McDonough County’s website lists no building, zoning or planning department, and its pages describe no county building permit for unincorporated land. The approvals the county publishes for a rural building site come from the McDonough County Health Department (309-837-9951, ext. 2000): it reviews private sewage plans, evaluates the site and inspects new or renovated systems, and it reviews plans and visits the site before issuing a permit for a new water well. Inside Macomb, the city’s Office of Community Development at 232 E. Jackson Street issues building and trade permits.
What requires a permit in unincorporated McDonough County?
The county’s office list covers the Assessor, County Board, County Clerk, Health Department, Highway Department, ESDA, Sheriff, Treasurer and other offices, with no building, zoning or planning department. The permits its offices publish are health permits:
Health Department permits
- Private sewage disposal systems, new or renovated: plan review, site evaluation and inspection
- New water wells: plan review and site evaluation before the permit is issued
- Sealing abandoned wells: plan review and inspection during sealing
Other county reviews
- Subdivision plats: Health Department review of sewage and water supply at the request of the McDonough County Plat Officer
- Wastewater haulers and portable sanitation businesses: Health Department inspections
- Highway Department permits for new private or field entrances, oversize and overweight vehicles, and right-of-way construction
A private sewage system, in the department’s definition, is any system serving fewer than 15 people (or the population equivalent) that discharges to the ground surface, or any system receiving domestic sewage that has no ground surface discharge. Before building a house, barn or commercial building in the countryside, ask the County Clerk’s office at the courthouse (open weekdays 8:00 a.m. to 4:00 p.m.) whether any other county approval applies, since the county’s pages do not address building permits.
What the county decides and what the state holds
Well permits fall under the McDonough County Water Well Permit and Water Supply Ordinance posted by the Health Department, and the county handles subdivision plats through its Plat Officer. Well sealing must meet the Illinois Water Well Construction Code, and sewage systems are judged against the state’s private sewage licensing act and code. No county building code appears among the county’s posted documents.
McDonough County building department: who handles permitting
No county office publishes building permits for rural land. The offices that matter for a rural project are:
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| McDonough County Health Department, Environmental Health (septic, wells, plat reviews) | 505 E. Jackson Street, Macomb, IL 61455; 309-837-9951 (sewage questions ext. 2000); fax 309-837-1100; mchd@mchdept.com |
| McDonough County Highway Department (entrances, oversize and overweight loads, utility and right-of-way work) | 204 S. Western Avenue, Macomb, IL 61455; 309-833-4196; Monday to Friday 8:00 a.m. to 4:00 p.m. |
| Supervisor of Assessments (GIS, property search) | #1 Courthouse Square, Macomb, IL 61455; 309-833-5305 |
| County Clerk and Recorder (deeds, plats, subdivision code) | #1 Courthouse Square, Macomb; 309-833-2474; Monday to Friday 8:00 a.m. to 4:00 p.m. |
| City of Macomb, Office of Community Development (inside Macomb) | 232 E. Jackson Street, Macomb; 309-833-4944 |
Cities and villages in McDonough County
The county lists ten cities and villages: Macomb (population 14,530), Bushnell (2,600), Colchester (1,070), Blandinsville (544), Prairie City (392), Industry (383), Good Hope (349), Bardolph (203), Tennessee (98) and Sciota (32); the Census also counts three residents of Plymouth in the county. Each governs building inside its own limits. Macomb issues permits for work on any structure, plumbing, electrical, HVAC, demolition and work in the public right-of-way through its Office of Community Development, which also staffs the city’s Planning Commission, Board of Zoning Appeals and Historic Preservation Commission; see the Macomb building permit guide. For the smaller towns, ask the city or village hall. Townships do not issue building permits.
McDonough County permit types
The Health Department’s permits are the ones to plan around on rural land. It provides information on the procedure to install or renovate a private sewage system and posts the installation application.
Residential permits
- Septic system for a new home: file the Private Sewage Disposal Plan Application; the department reviews the plan, evaluates the site and inspects the installation.
- Renovating an existing system: the same plan review, site evaluation and inspection apply to renovated systems.
- New well: the department reviews the plan and evaluates the site before it issues the well construction permit.
- Old wells: a plan to seal an abandoned well is reviewed against the Illinois Water Well Construction Code, and staff inspect the sealing.
- Water testing: test kits for private water supplies are available at the Health Department; samples are screened for coliform bacteria and nitrate/nitrite.
- Geothermal: closed loop (heat pump) wells fall under the same county ordinance and need a Closed Loop Well permit from the department.
- Driveway onto a county highway: the field entrance request form gives the county highway number and 911 address, with the spot marked on a map and staked on site. County policy is that the owner buys the first culvert from the Highway Department, which sets its size and length, installs it once payment is received and maintains it within the right-of-way.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Wastewater haulers and portable sanitation businesses working in McDonough County are inspected by the Health Department. A rural business on its own sewage system needs the same Health Department plan review when the system falls within the department’s definition of private sewage disposal. A business water system that serves at least 15 connections used by nonresidents, or 25 or more nonresidents a day for at least 60 days a year, is a non-community public water supply and needs the department’s Non-community Registration Permit, with surveys every two years. Haulers moving oversize or overweight loads on county roads get Highway Department permits. For a rural commercial building, no county plan review or inspection is described, so raise the project with the county offices before you break ground. Inside Macomb, commercial and institutional work goes through the city’s Office of Community Development.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before construction
- Town limits: a lot in Macomb, Bushnell, Colchester or another town is that town’s to permit.
- Dividing land: a plat to be subdivided is reviewed by the Health Department at the Plat Officer’s request, to check that a septic system can be built and a water supply is feasible.
- Septic and well approvals: the sewage plan and the well permit come before the system or well is built.
- Floodplain: the unincorporated county is in the National Flood Insurance Program’s emergency phase, mapped only on a 1981 flood hazard boundary map, so ask the county about flood zones before building near a stream.
McDonough County permit fees
The county’s pages publish no building permit fee, since they describe no county building permit. The Health Department prints these charges on its own documents:
| Item | Fee |
|---|---|
| Private sewage system application (install or renovate) | $100, filed with the soil results and plans |
| Real estate request: sewage check, well inspection and water sample | $510 |
| Sewage check only | $150 |
| Well inspection and water sample | $360 |
| Water sample only / each additional sample | $210 / $130 |
| Make-up visit for a sewage or water check | $50 |
| Water well, closed loop well and water supply permits and inspections | Set in the department’s fee schedule approved by the Board of Health (amounts not posted) |
Rather talk it over?
Call 1-855-478-4290 →The $100 sewage fee is from the department’s posted installation procedure; the real estate charges are from its 2025 Sewage and Well Inspection Request Form, which says payment is due before the inspection. For a vacant house with a septic system, the water must be run long enough to simulate a normal day’s use for the size of the home before a sewage check. Inside Macomb, permit fees follow the city’s own fee schedule, described in the Macomb guide.
Worked example. The full real estate package on a rural home (sewage check, well inspection and water sample) is $510; adding one more water sample at $130 brings it to $640.
Trade permits and who may pull them
The county lists no electrical, plumbing or mechanical permits and no county contractor registration for rural land. The trade rules a rural owner meets are state rules and the Health Department’s:
- Septic systems: installations are reviewed against the state private sewage licensing act and code; the department checks whether a system complies when a plat is reviewed.
- Wells and sealing: new well construction needs the department’s permit, and sealing an abandoned well needs its review of the sealing form.
- State-licensed trades: McDonough County jobs follow the Illinois Plumbing Code with an IDPH-licensed plumber, and roofs are put on by contractors holding the state roofing license.
- Well drillers and pump installers: the county ordinance requires everyone who builds wells or installs well pumps to hold an IDPH license under the Water Well and Pump Installation Contractor’s License Act; violations of the ordinance carry fines of $100 to $750, each day counting as a separate offense.
Inside Macomb, the Office of Community Development handles contractor registrations; for the other towns, ask the city or village hall.
How to get septic and well permits in McDonough County
Make sure it lies outside Macomb and the other nine towns; the Supervisor of Assessments links a GIS website and online property search.
Give the Health Department soil investigation or percolation results and the separation from the trench bottom to any limiting layer.
A scaled plan with lot size, system type and location, lateral lengths, backfill, distances to wells, water lines and buildings, elevations, slope and any sanitary sewer within 200 feet.
Where the code cannot be met, submit a written proposal with soil, water table, drainage and well-distance data; it must be approved before construction.
Return the plan application with the $100 fee; for a new well, apply for the water well construction permit.
Give at least 48 hours’ notice before work starts; the system is inspected before it is covered.
Rather not deal with the McDonough County building department?
Get a free quote →Review, corrections and what causes delay
Plan approval must come before a new or renovated system is built, and the department helps set the minimum system requirements from the soil results, so the soil data has to come in first. A variance is decided in writing and must be approved before construction begins. A well permit is valid for 12 months; if construction has not started by then it is void, so ask the department for an extension if the job will be delayed. A land division also needs the Health Department’s sewage and water review, requested by the Plat Officer.
Inspections in McDonough County
The Health Department inspects new and renovated private sewage systems before they are covered and the sealing of abandoned wells while it is done, and it investigates complaints about wastewater and sewage anywhere in the county. Under the Water Well Permit and Water Supply Ordinance, every new or modified well is disinfected with a chlorine solution of at least 100 parts per million, and after the chlorine is purged a certified laboratory must test a water sample with satisfactory results before the water is used for drinking or cooking; a copy of the analysis is filed with the department. The contractor records the location of the well and its supply lines on the application when the work is done.
For a real estate transaction, the department inspects the private sewage system and the private well at a rural property and collects water samples, on request from a buyer, seller, lender or realtor and with the owner’s consent. Outside the towns, nothing on the county site describes inspections of the house or barn itself.
Illinois building code in McDonough County
McDonough County has posted no building code of its own. Its health rules for water come from the Closed Loop Well and Water Well Permit and Water Supply Ordinance, effective after April 15, 2015, which adopts by reference the Illinois Water Well Construction Code, Water Well Pump Installation Code, Drinking Water Systems Code and Illinois Plumbing Code, among others; wells for community public water supplies and monitoring wells are exempt from its permit. FEMA’s Community Status Book lists McDonough County (community 170999, unincorporated areas) in the National Flood Insurance Program’s emergency phase since June 17, 1997, with a flood hazard boundary map dated January 2, 1981 and no flood insurance rate map; the City of Macomb participates separately with no special flood hazard area mapped.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Permit search and official resources
The county offers no online permit search. Septic and well files for rural properties are held by the Health Department (309-837-9951). Recorded deeds and plats are with the County Clerk and Recorder, whose online property search covers documents recorded from 2000 to the current year; older documents are not online. The Supervisor of Assessments links the county’s GIS website and online property search.
- McDonough County government
- Supervisor of Assessments (GIS and property search links)
- County Clerk and Recorder
- McDonough County Highway Department
- Field entrance request form
- Private sewage disposal, McDonough County Health Department
- Procedures to install or renovate a private sewage system
- Potable water and wells, McDonough County Health Department
- Water Well Permit and Water Supply Ordinance
- Sewage and well inspection request form
- Health Department contact
- City of Macomb Office of Community Development
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →McDonough County permit FAQs
Does McDonough County issue building permits?
No building, zoning or planning office appears among the county offices, and the Assessor, Clerk and Highway pages describe no county building permit or improvement notice; check with the courthouse offices before you build.
How much is a septic permit in rural McDonough County?
The Health Department’s installation procedure lists a $100 application fee, paid with the soil results and system plans.
Do I need a permit to drill a well?
Yes. The ordinance makes it unlawful to build or deepen a potable well without a Health Department construction permit; the permit is valid for 12 months.
What does a septic and well inspection for a home sale cost?
$510 for the sewage check, well inspection and water sample together, $150 for the sewage check alone and $360 for the well and sample; payment is due before the visit.
Who approves a new driveway onto a county highway?
The County Highway Department, on its field entrance request form. The owner buys the first culvert from the department, which sets its size and installs it.
Who issues building permits in Macomb?
The city’s Office of Community Development, 232 E. Jackson Street (309-833-4944).
What happens when land is subdivided?
At the Plat Officer’s request, the Health Department checks each plat for whether a septic system can be built and a water supply is feasible.
Simplify McDonough County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in McDonough County sooner?
Let Alliance prepare, file, and track your McDonough County permits while your crew stays on the job.
More Illinois permitting guides
Macomb
Read guide →Hancock County
Read guide →Fulton County
Read guide →McHenry Building Permit Guide
Read guide →McHenry County Building Permit Guide
Read guide →McLean County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about McDonough County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.