For land outside the cities and villages, building permits in Marshall County come from the Zoning Department, 552 State Route 26, Lacon (309-246-6401, weekdays 7:30 a.m. to 4 p.m.), headed by Zoning Administrator Ryan Giacometti. The permit checks zoning, setbacks and lot coverage: the county calls itself a non-building-code jurisdiction, so meeting building codes is the owner’s responsibility. A new house costs $0.10 per square foot (minimum $150), garages and sheds $0.05 (minimum $50), and farm buildings nothing. New homes need the Marshall County Health Department’s septic and well sign-off first, and new commercial buildings need a qualified inspector’s certificate before anyone moves in.
What requires a permit in Marshall County?
The county zoning ordinance (adopted December 11, 2008, last amended May 14, 2026) says no building, structure or addition may be started, and no new use of land begun, until the Zoning Administrator has issued a building permit. It applies to the unincorporated county and to any municipality in the county that has no zoning ordinance of its own.
Permit needed
- New houses, two-family dwellings and additions
- Garages, sheds, pole barns and other accessory buildings
- Commercial, industrial and multi-family buildings
- Shipping or storage containers kept more than a year
- Ground-mounted solar and towers over 35 feet
- Mobile homes in a park or subdivision
- Wind, commercial solar and battery storage facilities
No permit or fee
- Farm buildings in agricultural districts: a written notice showing setbacks is enough, at no charge
- Towers up to 35 feet
- Rooftop solar for personal or farm use in agricultural and residential districts, when less power is sold than used
- Containers kept under 30 days, or any container in an industrial district
- Public utility lines and railroad track
What the county decides and what the state holds
The County Board adopts the zoning, subdivision and floodplain ordinances and sets the fees; the Zoning Administrator issues permits, and the Zoning Board of Appeals hears variances, special uses and appeals. Because Marshall County has adopted no building code, its permit does not include plan review or construction inspections. State law fills part of that gap for commercial buildings, and the state handles plumbing licenses and roofing contractor licenses, as it does everywhere in Illinois.
Marshall County building department: who handles permitting
The Zoning Department and the Highway Department share the building at 552 State Route 26 in Lacon. Zoning handles building permits, container registrations, variances, special uses and rezonings; the Highway Department, led by County Engineer Catherine Hanson, PE, handles entrances and other work in county highway right-of-way.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Zoning Department | Building permits, zoning, floodplain and subdivision review | 552 State Route 26, Lacon, IL 61540; 309-246-6401; fax 309-246-3446; Monday to Friday 7:30 a.m. to 4 p.m. |
| Highway Department | Entrance (access), utility and right-of-way permits on county highways; overweight loads | Same building; 309-246-6401; 8 a.m. to 4 p.m. weekdays |
| Marshall County Health Department | Septic and well permits and the sign-off on building permits | 319 6th Street, Lacon, IL 61540; (309) 246-8074; Monday to Thursday 8 a.m. to 4 p.m., Friday 8 a.m. to 1 p.m. (the county application lists 8 a.m. to 4:30 p.m.) |
Cities and villages in Marshall County
The Census lists nine incorporated places, with 2025 population estimates: Henry (2,280), Lacon (1,822), Toluca (1,310), Wenona (935, part), Hopewell (411), Varna (365), Sparland (353), La Rose (103), Washburn (56, part). The county ordinance reaches into a municipality only if that town has no zoning ordinance of its own; the county’s pages do not list which towns those are, so ask the city or village hall first and the Zoning Department second. The county’s GIS zoning layer is the official zoning map and shows whether a parcel lies outside town limits.
Marshall County permit types
One application (posted September 2025) serves every kind of building; you tick new construction, addition or alteration, or repair and replacement, list the building and lot areas, and sketch the project with its distance to the road and lot lines. Construction must start within 6 months and finish within 18 months of issue.
Residential permits
- Houses and additions: a plat and a site plan, each in duplicate, showing the lot, building footprint, height and setbacks.
- Septic and well: for a new home, or an addition that adds bedrooms, get the Health Department’s signature on the application or attach the septic and well permit numbers.
- Mobile homes: allowed in parks and subdivisions with a building permit; on a permanent foundation one counts as a single-family house in the agricultural, R-1 and R-2 districts. A temporary mobile home needs a special use permit renewed each year by November 15.
- Shipping containers: register any container kept 30 days to a year ($50); over a year it needs a $50 building permit, a level foundation and a neutral paint color within 7 months, and a container used as a dwelling needs plans from an Illinois licensed architect.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and multi-family buildings use the same application. Under the county’s commercial notice, a new commercial building may not be occupied until the owner has hired a qualified inspector and that inspector has filed a certification of inspection with the county; the Zoning Department will not issue a zoning compliance certificate without it. The notice defines a commercial building as anything other than a single-family home, a building with two or fewer dwelling units, or an exempt farm building. Wind farms, commercial solar and battery storage need a special use permit and engineered plans, and each project receives a building permit before construction.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning district and setbacks: in the agricultural district, buildings sit 50 feet from a state or federal highway right-of-way, 80 feet from a county highway centerline and 60 feet from other roads, with side yards of 35 feet for homes and 25 feet for other buildings.
- Floodplain: the application asks for the flood zone and map panel; the July 11, 2024 floodplain ordinance covers development in the floodplain, from buildings to fill and fences, and sets the flood protection elevation at the base flood elevation plus one foot.
- Stormwater: work disturbing more than an acre must attach its notice of coverage under the state construction stormwater permit.
- Entrances: a new access onto a county highway needs a Highway Department access permit.
- Subdivisions: new lots follow the county subdivision ordinance (December 2015).
Marshall County permit fees
Fees are set in section 6.6 of the zoning ordinance and repeated on the building permit application; pay by check to the Marshall County Treasurer. A permit is not issued until every item is complete and the fee is paid.
| Item | Fee |
|---|---|
| Agricultural buildings | No charge |
| Single- or two-family dwelling | $0.10 per sq ft, minimum $150 |
| Dwelling addition or alteration | $0.10 per sq ft, minimum $75 |
| Accessory building (garage, shed, pole barn, container) | $0.05 per sq ft, minimum $50 |
| Commercial, industrial or multi-family | $0.10 per sq ft, minimum $250 |
| Not-for-profit building | $0.10 per sq ft, maximum $250 |
| Solar energy system (when a permit is required) | $0.005 per sq ft, minimum $100 |
| Towers over 35 ft / over 140 ft / over 200 ft | $5 / $10 / $15 per foot |
| Construction started before the permit | Fee increased by 50% |
| Variance, text amendment or appeal | $250 each |
| Special use or map amendment | $50 per acre (minimum $250, maximum $50,000) |
| Wind, commercial solar special use | $5,000 per MW (maximum $125,000) |
| Battery storage special use | $5,000 per MW (maximum $50,000) |
Rather talk it over?
Call 1-855-478-4290 →Worked examples: a 2,000-square-foot house pays 2,000 × $0.10 = $200; a 24-by-25-foot garage (600 square feet) works out to $30, so the $50 minimum applies. If construction begins before the permit, the $200 house fee rises by half to $300. Hearing applicants also pay any court reporter, transcript and expert costs. The ordinance lists separate building permit charges for wind, solar and battery projects, capped at $75,000 for wind and solar.
Trade permits and who may pull them
The county’s zoning pages and forms show no electrical, plumbing or mechanical permits and no contractor registration; its permit covers zoning. The trade rules that do apply come from other bodies:
- Septic and wells: the Marshall County Health Department, part of the Bureau, Putnam and Marshall health partnership, issues septic and well permits under the county sewage ordinance, and its signature is part of the building permit application.
- Plumbing and roofing: plumbers hold state licenses and roofing contractors state licenses, as they do statewide.
- Commercial buildings: the qualified inspector under the state’s non-building-code-jurisdiction rule inspects to the codes the state lists for those areas and files the certificate with the county.
- Occupancy of a house: the ordinance bars living in a dwelling until its plumbing and electricity work to applicable standards, but the Zoning Administrator issues no separate occupancy certificate.
Owners may apply for their own building permits; the application is signed by the owner and, if different, the petitioner.
How to apply for a building permit in Marshall County
Check the county GIS zoning layer or call the town hall; inside a town with its own zoning, the town handles it.
Find the setbacks and lot coverage for the district; a use or setback that does not fit needs a special use or variance hearing first.
For a new home or added bedrooms, take the application to the Marshall County Health Department at 319 6th Street, Lacon, or attach your septic and well permits.
Fill in the 911 address, tax ID, zoning, areas and coverage, the floodplain section and the stormwater section, and sketch the project with every setback.
For a new driveway onto a county highway, file the Highway Department access permit.
File with the Zoning Department and pay by check to the Marshall County Treasurer.
Rather not deal with the Marshall County building department?
Get a free quote →Review, corrections and what causes delay
The Zoning Administrator issues the permit once the application and plans meet the ordinance and any other applicable law. If another agency’s approval is still missing, such as the health sign-off or a floodplain requirement, the permit is denied in writing with the reason. Items the Administrator cannot approve go to the Zoning Board of Appeals, which meets on the third Thursday of the month when needed; a variance needs a published notice at least 15 days before the hearing and certified letters to adjoining owners at least 15 days ahead. Appeals of the Administrator’s decisions must be filed within 35 days.
Inspections in Marshall County
Because the county enforces no building code, it does not inspect framing, wiring or plumbing in houses. What gets checked:
- Zoning compliance: the Zoning Administrator enforces setbacks and the permit terms; violations carry fines of $50 to $500, each week counting as a separate offense.
- Septic systems and wells: the Health Department’s own permits and inspections.
- New commercial buildings: a qualified inspector hired by the owner inspects and files the certificate; without it the building may not be occupied and no zoning compliance certificate is issued.
- Entrances: the Highway Department installs the entrance pipe itself and bills the owner for the pipe and fill.
The Zoning Committee reviews pending violations at its meetings every two months.
Building codes in Marshall County
Marshall County describes itself on its permit application as a non-building-code jurisdiction: it adopts zoning, subdivision and floodplain rules but no building code, and the owner is responsible for code compliance before occupancy. For new commercial buildings, the county applies the state’s qualified-inspector certificate rule. FEMA lists unincorporated Marshall County (community 170994) as participating in the National Flood Insurance Program, with a current map dated November 4, 2010; the county floodplain ordinance refers to a countywide flood insurance rate map dated February 4, 2011.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Marshall County permit FAQs
How much is a building permit for a new house in Marshall County?
$0.10 per square foot with a $150 minimum, so a 2,000-square-foot house pays $200. Starting before the permit adds 50%.
Do farm buildings need a permit?
In agricultural districts, farm buildings need only a written notice to the Zoning Administrator showing setbacks, and there is no fee; they must still meet the district setbacks.
Does the county inspect my new house?
No. The county enforces no building code; its permit covers zoning, and the Health Department inspects septic and well work.
Do I need a permit for a shipping container?
Register it ($50) if it stays 30 days to a year; after a year it needs a $50 building permit. Containers in industrial districts are exempt.
Who issues septic permits?
The Marshall County Health Department in Lacon, (309) 246-8074; its sign-off is required before a new-home building permit is issued.
How do I get a driveway onto a county highway?
File an access permit with the Highway Department; the county installs the entrance pipe and bills you for the pipe and fill.
How long is a permit good for?
Work must start within 6 months, and the permit expires 18 months after issue unless extended.
Marshall County permit records and official resources
The Zoning Administrator keeps the plat and site plan filed with each permit as a public record. Ask the Zoning Department for permit copies, or send a written Freedom of Information Act request to the county; meeting agendas and minutes are posted on the county site.
Inspections are where schedules slip.
Get a free quote →- Marshall County Zoning Department
- Application for building permit (September 2025)
- Zoning ordinance (amended May 14, 2026)
- Floodplain ordinance (July 11, 2024)
- Subdivision ordinance (December 2015)
- Commercial building certification notice
- Shipping container fact sheet
- Mobile home fact sheet
- Application for variance
- Application for special use permit
- Application for amendment
- Highway Department permits
- County highway access permit
- Right-of-way and utility permit
- Marshall County Health Department contact
- Sewage program and county sewage ordinance
- FEMA Community Status Book, Illinois
Simplify Marshall County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Marshall County sooner?
Let Alliance prepare, file, and track your Marshall County permits while your crew stays on the job.
More Illinois permitting guides
Woodford County
Read guide →LaSalle County
Read guide →Peoria County
Read guide →Mason County Building Permit Guide
Read guide →Massac County Building Permit Guide
Read guide →Matteson Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Marshall County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.