Inside the Village of Matteson, building permits come from the Building Services Division of the Community Development Department at 4900 Village Commons (708-481-8313, Monday to Friday 8:00 a.m. to 4:00 p.m.). Permits, contractor registration, fire sprinkler and alarm permits, sign permits and inspection requests are all filed in the village’s CitizenServe portal, where applicants upload plans and pay. Every contractor and subcontractor working in the village must be registered, and new one- and two-family homes and townhouses must be built with an NFPA 13D fire sprinkler system.
What requires a building permit in Matteson?
Matteson’s rule is broad: Building Services says a permit is needed for all new construction and home improvements, demolition included, so that plans can be reviewed and the work inspected. The division asks owners to check with it before starting any project, and work done without a permit draws a fine. The village publishes separate tip sheets for common home projects.
Home projects with village tip sheets
- Decks, fences and storage sheds
- Asphalt and concrete driveways
- Swimming pools
- Central air conditioning
- Basement remodels
- Room additions and attached garages
- Residential electrical service upgrades
- Brick or masonry mailboxes
Other work the village permits
- New houses, which also need a fire sprinkler system
- Commercial build-outs and changes of use
- Signs, outdoor dining and site plans
- Fire sprinkler, fire alarm and hood suppression systems
- Temporary above-ground fuel tanks on construction sites
- Demolition of any building
A plat of survey supplied by the village costs $25. Applications left incomplete for more than 90 calendar days without a response from the applicant are discarded; staff first try to reach the applicant through the contact details on file to return the documents.
What Matteson decides and what the state holds
Matteson is a home-rule village governed by a Village President and Board of Trustees, so it adopts its own building codes and amendments, sets its own fees, registers contractors and runs its own zoning, floodplain and stormwater rules. The Building Services page lists the 2024 International Residential, Building, Existing Building, Mechanical, Fuel Gas, Fire and Swimming Pool and Spa codes with local amendments, the 2023 National Electrical Code with local amendments and the 2024 International Energy Conservation Code with Illinois amendments. Two items on that list are state codes: the Illinois Plumbing Code (2014 edition) and the 2018 Illinois Accessibility Code. The list is still headed “As of December 1, 2021” even though it names 2024 editions, so for an older permit ask Building Services which edition applied.
Matteson building department: who handles permitting
Building Services issues permits and performs the construction inspections, and it also licenses contractors and enforces the property maintenance code. That second role means Building Services inspects homes and businesses when the use, owner or tenant changes and inspects multi-family buildings with four or more units every year. Fire sprinkler and fire alarm plans go through the same portal but are reviewed and tested by the Matteson Fire Department, whose Fire Prevention Bureau reports to the Fire Chief. Site engineering is handled for the village by an outside engineering consultant.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building Services | 4900 Village Commons, Matteson, IL 60443; 708-481-8313; fax 708-694-5699 |
| Hours | Building Department Monday to Friday 8:00 a.m. to 4:00 p.m.; Village Hall until 4:30 p.m. (708-283-4900) |
| Online filing | CitizenServe: permits, contractor registration, inspections, existing structure inspections, special use, PUD and site plan applications |
| Department head | Ernest Roberts III, Community Development Director |
| Fire Prevention Bureau | 708-748-5129; firebureau@villageofmatteson.org |
| Outside the village | Unincorporated Cook County: Cook County Department of Building and Zoning, 69 West Washington Street, Chicago, 312-603-0500 |
Only addresses inside the corporate limits file with Matteson; the village posts an interactive zoning map and a boundary and subdivision map.
Matteson permit types
CitizenServe replaced paper filing for contractor licenses and registration, building permits, sign permits, fire sprinkler and fire alarm permits, inspection requests and the planning applications (special use permits, planned unit developments, outdoor dining and site plans). Applicants register an account, pick the permit type, upload documents and pay inside the portal.
Residential permits
- New houses and townhouses need building plans and, under the village’s fire rules, an automatic sprinkler system designed to NFPA 13D; the Fire Department reviews the sprinkler plans and runs the acceptance test. Building Services also posts an electric-vehicle-ready guide for new single-family homes.
- Additions, attached garages and basement remodels each have their own village tip sheet listing what to submit.
- Decks, fences, sheds, pools and driveways are permitted separately, again with tip sheets.
- Mechanical and electrical upgrades such as central air conditioning and a residential service upgrade are permitted jobs.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial build-outs and changes of use follow their own Building Services checklist, and any new tenant or change of use triggers an Existing Structure Inspection by Building Services and the Fire Department before an occupancy certificate is issued. Sprinkler systems in other buildings follow NFPA 13 (NFPA 13R for residential buildings up to four stories), with tamper switches on control valves, a protected post or wall indicator valve, separate valves and flow switches for each floor or tenant, and a street-visible strobe tied to the flow switches. The fire department connection must sit near the main entrance, 40 to 100 feet from a hydrant, as a 5-inch Storz fitting with a 30-degree elbow and a Knox locking cap. Buildings of three or more stories need standpipes. Existing buildings must add sprinklers on a change of occupancy classification or when alterations or damage exceed half the structure’s value. A contractor storing fuel on site during excavation needs a $150 temporary fuel storage permit, valid for one year, after the Fire Department approves the tank location.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning and site plans. The Planning Division interprets the zoning ordinance and handles rezoning, annexations, variances, site plans and subdivision plans. The Planning & Zoning Commission meets at 7 p.m. on the first and third Thursday of each month at Village Hall.
- Site development permit. Chapter 164, the Floodplain and Stormwater Management Code (Ordinance 1471, adopted July 1, 1991 and amended October 16, 2000), requires site development permits and sets detention, erosion control and floodplain rules, including a fee in lieu of detention. The Engineering Division reviews these plans.
- Other agencies. Engineering also checks the permits a developer must get from IDOT, the Cook County Highway Department, the Metropolitan Water Reclamation District (MWRD), the Illinois EPA, the U.S. Army Corps of Engineers, IDNR and FEMA. MWRD’s Watershed Management Ordinance calls for a permit when development disturbs more than half an acre (with some exemptions), and a short-form permit for a single-family home on a parcel that contains regulatory floodway or lies within 100 feet of a Zone A or AE floodplain.
- School and park contributions. The engineering documents include the village’s land-cash ordinance for schools and parks, which new residential development should check early.
Matteson permit costs and fees
Building permit fees come from the village’s own fee documents: the Building Services document center posts the village Fee Schedule, the amended Building and Fire Fee Ordinance 4502 with its exhibits and the Fire Fee Schedule, and the Engineering Division posts its Engineering Review Fee Ordinance. Charges the village states on its web pages are below.
| Item | Fee |
|---|---|
| Plat of survey from the village | $25 |
| Temporary above-ground fuel storage permit (one year) | $150 |
| Rental property registration, single-family | $200 per property |
| Rental property registration, multi-family | $300 for 2–4 units; $400 for 5–12; $600 for 13 or more |
| Rental unit inspection | $75 per unit; $125 with a sprinkler system |
| Fire sprinkler and fire alarm review, tests and re-tests | Fire Fee Schedule; all costs borne by the applicant |
| Building permit and plan review | Amounts are in the village Fee Schedule and Ordinance 4502, not on its web pages; ask Building Services |
Rather talk it over?
Call 1-855-478-4290 →For a fire sprinkler permit, the fee covers the underground flush test, the rough piping inspection, the hydrostatic test and the final acceptance test; a fire alarm permit covers a rough wiring inspection and the final test. Plans sent to an outside reviewer are also at the applicant’s cost. A failed fire test adds a re-test fee, and building work started without a permit is fined. Rental registration is renewed every calendar year, and unit inspection fees are due before each yearly inspection.
Trade permits and who may pull them
Matteson registers every contractor and subcontractor who works in the village, and the registration must be renewed each year; registration is filed in CitizenServe under contractor license and registration, with the requirements in the village’s Contractors License Requirements sheet. Electrical, mechanical and plumbing work is permitted under the village’s adopted codes as part of the building permit application.
- Plumbing: the Illinois Plumbing Code applies, and plumbing must be done by a plumber licensed by the Illinois Department of Public Health. Building Services points to a provision of the State of Illinois Plumbing Licensing Act that requires a letter of intent from the person or company doing the plumbing with every building permit application, and posts an example letter.
- Electrical: work follows the 2023 National Electrical Code as amended by the village, and the electrician, like every contractor, must be registered with the village.
- Roofing: roofing contractors are licensed by the Illinois Department of Financial and Professional Regulation; a roof job is still a village permit.
- Fire protection: sprinkler plans need calculations and device data sheets; fire alarm plans need device data sheets and standby battery calculations, and the alarm contractor must hold a state license under the Illinois Private Detective, Private Alarm and Private Security Act and include a copy with the plans.
- Existing systems: inspection companies report sprinkler, alarm, hood and other system tests through The Compliance Engine, and a company that needs locked connection caps removed calls the Fire Department 48 hours ahead.
Rather not deal with the building department?
Get a free quote →How to apply for a Matteson building permit
Use the village zoning and boundary maps; unincorporated parcels go to Cook County Building and Zoning.
Create an account and, for contractors, complete the yearly contractor registration.
Ask the Planning Division whether the project needs a variance, site plan or special use, and Engineering whether a site development permit applies.
Plans, plat of survey, the matching tip sheet’s items, the plumber’s letter of intent and, for sprinklers or alarms, the fire submittal.
Upload everything to the permit request and respond to reviewer comments in the portal.
Pay the fees in the portal and keep the approved plans on site for every inspection.
Review, corrections and what causes delay
Fire sprinkler and fire alarm plans are usually returned with written comments within 10 to 14 working days, and the approved set comes back as one digital stamped copy that must be printed for the inspector. A missing plumbing letter of intent or an unregistered contractor holds the building permit. A file that sits incomplete for 90 calendar days is discarded, so answer review comments promptly.
Inspections and certificates in Matteson
Request every inspection at least 48 hours before it is needed, through CitizenServe or by calling Building Services. Fire sprinkler jobs have a rough piping inspection and a final acceptance test, kitchen hood systems a trip test and a final test, and every installer must be present for acceptance testing. A fire alarm contractor gives the Fire Department a certificate of completion before the witnessed test. The Fire Department will not release an occupancy permit until the required sprinkler and alarm systems pass.
Existing Structure Inspections (ESI) are made jointly by Building Services and the Fire Department whenever a house, building or tenant space changes use, owner or tenant; occupancy certificates, and permits for the new owner’s remodeling, are issued after it. A seller must apply for the ESI. If it fails, the seller either fixes every violation and calls for a re-inspection before closing, or gives the buyer the list of violations and the buyer signs an as-is affidavit taking them on. Rental units get a certificate of occupancy after a yearly inspection, and each change of tenant needs a new certificate. Vacant and foreclosed properties must be registered and renewed every six months.
Illinois building code in Matteson
Matteson enforces the codes it has adopted by ordinance, with local amendments, through Building Services and the Fire Prevention Bureau, and keeps its own floodplain and stormwater code in Chapter 164. FEMA’s Community Status Book lists the Village of Matteson (community 170123) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008. For development that needs an MWRD permit, the Watershed Management Ordinance sets a flood protection elevation 2 feet above the base flood elevation.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Matteson building permit FAQs
Do I need a permit for a fence, deck or shed in Matteson?
Yes. The village requires permits for all home improvements and publishes a separate tip sheet for each of these projects.
How do I apply for a building permit in Matteson?
Register at the village’s CitizenServe portal, choose the permit, upload plans and documents, answer review comments and pay online.
Does a new house in Matteson need fire sprinklers?
Yes. New one- and two-family homes and townhouses must have an NFPA 13D sprinkler system, reviewed and tested by the Fire Department.
Do contractors have to register with the village?
Yes. Every contractor and subcontractor working in Matteson must be registered, and registrations are renewed every year.
What is required when I sell a house in Matteson?
The seller applies for an Existing Structure Inspection. Violations are either corrected before closing or disclosed to a buyer who signs an as-is affidavit.
How much notice do inspections need?
Request them at least 48 hours ahead through CitizenServe or by calling Building Services at 708-481-8313.
How much does it cost to register a rental?
$200 a year for a single-family rental and $300 to $600 for multi-family buildings by size, plus $75 per unit inspection ($125 with sprinklers).
When does the Planning & Zoning Commission meet?
At 7 p.m. on the first and third Thursday of each month at Village Hall, 4900 Village Commons.
Matteson permit search and official resources
Applicants follow their own permits, licenses and inspection results through their CitizenServe account. For older permit files, plans or inspection records, send a written Freedom of Information Act request to the village’s Chief FOIA Officer at FOIA@villageofmatteson.org or use the online FOIA form; the first 50 black-and-white pages are free and each extra page is 25 cents. Approved board minutes, the code of ordinances, the zoning ordinance and zoning map are available without a request.
Inspections are where schedules slip.
Get a free quote →- Matteson Building Services: portal, codes and documents
- Planning Division and zoning documents
- Planning & Zoning Commission
- Engineering Division
- Floodplain and Stormwater Management Code, Chapter 164
- Fire Prevention Bureau: sprinkler and alarm plan review
- Code Enforcement: existing structure inspections and rental registration
- Freedom of Information Act requests
- Village Clerk business licenses and permits
- Cook County Department of Building and Zoning (unincorporated areas)
- MWRD Watershed Management Ordinance FAQs
- FEMA Community Status Book, Illinois
Simplify Matteson permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Matteson sooner?
Let Alliance prepare, file, and track your Matteson permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Maywood
Read guide →Melrose Park
Read guide →Mattoon Building Permit Guide
Read guide →McHenry County Building Permit Guide
Read guide →McLean County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Matteson permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.