massac County. Utility work in county right-of-way needs a Highway Department permit, and its 2026 permit form sets the rules: lines go in the top back slope of the ditch within the outer 3 feet of right-of-way, at least 42 inches deep when buried directly or 48 inches when bored; road crossings are bored at right angles, and driveways or landscaping in the path are bored under; new lines keep 5 feet horizontal and 2 feet vertical clearance from existing utilities; and the permittee restores and reseeds open cuts, pays every cost and moves the line at no cost to the county within 60 days if road work requires it.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Find the parcel: the GIS hub, property search and aerial view links on the Supervisor of Assessments page.
- Road access: culverts and right-of-way work through the Highway Department.
- Drainage: the commissioners appoint the Cache River Drainage Board, and during the SB Energy review the drainage district raised its own concerns with the commissioners.
- Floodplain: unincorporated Massac County participates in the National Flood Insurance Program, so ask the county whether your parcel is in a mapped flood zone before you build.
Massac County permit fees
The county does not publish a building permit fee or fee schedule online; the amount comes with the form from the Supervisor of Assessments (618-524-9632). The charges the county does describe:
Rather talk it over?
Call 1-855-478-4290 →| Item | Charge |
|---|---|
| Building permit | Not posted; ask the Supervisor of Assessments |
| New driveway culvert off a county-maintained road | Cost of materials; the Highway Department installs it |
| Oversize load on county roads | $25 per load |
| Overweight load under 120,000 lbs. | $50 per load |
| Overweight load from 120,000 to 250,000 lbs. | $100 per load |
| Overweight load over 250,000 lbs. | $250 per load |
| Right-of-way utility permit | No fee printed on the 2026 form; the permittee pays all work and restoration costs |
Ask for the building permit amount when you pick up the form, since no county page states it. Worked example from the transport schedule: a contractor moving a 140,000-pound load over county roads on two trips pays $100 per load, or $200, by mail or online; each permit covers only the named vehicle and route, runs from sunrise to sunset on weekdays that are not holidays, and is void if the route shows ice or snow. Loads wider than 8 feet or taller than 13 feet 6 inches are oversize.
Trade permits and who may pull them
The county site lists no electrical, plumbing or mechanical permits and no contractor registration for unincorporated land. Trade work still falls under state licensing: plumbers hold Illinois plumbing licenses and roofing contractors state roofing licenses. The county site posts no septic or well rules; its commissioners appoint members to the Southern 7 Health Department board, the place to ask about those permits. Utility contractors working in county right-of-way need the Highway Department’s underground utility installation permit, and haulers of oversize or overweight loads its transport permit. Inside Metropolis, Brookport and Joppa, each town sets its own rules.
How to apply for a building permit in Massac County
Use the county GIS hub or property search to confirm the land is outside Metropolis, Brookport and Joppa.
Call the Supervisor of Assessments at 618-524-9632 or stop in at Room 1A, 1 Superman Square.
Ask which drawings, site details and fee the county needs for your project.
Contact the Highway Department at 618-524-5227 for a driveway culvert or any work in county right-of-way.
Ask the health department serving the county about septic and well approvals.
Return the form to the office and keep a copy of the issued permit.
Rather not deal with the Massac County building department?
Get a free quote →Review, corrections and what causes delay
Building permit forms are handled at the Assessments counter, but solar projects follow the commissioners’ special use process: application, a public hearing, written questions and comments for 7 business days afterward, and a vote at a later meeting. The SB Energy case ran from an accepted application in February 2026 to a hearing in April and a denial ordinance in June. The commissioners meet on scheduled Tuesdays, usually twice a month, with one Wednesday meeting in March 2026 because of the election.
Inspections in Massac County
The county site describes no building inspection program for houses or other buildings in unincorporated areas, so ask the Supervisor of Assessments what follow-up the county requires once a permit is issued. The Highway Department maintains culverts, bridges and roads, installs driveway culverts on county-maintained roads, and takes work requests and complaints through its online form. None of the county offices listed here describes septic or well inspections; ask the health department.
For flood and earthquake risk, the Emergency Management Agency keeps the county’s Emergency Operations Plan and Hazard Mitigation Plan and shares preparedness guidance.
Building codes in Massac County
Massac County’s website posts no building code, zoning ordinance or floodplain ordinance; the county solar ordinance is referred to in the commissioners’ minutes but not posted. FEMA lists unincorporated Massac County (community 170467) as participating in the National Flood Insurance Program, with a current flood map dated November 26, 2010.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Massac County permit FAQs
Where do I get a building permit in Massac County?
From the Supervisor of Assessments, Room 1A, 1 Superman Square, Metropolis: call 618-524-9632 or stop in, weekdays 8 a.m. to 4 p.m.
How much does a Massac County building permit cost?
The county does not publish the fee; ask when you request the form.
Want this handled start to finish?
Get a free quote →Who installs a driveway culvert on a county road?
The Highway Department installs new driveway culverts for access off county-maintained roads, at the cost of materials.
Does the county issue permits in Metropolis?
No. The county’s pages cover unincorporated land; inside Metropolis, the city’s Building & Zoning department (618-524-3411) administers the city zoning code and warns that a building or demolition permit may be needed; ask Brookport or Joppa about work inside their limits.
What does it cost to haul an oversize or overweight load on county roads?
$25 per oversize load, and $50, $100 or $250 per overweight load depending on whether it is under 120,000 pounds, up to 250,000 pounds or heavier; permits are for one vehicle and route and cannot be extended.
Who handles township roads?
The county Highway Department; Massac is a county unit road district, so the County Engineer runs both county and former township roads.
Can I build a solar farm in Massac County?
Only with a special use permit under the county solar ordinance; in June 2026 the commissioners denied one for a commercial solar facility after a public hearing.
How do I request county permit records?
Massac County has no single FOIA officer; send a written request to the office that holds the record, by mail to 1 Superman Square, by email or in person.
Massac County permit records and official resources
Under the county’s FOIA notice, each office holder answers requests for its own records, so ask the Supervisor of Assessments for building permit records and the Highway Department for right-of-way permits. Written requests can be mailed to Massac County, Attn: FOIA Officer, 1 Superman Square, Metropolis, IL 62960, emailed to the office, or made in person at the courthouse, the sheriff’s office or the Highway Department.
Inspections are where schedules slip.
Get a free quote →- Supervisor of Assessments (permit forms, parcels)
- Massac County GIS hub
- County Highway Department and permit applications
- Utility permit for county right-of-way (2026 form)
- Oversize / overweight transport permit and fees
- City of Metropolis Building & Zoning
- Board of Commissioners, agendas and minutes
- 2026 commission meeting dates
- SB Energy solar public hearing minutes, April 14, 2026
- Special meeting minutes, June 15, 2026 (solar special use)
- Commission minutes, March 18, 2026
- FOIA notice
- Emergency Management Agency
- FEMA Community Status Book, Illinois
Simplify Massac County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Massac County sooner?
Let Alliance prepare, file, and track your Massac County permits while your crew stays on the job.
More Illinois permitting guides
Mason County
Read guide →Marshall County
Read guide →McDonough County
Read guide →Matteson Building Permit Guide
Read guide →Mattoon Building Permit Guide
Read guide →Maywood Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Massac County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.