Inside Macomb’s city limits, the Office of Community Development on the second floor of 232 E. Jackson Street ((309) 833-4944) issues permits for work on structures and for plumbing, electrical, HVAC, roofing, demolition and right-of-way work. Applications go in through the city’s online building permit application or on the 2026 paper form. The fee is a $22 base plus 0.55% of the project cost, so a $200,000 house pays $1,122, and the fee doubles when work starts before the permit. Paid contractors must register with the city each year; owners working on their own property do not.
What requires a permit in Macomb?
The city requires a building permit for erecting, altering or repairing a building inside the city limits, and its permits page spells out what that covers in practice:
Permit needed
- New buildings, additions and alterations
- Roofs, decks, windows, bathroom remodels and fences
- Any electrical wiring or connection
- Any plumbing installation, alteration or change
- Installing heating or air conditioning equipment
- Mining, dredging, filling, grading and paving
- Permanent and temporary signs
- Demolishing or moving a building
- Any use of a street, sidewalk or alley right-of-way
No permit
- Painting
- Sealants or protective treatments
- Carpet work and other general maintenance
- Repairs to an existing heating or cooling unit costing less than $100
Properties in the Macomb Enterprise Zone still need permits, but the city charges no building permit fee there; the office asks owners to confirm a property is inside the zone before starting.
What the city decides and what the state holds
The city council adopts Macomb’s codes, permit fees, contractor registration and zoning ordinance, and the Office of Community Development enforces them along with the rental and property maintenance rules. The state sets the plumbing code that the city lists among its adopted codes and licenses plumbers, which is why Macomb registers plumbing contractors free of charge on proof of the state license; it also licenses roofing contractors, and the city asks for that license before it issues roofing permits.
Macomb building department: who handles permitting
All of it runs through the Office of Community Development, led by Community Development Director Julie Leonard. Besides permits, the office handles zoning administration, site plan and subdivision plat approval, contractor registration, rental and code enforcement inspections and historic preservation, and it staffs the Planning Commission, the Zoning Board of Appeals and the Historic Preservation Commission. Public Works and the Business Office sign off on right-of-way work, water and sewer taps and demolitions.
Short on time to read all of this?
Get a free quote →| Item | Details |
|---|---|
| Office | Office of Community Development, 232 E. Jackson St., 2nd floor, Macomb, IL 61455 |
| Phone and email | (309) 833-4944; zoning@cityofmacomb.com |
| City Hall main line | (309) 833-2575 |
| Public Works | (309) 833-2821 (taps, right-of-way inspections, demolition disconnections) |
| Business Office | (309) 833-2031 (water activation, right-of-way permit review) |
| Wastewater Superintendent | (309) 833-4325 (sewer tap inspection) |
| Online filing | City online building permit application (linked from the Community Development page) |
The city’s permits apply only inside Macomb’s corporate limits; for land outside them, ask McDonough County which office handles the parcel.
Macomb permit types
The city’s 2026 building permit application covers five permit types: general building, electrical, HVAC, roofing and plumbing. Fill in only the section that matches your permit; signs use a separate form. The form also asks whether a subcontractor is used and whether that firm is registered or licensed.
Residential permits
- Drawings: for changes to a house, a sketch is enough, and the city will provide an aerial map of the lot to draw on.
- Roofs: the city’s climate table requires ice and water shield, and the roofer must have a copy of the state roofing license on file.
- Electrical: needed for every wiring job, with the electrician’s license number on the form.
- Plumbing: needed for every installation or change; the form asks for fixture count, pipe length and type, and the material of the water service line.
- Heating and air conditioning: furnace or air conditioner type and BTU rating go on the form.
- Ramps: the city publishes handicap ramp specifications.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
New or altered commercial and institutional buildings need full building plans. Fire alarm, sprinkler and hood suppression work uses a separate fire protection system application, with construction documents prepared by a licensed design professional (floor plan, working plans, water supply information and hydraulic calculations), and the Fire Prevention Bureau must have acceptance testing records and a statement of compliance before an occupancy permit is granted. Premises with a fire alarm need a Knox Box.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: the city publishes use and bulk matrices; a special use or a change of zoning costs $100 each and takes about 60 days because both the Planning Commission and the City Council hear it.
- Site plan review: required for larger projects (a special use for commercial development over 10,000 square feet or housing with three or more units needs one); file a hard copy and a PDF.
- Variances and appeals: petition the Zoning Board of Appeals ($100) when a building permit or certificate of occupancy is refused.
- Excavation for development: any excavation or drilling for development needs a permit, even on private land.
- Water and sewer: a licensed plumber gets a plumbing number and the water/sewer service form before any tap is made.
- Historic properties: the Historic Preservation Commission handles landmark designation and certificates of appropriateness.
Not sure this scope needs a permit?
Get a free quote →Macomb building permit fees
The office’s permit fee schedule (posted December 2025) sets the building permit fee at a $22 base plus 0.55% of the project cost; for the part of a project over $2,000,000 the rate drops to 0.3%. The printed table is a guide, and the office calculates each fee from the formula. Payment is by cash, check or card, with a processing fee on card payments.
| Item | Fee |
|---|---|
| Project up to $999 | $22 |
| $10,000 project | $77 |
| $50,000 project | $297 |
| $100,000 project | $572 |
| $1,000,000 project | $5,522 |
| Permit pulled after work started | Double the fee |
| Enterprise Zone property | No building permit fee |
| Demolition or moving permit | $10 ($500 fine for demolition before approval) |
| Street cut / excavation in right-of-way | $100 plus $5,000 bond (unless a registered franchise) |
| Curb, gutter, sidewalk, driveway or alley excavation | $50 plus $1,000 bond |
| Heavy haul, street closure, driveway repair, temporary driveway, other right-of-way use | $25 each |
| Water tap, 3/4 to 1 3/4 inch / 2 inch and up | $250 / $500, plus $40 per inspection |
| Sewer access | $196.35, plus $28.05 per inspection |
| Site plan review | $250 minimum |
| Special use / change of zoning / ZBA petition | $100 each |
Worked example: a $200,000 new house pays $22 + (0.55% × $200,000) = $1,122, which matches the city’s table; a $15,000 roof replacement pays $104.50. Site plans that need public improvements also reimburse the city 3.5% of their estimated cost for inspection and engineering; plans without them pay half of any outside engineering review, up to $1,000. Two city sources differ on the excavation for development permit: the permits page lists $25 and the application form $75, so ask which applies when you file. Permanent signs are charged on the building fee scale; temporary signs are free.
Rather talk it over?
Call 1-855-478-4290 →Trade permits and who may pull them
Anyone paid to build, remodel, repair, alter, remove or demolish buildings in Macomb, or to do electrical, plumbing, heating and cooling or tree trimming work, must register with the Office of Community Development and renew every year. Each registration needs a certificate of liability insurance ($50,000 property damage, $100,000 injury to one person and $300,000 to more than one, or $300,000 combined per occurrence and aggregate) and, for firms with employees, proof of workers’ compensation.
| Trade | Yearly fee and condition |
|---|---|
| General building | $25; roofing permits also need a copy of the state roofing license |
| Electrical | $25, waived with a current electrical license from any other Illinois city |
| Plumbing | No fee; copy of the state plumbing license required |
| Mechanical (heating and cooling) | $25 |
| Tree trimming | $25 |
Registration is for paid contractors only: homeowners doing work on their own property do not register. HVAC permits are issued both to registered contractors and to owners doing the work themselves. Water and sewer connection permits go to a licensed plumber, and an excavation applicant who is not the owner must be a contractor licensed by the city.
How to apply for a building permit in Macomb
Use the city’s use and bulk matrices, and ask the office whether the lot is in the Enterprise Zone or needs a special use, rezoning or site plan review first.
Make sure each paid contractor and subcontractor holds a current city registration with insurance on file.
Sketch house projects on the aerial map the city provides; commercial and institutional jobs need full building plans, and fire systems need sealed construction documents.
Use the online building permit application or the 2026 paper form, ticking the permit type and giving the project cost.
Your plumber gets a plumbing number and service form for taps; email right-of-way forms to the Business Office for Public Works review.
Pay by cash, check or card, then display the colored paper permit sign where it is clearly visible at the project.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Zoning steps take the longest: special uses and rezonings need about 60 days for Planning Commission and City Council hearings, and the Planning Commission meets on the first and third Wednesdays when it has business. Site plans must show contours, easements within 100 feet, existing and proposed buildings, landscaping, paving and signs, with scale, north arrow and dimensions, and the office may ask for more. Unregistered contractors, a missing roofing or plumbing license copy, or work begun before the permit (which doubles the fee) also hold things up. A permit is valid for 6 months.
Inspections in Macomb
The Office of Community Development, which houses the building inspector, is the number to call for inspections: (309) 833-4944. For plumbing, the person doing the work notifies the plumbing inspector when work starts and when it is ready; everything stays uncovered until approved, the inspector examines it within one day of notice, and a certificate of approval follows the final inspection.
- Water service: arrange the tap with Public Works at least 2 business days ahead, call Public Works when the service is ready for inspection and the Community Development office for the inside plumbing inspection, then book activation with the Business Office at least 2 hours ahead; turning water on without the Business Office can bring a penalty of up to $750.
- Sewer laterals: the Wastewater Superintendent inspects the tap and the Building Inspector the lateral.
- Right-of-way work: notify Public Works 24 hours before opening a street or sidewalk and again when forms are set; patches carry a one-year warranty, and winter asphalt cuts get a temporary patch until a final repair by June 1.
- Demolition: give at least 7 days’ notice for the utility disconnection inspection; a moved building needs a police escort to the city limits.
- Occupancy: buildings with fire protection systems need the Fire Prevention Bureau’s acceptance testing records before an occupancy permit is granted.
Rental units are inspected on tenant request; the Rental Housing Inspector is at (309) 833-4944, extension 1261.
Building codes in Macomb
The Community Development page lists the codes adopted in 2021: the 2018 International Building, Residential, Mechanical, Fire and Property Maintenance Codes, the National Electrical Code (the city lists its most recent edition), the Illinois State Plumbing Code and the 2018 Illinois Accessibility Code, with the residential climate table that requires ice and water shield. The fire protection application confirms the 2018 International Fire Code was adopted by city ordinance. FEMA lists Macomb (community 170473) as a participating National Flood Insurance Program community with no special flood hazard area mapped.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Macomb permit FAQs
How much is a building permit in Macomb?
$22 plus 0.55% of the project cost: about $77 for a $10,000 job and $1,122 for a $200,000 house. Enterprise Zone properties pay nothing.
Do I need a permit to replace windows, a roof or a fence?
Yes. The city lists roofs, decks, windows, bathrooms and fences among the jobs that need a building permit; painting, sealing and carpet work do not.
Can I do my own work without registering?
Yes. Contractor registration is for paid contractors; homeowners doing work on their own property do not register, and owners can get their own HVAC permits.
How do I register as a contractor in Macomb?
File the registration form with your insurance certificates and pay $25 a year per trade (plumbers pay nothing but submit the state license). Renew annually.
What happens if I start work without a permit?
The building permit fee doubles, and a demolition done before approval brings a $500 fine.
How long is a permit valid?
Six months from issue.
Do I need a permit to work in the street or on my driveway apron?
Yes. Right-of-way permits run $25 to $100, with a $1,000 or $5,000 bond for excavations, and Public Works must approve them.
Macomb permit records and official resources
To get copies of permits or other city records, file a Freedom of Information Act request with the city’s FOIA officer through the online request form; the city notes you may also send a request in any written format. Council and commission agendas and minutes are posted in the city’s public records portal.
Inspections are where schedules slip.
Get a free quote →- Office of Community Development (codes, forms, contacts)
- Permits and contractor registration
- Permit fee schedule
- 2026 building permit application
- Contractor registration form
- Right-of-way permit and street patching specifications
- Excavation for development permit
- Demolition and moving permit
- Water and sewer service form
- Fire protection system application
- Site plan review application
- Special use application
- Change of zoning application
- Zoning Board of Appeals petition
- Residential climate table (ice and water shield)
- Boards and commissions
- Rental inspections
- FOIA request form
- FEMA Community Status Book, Illinois
Simplify Macomb permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Macomb sooner?
Let Alliance prepare, file, and track your Macomb permits while your crew stays on the job.
More Illinois permitting guides
McDonough County
Read guide →Hancock County
Read guide →Fulton County
Read guide →Macon County Building Permit Guide
Read guide →Macoupin County Building Permit Guide
Read guide →Madison County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Macomb permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.