Fulton County, Illinois Building Permit Guide

To get a building permit in Fulton County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Fulton County Zoning Office in Lewistown issues zoning permits, the county’s replacement for a building permit, and floodplain permits for unincorporated land; Canton, Lewistown and nine other towns zone for themselves.

Authority: Fulton County Zoning OfficePermit: Zoning permit (no county building code)Phone: 309-547-0902
New house
$125 + $0.25/sq ftR-1, R-2 and AC districts
Accessory building
$0.15/sq ft$100 minimum; 100 sq ft or less free
Variance or rezoning
$600Zoning Board of Appeals
Data center moratorium
To March 9, 2027Extended September 8, 2026

In unincorporated Fulton County, the permit that used to be called a building permit is now a zoning permit, issued by the Fulton County Zoning Office at 257 W. Lincoln St., Lewistown (309-547-0902, weekdays 8 a.m. to 4 p.m.). The office enforces the zoning and floodplain ordinances but, in its own words, does not interpret or enforce building codes. A new house in the residential or agricultural districts costs $125 plus 25 cents a square foot, septic and well permits from the county health department in Canton come first, and a certificate of occupancy follows. Canton, Lewistown and nine other towns with their own zoning handle permits inside their limits.

What requires a permit in unincorporated Fulton County?

The county’s zoning permit application covers the erection, reconstruction or structural alteration and use of buildings, and its fee schedule shows what that means in practice:

Zoning permit

  • New dwellings, manufactured homes and mobile homes
  • Additions and basements
  • Accessory buildings over 100 square feet
  • Above-ground and in-ground pools
  • Business and industrial buildings
  • Signs, towers and personal-use solar systems
  • Demolitions

No fee

  • Accessory structures of 100 square feet or less
  • Accessory structures used mainly for agriculture in the Agricultural Conservation (AC) district

Separate approvals sit alongside: a floodplain development permit for any development in the floodplain, from the same officer acting as floodplain administrator; conditional use permits, variances and rezonings from the Zoning Board of Appeals, after which a zoning permit is still needed; and construction permits for commercial solar facilities, commercial wind systems and Tier 2 battery storage, which the board itself grants.

⚠️ Data center moratorium. On September 8, 2026 the county board extended its temporary moratorium on accepting special use permit and building permit applications for data centers and commercial crypto mining operations, first approved in March 2026, to 11:59 p.m. on March 9, 2027, unless the board ends it earlier or extends it again. Applications already filed are not affected.

What the county decides and what the state holds

The county board adopts the zoning ordinance, the floodplain ordinance and the energy siting ordinances (all signed versions posted in August 2026), and appoints the seven-member Zoning Board of Appeals for five-year terms. The zoning office does not enforce building codes, so structural standards for new homes and commercial buildings come from the state minimums in the code section below; septic and wells follow the state codes as administered by the health department, and plumbing and roofing licenses are state licenses.

Short on time to read all of this?

Get a free quote →

Fulton County building department: who handles permitting

Kimberly J. Mayberry is the Fulton County Zoning Enforcement Officer. She issues zoning permits and floodplain development permits, acts as the county’s floodplain administrator, and serves as clerk of the Zoning Board of Appeals, scheduling its hearings and publishing notices; the Supervisor of Assessments provides administrative oversight.

Fulton County permit offices
OfficeRoleContact
Zoning OfficeZoning permits, floodplain permits, certificates of occupancy, ZBA filings257 W. Lincoln St., Lewistown, IL 61542; 309-547-0902; zoning@fultonco.org; Monday to Friday 8 a.m. to 4 p.m.
Fulton County Health Department, Environmental Health DivisionSeptic and well permits, inspections, subdivision plat review700 E. Oak St., Canton, IL 61520; 309-647-1134 (ext. 230 for environmental health), fax 309-647-9545
Fulton County 911 OfficeAddresses for new building sites309-547-3911
CourthouseCounty offices100 N. Main St., Lewistown; 309-547-3041; weekdays 8 a.m. to 4 p.m.

Cities and villages in Fulton County

The county lists 11 communities with their own zoning; inside their limits you go to the city or village hall for permits and zoning:

  • Canton (13,297 people): Planning & Zoning Department at City Hall, 2 N. Main St. (309-649-5338); see our Canton building permit guide.
  • Farmington (2,298 in Fulton County), Lewistown (1,962), Cuba (1,131), Astoria (882), Avon (668 in this county), St. David (505), Ipava (418), Fairview (410), Table Grove (329) and Dunfermline (252) also zone for themselves; the county’s communities-with-zoning page gives a phone number for each town hall.
  • Vermont (557), London Mills (338 in this county), Smithfield (181), Bryant (168), Norris (168), Banner (166), Marietta (97), Liverpool (89) and Ellisville (85) are not on the county’s list of communities with zoning; ask the Zoning Office which rules apply before building there.

Fulton County permit types

The county uses one zoning/construction permit application, with addenda for personal solar, commercial solar, energy storage and wind systems, plus a floodplain development permit application and a petition for zoning action.

Residential permits

  • Houses: the application asks for the parcel number, zoning district (AC, R-1, R-2, B or I), whether the site is in the floodplain, the septic and well permit numbers, square footage of the dwelling, basement and accessory buildings, the project value and a sketch with lot dimensions, yards, driveways and septic and well locations; attach an aerial map and any survey.
  • Lot and yard rules: AC lots need 43,560 square feet and 150 feet of width, with 50-foot front and rear yards and 20-foot side yards; R-1 and R-2 lots need 5,000 square feet and 50 feet of width, with 25-foot front and rear and 10-foot side yards. In AC, a second dwelling on one lot needs its own acre.
  • Accessory buildings, pools, basements and personal solar each have their own fee line; personal-use solar needs no conditional use permit.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Business-district buildings pay $125 plus 27 cents a square foot, and industrial buildings 0.3% of construction cost. Commercial solar, wind and Tier 2 battery storage projects need a conditional use permit and then a construction permit granted by the Zoning Board of Appeals, under the siting ordinances; the county posts checklists for the solar conditional use and construction permits. Towers and wind systems pay by height. Other conditional uses, home occupations, variances and rezonings start with a petition for zoning action.

What comes before the zoning permit

  • Septic and well permits from the health department, before the zoning permit can be issued and before construction starts.
  • A 911 address, if the parcel has none.
  • Subdivision review: splits that create parcels under five acres served by private sewage or a non-public water supply need a health department plat review with a soil boring for every lot, and plats pay the county’s plat review fee.
  • Floodplain: a county development permit, with the lowest floor at least one foot above the base flood elevation, and for floodway work on a rural stream draining ten square miles or more, an IDNR permit.

Fulton County zoning permit fees

Fees come from the county’s zoning fee schedule, updated September 1, 2024, and can be paid online:

Rather talk it over?

Call 1-855-478-4290 →
Fulton County zoning fee schedule (updated September 1, 2024)
ItemFee
Dwelling or manufactured home (R-1, R-2, AC)$125 plus $0.25 per sq ft
Mobile home$500
Basement (separate from the dwelling fee)$0.15 per sq ft
Accessory structure100 sq ft or less no charge; 101 sq ft or more $0.15 per sq ft, $100 minimum; agricultural use in AC no fee
Swimming pool$75
Business district structures$125 plus $0.27 per sq ft
Industrial district structures0.3% of construction cost
Personal-use solar$150 (5–50 kW) to $3,000 (601–999 kW); $2,000 per MW at 1 MW and above
Towers and wind systems$25 per vertical foot
Demolition$50
Plat review$100 plus $50 per parcel
Conditional use, variance, special home occupation or rezoning$600 each
Commercial solar, wind or Tier 2 battery storage conditional use$5,000 up to 2 MW, plus $1,000 per MW over 2 MW, capped at $250,000
Zoning or floodplain certification letter$20
Permit renewal after one year$15

Worked example: a new 1,800-square-foot house on a slab in the AC district costs $125 + (1,800 × $0.25) = $575; a 1,000-square-foot basement under it would add $150, and a 30-by-40-foot (1,200-square-foot) detached garage another $180. Health department fees for septic and well permits are separate and are not posted online, so call the department for them.

Trade permits and who may pull them

Because the county enforces zoning, not building codes, it issues no electrical, plumbing or mechanical permits on unincorporated land and publishes no county contractor license or registration; the zoning application can be signed by the owner or an authorized agent. The trade rules that apply on rural jobs:

  • Septic and wells: permits and inspections come from the health department’s Environmental Health Division, and unused wells must be either brought back into use or sealed under its supervision.
  • Plumbing: follows the Illinois Plumbing Code, with plumbers licensed by the Illinois Department of Public Health.
  • Roofing: roofing contractors are licensed by the Illinois Department of Financial and Professional Regulation.

Towns can add their own rules; Canton, for example, licenses roofing contractors locally and lists plumbing license numbers on its permit form.

Rather not deal with the Fulton County building department?

Get a free quote →

How to get a Fulton County zoning permit

1. Confirm the parcel and district

Look the parcel up on the county GIS map, check it is outside the 11 zoned towns, and call the Zoning Office for the zoning district.

2. Get septic and well permits

Apply to the Fulton County Health Department in Canton; the permit numbers go on the zoning application.

3. Get a 911 address

Call 309-547-3911 if the site has no address yet.

4. Complete the application

Fill in the zoning/construction permit application with the sketch, aerial map and any survey, and add the floodplain application if the site is in a flood area.

5. Stake the site and pay

Mark the corners of the building with stakes, pins, rebar or paint for the officer’s site visit, and pay the fee in the office or online.

6. Post the permit and build

Keep the permit posted on site until the work is complete, and start within one year.

Review, corrections and what causes delay

The commonest hold-up is order: the zoning permit cannot be issued until the septic and well permits are in hand. Projects needing a conditional use, variance or rezoning wait for a Zoning Board of Appeals hearing, which the zoning officer schedules and advertises. A permit lapses if no work starts within one year; if work has started but is not finished, a $15 renewal extends it another year. Data center and crypto mining applications cannot be accepted until the moratorium ends.

Inspections and certificates

The county makes no building-code inspections. The zoning officer visits the site, so mark the corners before the visit, and when construction is complete you must notify the officer, who inspects the premises and issues or refuses a zoning compliance certificate. A new house or other building that will be occupied needs a certificate of occupancy from the zoning officer before anyone moves in; structures not subject to occupancy receive a certificate of completion. In the floodplain, the officer keeps a record of the as-built elevation of each new building’s lowest floor, which must be at or above the flood protection elevation. The health department inspects septic systems and wells.

Illinois building code in Fulton County

Fulton County’s zoning office states that it does not enforce building codes, so the statutory minimums described below apply to new homes and commercial buildings in the unincorporated county. Its floodplain ordinance sets the flood protection elevation one foot above the base flood. FEMA’s Community Status Book lists unincorporated Fulton County (community 170241) as participating in the National Flood Insurance Program, with current maps dated February 4, 2011.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

Fulton County permit FAQs

Does Fulton County still issue building permits?

Its permit is now called a zoning permit; the zoning office enforces the zoning ordinance, not building codes.

How much is a zoning permit for a new house?

$125 plus 25 cents per square foot in the R-1, R-2 and AC districts; basements add 15 cents per square foot.

Do I need a permit for a shed?

A permit is needed, but structures of 100 square feet or less pay nothing; larger ones pay 15 cents per square foot with a $100 minimum, and farm buildings in the AC district are free.

What must I do before applying?

Get your septic and well permits from the health department and a 911 address, and mark the building corners for the site visit.

Can I move into a new house without a certificate of occupancy?

No. The zoning officer must issue a certificate of occupancy before a new dwelling is occupied.

Who issues permits in Canton or Lewistown?

The city, not the county; both are on the county’s list of communities with their own zoning.

Can I build a data center in Fulton County?

Not for now: the county will not accept special use or building permit applications for data centers or crypto mining until March 9, 2027, unless the board changes that date.

Fulton County permit records and official resources

Zoning permits, certificates and ZBA files are kept by the Zoning Office, which has its own Freedom of Information page; ask the office for a copy of a permit or certificate, or make a written FOIA request. Zoning and floodplain certification letters cost $20, copies 25 cents a page, and printed aerial maps from $6. Septic and well records are with the health department.

Inspections are where schedules slip.

Get a free quote →

Simplify Fulton County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Fulton County sooner?

Let Alliance prepare, file, and track your Fulton County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Fulton County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.