Maywood, Illinois Building Permit Guide

To get a building permit in Maywood, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Maywood’s Building and Code Enforcement Department at 40 Madison Street reviews plans and issues building, electrical, plumbing and HVAC permits inside the village, with most fees set at 2% of construction cost.

Authority: Maywood Building & Code EnforcementFees: Ordinance CO-2023-45Phone: 708-450-4405
Authority
Building & Code Dept.40 Madison Street, Maywood
Building fee
2% of cost$50 minimum for alterations
Plan review
3 business daysMost jobs need two reviews
Selling a home
Pre-sale inspectionCertificate of compliance or escrow

In the Village of Maywood, building permits come from the Building and Code Enforcement Department at 40 Madison Street (708-450-4405), headed by Greg Buchanan, Director of Public Works and Building & Code. Applications with plans and a plat of survey go to a village building inspector, whose first review takes about three business days. Under Ordinance CO-2023-45, adopted November 7, 2023, most permits cost 2% of the construction cost, with a $50 minimum for alterations and repairs and a $500 minimum for new buildings.

What requires a building permit in Maywood?

Maywood narrowed the usual list of permit-free work when it adopted the 2018 International Building Code series in November 2023. The ordinance deleted most of the code’s building exemptions (section 105.2, items 1, 2, 3, 4, 6, 8, 12 and 13), so small storage sheds and playhouses, fences, short retaining walls, sidewalks and driveways, window awnings and movable racks and partitions up to 5 feet 9 inches high are not exempt here.

Permit needed

  • New buildings, additions, remodeling and structural repairs
  • Detached garages, sheds and other accessory buildings of any size
  • Parking pads, patios and residential or commercial driveways
  • Fences (a permit from the Zoning Administrator)
  • Central air conditioning, furnaces and boilers
  • Swimming pools, solar panels, signs, awnings and underground tanks
  • Moving, raising, underpinning or wrecking a building
  • Street occupancy, dumpsters on the street and right-of-way work

Still exempt

  • The remaining IBC 105.2 items, such as painting, papering, tiling, carpeting, cabinets and countertops
  • Window and individual apartment air conditioners

Plans must be drawn to a scale of at least one-eighth inch to the foot and come with a PDF copy and a plat of survey, and the drawings must show the lot lines, where the building sits, and its ventilation, sewer, drain and plumbing layout. They must be prepared by someone allowed to design buildings under state law. Work started before an electrical permit is issued is stopped and the permit fees double; emergency work is excused if the permit is taken out within one business day.

What Maywood decides and what the state holds

Maywood is a home-rule village. Its Chapter 150 adopts the 2018 International Building, Residential, Fire, Property Maintenance, Fuel Gas, Mechanical, Swimming Pool and Spa and Existing Building codes and the 2017 National Electrical Code, all with local amendments, plus the village’s own detached-garage specifications. For energy and plumbing it adopts the most recent state energy code and the Illinois Plumbing Code. The whole village is a fire-limits district, so new combustible frame buildings are allowed only within listed exceptions (houses built to the IRC with the required separations are one), and buildings with three or more dwelling units need 2-hour masonry or concrete separations unless fully sprinklered under NFPA 13. The Village Manager hears appeals of the building official’s decisions as the Board of Appeals.

Maywood building department: who handles permitting

The Building and Code Enforcement Department issues permits and inspects construction, and its director is the village’s building official under the 2023 ordinance. Each permit application is assigned to a village building inspector, who answers questions about that project; for projects that need a commission vote, the director is the contact. Zoning questions go to Community Development.

Short on time to read all of this?

Get a free quote →
Maywood permit contacts
DetailInformation
OfficeBuilding & Code Enforcement Department, 40 Madison Street, Maywood, IL 60153
Phone708-450-4405 (permits and code complaints); village main line 708-450-6300
Department headGreg Buchanan, Director of Public Works and Building & Code
ZoningCommunity Development, 708-450-6307
MeetingsVillage Council Chambers, 125 S. 5th Avenue
Unincorporated landCook County Department of Building and Zoning, 312-603-0500

Maywood permit types

One Application for Building Permit covers new construction, additions, remodeling of finished space, repairs, garages and commercial or public buildings. It lists every contractor from architect to electrician with Maywood and state license numbers, the square footage, total job cost and whether the property is historic; the fee box splits building, plumbing, electrical, HVAC, sewer and demolition charges.

Residential permits

  • Houses and additions. A new residence, or an alteration over half its value that needs a certificate of occupancy, needs a $10,000 bond filed with the Village Clerk until the final inspection and occupancy certificate are issued.
  • Garages and sheds. Garages follow the village’s own detached-garage specifications, and their wiring runs underground in PVC, IMC or rigid conduit.
  • Townhouses. The village’s IRC amendments waive the townhouse sprinkler rule (R313.1) for buildings of five or fewer attached units used as single-family homes, if each unit has two means of egress (one may be a sliding door at least 30 inches wide), noncombustible or drywall-encased stairs, drywall-protected trusses and hard-wired smoke detectors on every level.
  • Solar. Roof systems need sealed structural load calculations and ComEd interconnection approval; ground arrays may not sit in the front yard or cover more than 25% of the rear yard.

Commercial permits

New commercial, institutional, storage, school and church buildings pay 2% of construction cost with a $500 minimum. Sprinkler systems, fire alarms, elevators, underground tanks and signs are permitted separately, and hydrant flow and underground flush tests are $200 each.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Village code makes zoning compliance a prerequisite for a building permit; the application is filed with requests for certificates of occupancy and compliance. Variations, special uses and map or text amendments go to the Plan Commission/Zoning Board of Appeals, which generally meets at 7:00 p.m. on the second and fourth Tuesday of each month in the Village Council Chambers. The zoning ordinance dates from April 2010, with transit-oriented development amendments adopted January 7, 2025.
  • Fences. Ordinance CO-2024-24 requires a Zoning Administrator permit for any new or replacement fence and bars fences between the front lot line and the front of the house in residential districts, except where its subsection 5 allows them.
  • Landmarks. All 17 Maywood properties on the National Register of Historic Places are local landmarks; the Historic Preservation Commission meets at 7:00 p.m. on the first Thursday of the month and helps owners plan repairs.
  • Streets, water and sewer. Right-of-way work needs a village right-of-way permit, and new water or sewer service uses the village water-sewer application. Development disturbing more than half an acre also needs an MWRD Watershed Management Ordinance permit.

Maywood permit costs and fees

Fees come from section 150.004 as rewritten by Ordinance CO-2023-45, adopted November 7, 2023; the ordinance list posted by the Village Clerk shows no later building fee change. Construction cost is determined from the current edition of RSMeans, and the code official has the final say on cost. Most rows are a flat amount or 2% of cost, whichever is greater. Fees are set when the application is approved and must be paid before the permit is issued.

Maywood building permit fees (Ordinance CO-2023-45)
WorkFee
New buildings (residential, commercial, public, storage and others)2% of construction cost; $500 minimum
Alterations and repairs2% of cost; $50 minimum
Garages and accessory buildings$100 up to 200 sq ft; $200 above; or 2% if greater
Parking pads and patios$100 or 2%
FencesResidential $50 or 2%; other property $100 or 2%
DrivewaysResidential $50 or 2%; commercial $100 or 2%
Swimming pools$50 minimum or 2%
Electrical$50 minimum plus $50–$350 for a new service (100–1,000 amps) and $5 per circuit up to 50 ($3.50 each above)
Solar panels$7 per panel plus $15 per piece of equipment
Air conditioner; furnace or boiler$75 or 2% each
Plumbing$50 minimum plus $20 per fixture, $45 miscellaneous piping, $50 water heater, $100 sewer connection, or 2%
Water and sewerWater connection $100 (3/4 in.), $150 (1 in.), $120 (larger); tap fee $1,000 per inch; sewer impact fee $500 per inch; meter at cost plus 15%
WreckingBuilding $250 or 2%; garage or accessory building $100 or 2%
Fire alarm; sprinklers$200 or 2%; $175 minimum for the first 150 heads plus 2% of cost
Plan review$50 minimum or the contracted review price plus 15%; each extra review 50% of the first
Certificate of occupancy; permit extension$75; 20% of the original permit fee

Rather talk it over?

Call 1-855-478-4290 →

Owner-occupants aged 65 or older get half off alteration and repair permit fees on property with no more than four residential units, with two proofs of residency, one of them an Illinois driver’s license or ID card; mixed-use property does not qualify. The older residential solar sheet still quotes $5 per panel and the 1999 electrical code; the adopted ordinance sets $7 per panel.

Trade permits and who may pull them

Maywood licenses contractors under Village Code section 111.03. Every license costs $100, and the bond and papers depend on the trade.

  • General contractors: a $5,000 bond and a certificate of liability insurance.
  • Electrical contractors: a $10,000 bond, insurance and a license from a testing municipality or the City of Chicago. Solar installers must also be registered for the current year and show an Illinois Commerce Commission certificate of service authority.
  • Roofing contractors: a $5,000 bond, insurance, a driver’s license and the state roofing license issued by the Illinois Department of Financial and Professional Regulation.
  • Excavation and wrecking: a $20,000 bond, plus a $10,000 restoration bond for digging in the public right-of-way.
  • Plumbing: work follows the Illinois Plumbing Code and is done by a plumber licensed by the Illinois Department of Public Health; the application lists the plumber with the other contractors.

Maywood adds its own electrical rules to the national code. Non-metallic sheathed cable (“Romex”) and aluminum conductors are banned; exposed work and new construction need EMT, IMC or rigid conduit, with flexible metal conduit allowed only for concealed remodeling; new wiring must be at least 12 AWG copper. Service entrances need 1-1/4 inch IMC rigid or aluminum conduit with #3 wire, panels need at least 20 positions, a single-family home needs at least eight circuits, major appliances each need a separate 20-amp circuit, and tandem breakers are banned except in temporary trailers. On both residential and commercial services the ground wire connects directly to the street side of the water meter with a jumper, unless the electrical engineer gives special permission.

Rather not deal with the building department?

Get a free quote →

How to apply for a Maywood building permit

1. Check zoning first

Call Community Development about setbacks, fence location and whether the Plan Commission/ZBA must act.

2. License the contractors

Each contractor files the Maywood contractor license application with its bond and insurance.

3. Prepare plans

Scaled drawings with a PDF copy, a plat of survey and, for solar, the extra structural and ComEd papers.

4. File the application

Submit the Application for Building Permit with every contractor listed to the department at 40 Madison Street.

5. Work with your inspector

The assigned building inspector reviews the plans and sends back any corrections.

6. Pay and pick up

Staff call when the permit is approved; pay the fees, then start work.

Review, corrections and what causes delay

The first review usually takes three business days, and each resubmission another three business days from the day revised plans arrive; most projects go through two formal reviews. Solar applications average five to seven business days once complete. A permit lapses if work does not start within 90 days of issue or stops for 180 days; the building official may grant written extensions of up to 180 days each, at 20% of the original fee. Changes to stamped plans need the building director’s written consent.

Inspections and certificates in Maywood

The building inspector assigned during plan review stays the contact for the job. Underground garage wiring must be inspected before backfilling. Solar jobs need a racking and rough electrical inspection before the modules go on, then final electrical and structural inspections after ComEd approves the interconnection, and the solar permit must be posted in view of the street with the approved plans on site. A certificate of occupancy ($75) follows the final inspection, and a new house cannot be occupied until it is issued.

Every property sold or rented in Maywood needs a pre-sale or pre-rental inspection and a Certificate of Compliance. The village suggests starting about 30 days before closing; the inspection fee is $90 for a one- or two-unit building, $75 for a single apartment lease and $25 for a vacant lot. Maywood does not allow an “as is” sale; instead, the buyer and seller may set up an escrow with the village as escrowee and receive a conditional certificate. Vacant properties for sale must also be registered. A rental unit is inspected before each new tenant moves in, landlords register every year, and a sale or rehab triggers an electrical inspection that requires grounded outlets and GFCI protection.

Illinois building code in Maywood

Maywood enforces the 2018 International Code series and the 2017 National Electrical Code as amended by Ordinance CO-2023-45, which replaced the 2003 codes and the 1999 electrical code; the village reported the update to the Capital Development Board before it took effect. FEMA’s Community Status Book lists the Village of Maywood (community 170124) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Maywood building permit FAQs

How much is a building permit in Maywood?

Most permits are 2% of construction cost, with a $50 minimum for alterations and repairs and $500 for a new building.

Do I need a permit for a shed or fence in Maywood?

Yes. Maywood removed the small-shed and fence exemptions; a fence also needs a Zoning Administrator permit and cannot go in most front yards.

How long does plan review take?

About three business days for the first review and three more after each resubmission; most projects need two reviews.

Can an electrician use Romex in Maywood?

No. Non-metallic cable and aluminum conductors are banned, and new construction needs metal conduit and copper wire of at least 12 AWG.

Do contractors need a Maywood license?

Yes. General, electrical, roofing and excavation contractors pay $100 and post a bond of $5,000 to $20,000 depending on the trade.

Can I sell my house as is in Maywood?

No. After the pre-sale inspection you either fix the violations or set up an escrow with the village to get a conditional certificate of compliance.

Is there a senior discount on permits?

Yes. Owner-occupants 65 or older pay half the alteration and repair fee on property with four or fewer residential units.

Maywood permit search and official resources

Permit and inspection records are public records of the village. Use the village’s Freedom of Information request form, sent by email, mail, fax or in person to 40 Madison Street (708-450-6360), and say whether you want paper or electronic copies. The Village Clerk posts adopted ordinances, including the building code and fee ordinances, online.

Inspections are where schedules slip.

Get a free quote →

Simplify Maywood permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Maywood sooner?

Let Alliance prepare, file, and track your Maywood permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Maywood permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.