Building permits in Mattoon are issued by the city’s Community Development and Code Enforcement office at City Hall, 208 North 19th Street (217-234-7367, permits@mattoonillinois.org), headed by Community Development and Planning Director and Zoning Official Alexander Benishek. The office has separate applications for building, plumbing, mechanical, fence, sign, demolition and street work, plus an extraterritorial permit for land within the city’s 1½-mile zoning area, and zoning petitions cost $200 for a variance and $300 for a rezoning or special use.
What requires a building permit in Mattoon?
Mattoon does not publish a list of exempt work on its permit page; instead it publishes a separate application for each kind of project, which shows what the office expects to permit. If your project is not clearly covered, email permits@mattoonillinois.org or call 217-234-7367 before starting.
City permit applications
- Building permits for new houses, duplexes, commercial buildings, additions and detached garages
- Plumbing permits
- Mechanical (HVAC) permits
- Fence permits
- Sign permits
- Demolition permits
Site and utility permits
- Street cut and use of street permits for work in the public way
- Water tap and sewer tap permits
- Street or boulevard permits for sidewalks, curbs and driveway approaches
- Extraterritorial permits for zoned land outside the city limits
The plan rules hint at the scale of review. A detached garage needs only a plot plan, filed with the permit copy; a single-family home or duplex needs a plot plan showing building size, its position on the lot, the adjacent streets, off-street parking and drive entrances; and every other building needs two full plan sets.
What Mattoon decides and what the state holds
Mattoon adopts its own building, residential, fire and existing-building codes, writes its zoning, subdivision, floodplain, sign and corridor development ordinances, and has its own electrical code ordinance. Coles County confirms that Mattoon’s zoning reaches 1½ miles beyond the city boundary, while the county itself has no zoning or building permits on rural land past that ring. The state’s pieces are the Illinois Plumbing Code and Accessibility Code, which the city lists in its code list, and state licenses for plumbers and roofers. For every building other than a house, duplex or detached garage, the city requires construction documents sealed by a design professional with an Illinois registration.
Mattoon building department: who handles permitting
The Community Development and Code Enforcement office combines planning and permitting. Its community development side handles land use approvals, zoning review, site development review and long-range planning; its code enforcement side reviews plans, issues permits, inspects work and enforces the property maintenance code. Staff include a plumbing and building inspector and an electrical inspector working under the director.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Community Development and Code Enforcement, City Hall, 208 North 19th Street, Mattoon, IL 61938 |
| Department head | Alexander Benishek, Community Development and Planning Director (Zoning Official) |
| Permits | 217-234-7367; permits@mattoonillinois.org |
| Planning and zoning questions | 217-234-7367; cd@mattoonillinois.org |
| City Hall hours | Monday to Friday, 8 a.m. to 4:30 p.m.; main line 217-235-5654 |
| City Clerk (zoning petitions, records) | 2nd floor, City Hall; 217-235-5655 |
| Public Works (right-of-way work) | 221 North 12th Street |
Inside the 1½-mile ring around the city, owners use the extraterritorial permit application. Septic systems on unsewered land, in the city’s fringe or elsewhere, are permitted by the Coles County Health Department in Charleston rather than by the city.
Mattoon permit types
The city posts each application as a download from the Community Development and Code Enforcement page; the building permit application on file there was last updated on April 27, 2026. If anyone other than the owner applies, the office needs a certification from the owner.
Residential permits
- New homes and duplexes. Submit a plot plan showing the building size and location, adjacent streets, off-street parking and drive entrances with the building permit application.
- Detached garages. A plot plan of the property is filed with the permit copy.
- Plumbing and HVAC. Separate plumbing and mechanical permit applications cover trade work.
- Fences, signs and demolition. Each has its own application.
- Sidewalks, curbs and driveway approaches. Work on the city right-of-way needs Public Works approval and a city street or boulevard permit before it starts; owners who supply the labor can apply for the city’s cost-sharing program, under which the city pays for the concrete and stone base.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Every building other than a house, duplex or detached garage needs two sets of complete plans: plot plan, parking layout, site work plan, general building plans and electrical, plumbing and mechanical plans with all calculations, plus a surface water drainage plan when more than 10,000 square feet of ground is altered. All construction documents must be sealed by a design professional with an Illinois registration. Commercial projects also answer to the city’s sign ordinance and corridor development ordinance, and the office links to the city’s TIF applications and guidelines for projects in a TIF district.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Changing a property’s zoning classification takes a rezoning petition ($300), an exception to a zoning regulation takes a variance ($200), and a use not typically allowed in the district takes a special use ($300). Petitions and fees, by cash or check, go to the City Clerk’s Office in person or by mail, and the city posts step-by-step filing instructions and sample petitions.
- Planning Commission. The commission meets at 5:30 p.m. in the Council Chambers at City Hall on its 2026 schedule, usually twice a month; the City Council meets at 6:30 p.m. on the first and third Tuesdays.
- Floodplain. Building in a mapped flood area falls under the Mattoon Floodplain Ordinance, which the office enforces.
- Utilities and streets. Water and sewer taps and any street cut need their own permits before connection or excavation.
- Septic outside the sewer area. In the fringe, an unsewered lot needs a Coles County Health Department permit. The county asks for a soil evaluation first, can refuse a permit where public sewer is within 300 feet of a house, wants the application at least 7 days before work starts, and voids a permit not used within six months.
Mattoon permit costs and fees
The only permit-related fees printed on the Community Development and Code Enforcement page are the zoning petition fees. Building, trade and other permit fees are not listed there; ask the office at 217-234-7367 or permits@mattoonillinois.org for the fee on your project before you submit.
| Item | Fee |
|---|---|
| Rezoning petition | $300 |
| Variance petition | $200 |
| Special use petition | $300 |
| Building, plumbing, mechanical, fence, sign and demolition permits | Not printed on the city’s permit page; quoted by the office |
| Sidewalk, curb and driveway approach cost sharing | City pays concrete and aggregate base when the owner supplies labor and equipment |
| Coles County septic plan review (unsewered fringe lots) | $200 for a single-family home without surface discharge |
Rather talk it over?
Call 1-855-478-4290 →Petition fees are paid by cash or check, in person or by mail, to the City Clerk’s Office at 208 North 19th Street, together with the completed petition. For mailed filings, address both to the attention of the Mattoon City Clerk’s Office, 208 N 19th Street, Mattoon, IL 61938.
The cost-sharing policy is the one place the city prints a construction rate: for approved sidewalk, curb and gutter and driveway approach replacements on the city right-of-way, the city reimburses the contractor for concrete at $92 per cubic yard. Quantities are measured at 4 inches deep for sidewalks, 6 inches for sidewalks across driveways and for driveway approaches, and 10 inches for curb and gutter. The city will not share the cost of a driveway approach unless the adjacent sidewalk, curb and gutter are replaced as the city deems necessary, it does not pay for driveway work beyond the sidewalk, and it inspects the work during and after construction before reimbursing. Any damage to the pavement or boulevard must be repaired by the contractor or homeowner first. The program is meant for elective repairs of existing city facilities: it does not cover new residential, commercial or industrial construction, curbs on private property, or curbs and gutters attached to driveways.
Trade permits and who may pull them
Mattoon issues plumbing and mechanical permits on their own applications and enforces its own electrical code ordinance, with a city electrical inspector and a plumbing and building inspector.
- Electrical: work is governed by the Mattoon Electrical Code Ordinance and the 2008 National Electrical Code listed by the office; ask the office whether a city electrical license or registration is needed for your job.
- Plumbing: the city lists the 2014 Illinois Plumbing Code, and plumbers are licensed by the Illinois Department of Public Health.
- Mechanical: HVAC work has its own permit application and follows the 2003 International Mechanical Code listed by the city.
- Roofing: roofing contractors are licensed by the Illinois Department of Financial and Professional Regulation.
- Design professionals: plans for any building other than a house, duplex or detached garage must be sealed by an Illinois-registered design professional.
Rather not deal with the building department?
Get a free quote →How to apply for a Mattoon building permit
Confirm the district and whether the property is inside the city or in the 1½-mile extraterritorial area; call 217-234-7367 with questions.
File a rezoning, variance or special use petition with the City Clerk if the project does not fit the zoning ordinance.
Building, plumbing, mechanical, fence, sign, demolition, street cut, water and sewer tap, or extraterritorial.
A plot plan for houses, duplexes and garages; two sealed plan sets with calculations for all other buildings.
Send the application to permits@mattoonillinois.org or bring it to City Hall, with an owner’s certification if you are not the owner.
Pay the fee the office quotes and arrange inspections with the office as each stage of the work becomes ready.
Review, corrections and what causes delay
For commercial work, a missing drainage plan on a site disturbing more than 10,000 square feet, or plans without an Illinois design professional’s seal, will hold up review. A building permit that depends on a zoning change waits for the Planning Commission and City Council calendars. Work in a street, sidewalk or curb needs Public Works approval before it starts, and septic systems in the fringe need the county permit first.
Inspections in Mattoon
Inspections are done by the city’s own staff: a plumbing and building inspector and an electrical inspector in the Community Development and Code Enforcement office. The city’s pages do not post an inspection checklist or a booking cut-off, so arrange each inspection with the office at 217-234-7367 or permits@mattoonillinois.org and ask at permit issue which stages your job needs. The same office enforces the property maintenance code and takes complaints about violations through its general complaint form, and the Coles County Health Department inspects septic systems in the unsewered fringe before they are covered.
Illinois building code in Mattoon
The office lists the codes it enforces as the 2024 International Building, Residential and Fire Codes, the 2021 International Existing Building Code, the 2003 International Mechanical and Property Maintenance Codes, the 2008 National Electrical Code, the 2014 Illinois Plumbing Code, the 2018 Illinois Accessibility Code and the 2010 ADA Standards, together with the city’s subdivision, zoning, floodplain, electrical, sign and corridor development ordinances. FEMA’s Community Status Book lists Mattoon (community 170053) as participating in the National Flood Insurance Program, with flood maps effective July 18, 2011.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Mattoon permit search and official resources
For copies of permits or other city records, use the Illinois Freedom of Information Act request form from the City Clerk’s Office, 2nd floor of City Hall (217-235-5655); certified copies of ordinances, resolutions and council minutes also come from the Clerk, whose office stays open over the lunch hour on weekdays except holidays. The city’s 2026 Comprehensive Plan, written by Coles County Regional Planning, was posted on August 4, 2026.
- Community Development and Code Enforcement (codes, forms, contacts)
- Community Development
- Building permit application
- Extraterritorial permit application
- City Council and Planning Commission schedules
- City Clerk and FOIA requests
- Sidewalk, curb and driveway cost sharing
- 2026 Comprehensive Plan notice
- Coles County zoning statement (1½-mile areas)
- Coles County Health Department septic permits
- FEMA Community Status Book, Illinois
Mattoon building permit FAQs
Inspections are where schedules slip.
Get a free quote →Where do I get a building permit in Mattoon?
From Community Development and Code Enforcement at City Hall, 208 North 19th Street; call 217-234-7367 or email permits@mattoonillinois.org.
How much does a variance cost?
$200; a rezoning or special use petition is $300, paid by cash or check to the City Clerk’s Office.
Do I need a permit to build outside the city limits near Mattoon?
Within 1½ miles of the city, Mattoon’s zoning applies and the city has an extraterritorial permit application; farther out, Coles County requires no building permit.
What plans do I need for a new house?
A plot plan showing the house size and location, adjacent streets, off-street parking and drive entrances.
Do commercial plans need a seal?
Yes. All construction documents for buildings other than houses, duplexes and garages must be sealed by an Illinois-registered design professional, in two complete sets.
Which building codes does Mattoon use?
The 2024 International Building, Residential and Fire Codes, with older editions for mechanical, property maintenance and electrical work, as the city lists them.
When does the Planning Commission meet next?
The remaining 2026 meeting on the city’s schedule is December 8, at 5:30 p.m. in the Council Chambers at City Hall.
Can the city help pay to replace a sidewalk or driveway approach?
Yes, for elective replacement of existing sidewalks, curbs and approaches on city right-of-way: the city pays for the concrete and stone base if the owner supplies the labor, after Public Works approves the application and a street or boulevard permit is issued. New construction is not covered.
Simplify Mattoon permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Mattoon sooner?
Let Alliance prepare, file, and track your Mattoon permits while your crew stays on the job.
More Illinois permitting guides
Coles County
Read guide →Charleston
Read guide →Douglas County
Read guide →Maywood Building Permit Guide
Read guide →McHenry County Building Permit Guide
Read guide →McLean County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Mattoon permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.