Skip to main content
Municipal GuideIllinoisMcHenry · McHenry County

McHenry, Illinois Building Permit Guide

To get a building permit in McHenry, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of McHenry’s Community Development Department issues building permits inside city limits, online or at 333 S. Green Street, with most applications processed within 10 business days.

Authority: City of McHenry Community DevelopmentFiling: BS&A online or in personPhone: 815-363-2170
Permit office
333 S. Green StreetMunicipal Center; weekdays 8:00 a.m. to 4:30 p.m.
Review time
10 business daysCounter permits same day in person, 24 hours online
Re-roof or fence
$25Residential fee schedule effective February 1, 2014
Inspections
24 hours’ noticeMorning or afternoon 3-hour windows

Inside the City of McHenry, building permits are issued by the city’s Community Development Department at the Municipal Center, 333 S. Green Street. Apply online through the city’s BS&A portal or in person; most residential and commercial applications are processed within 10 business days once complete, and re-roof, siding, window, water heater, furnace and sewer or water repair permits are issued on the spot. Fees follow the city’s residential schedule effective February 1, 2014: $0.25 per square foot for a new house or addition and $25 for a re-roof, fence or driveway.

What requires a building permit in McHenry?

The city requires a building permit for most home improvement and remodeling projects. Its residential fee schedule shows what that covers in practice: new homes, additions and remodeling, detached garages and sheds, decks and gazebos, demolition, driveways, sidewalks and stairs, fences, fireplaces, swimming pools and hot tubs, lawn irrigation, roofing, siding, windows and doors, water heaters, furnaces and boilers, central air conditioning, electrical installations and upgrades, sewer and water repairs, house raising or shoring and satellite dishes over 3 feet.

Issued at the counter

  • Re-roofing
  • Siding
  • Window and door replacement
  • Water heater replacement
  • Furnace and air conditioner replacement
  • Sewer and water service repair

Reviewed within 10 days

  • New houses and townhomes
  • Additions and remodeling
  • Decks, gazebos and garages
  • Pools and hot tubs
  • Retaining walls over 4 feet
  • Commercial build-outs and new buildings

The counter-based permits on the left are issued while you wait when filed in person with everything required, or within 24 hours when filed online. Retaining walls appear in the fee schedule only when they are over 4 feet tall. Projects in a subdivision also need any approval the homeowners’ association requires: the permit application states that private covenants and HOA approvals are the owner’s responsibility even after the city issues a permit.

What McHenry decides and what the state holds

McHenry adopts its own codes. Its code page lists the 2015 International Building, Residential, Fire, Existing Building, Mechanical, Fuel Gas and Property Maintenance codes, the 2014 National Electrical Code and the 2024 International Energy Conservation Code, most with city amendments, plus the current Illinois State Plumbing Code with amendments and the Illinois Accessibility Code. The city adopted the McHenry County Stormwater Management Ordinance in 2008 and enforces it locally. Plumbing work follows the state plumbing code and is reviewed and inspected by the city’s own plumbing inspector.

McHenry building department: who handles permitting

The Community Development Department enforces the building and construction codes, zoning, property maintenance and land-use approvals for the City of McHenry. It is led by Director of Community Development Ross Polerecky, and its staff includes a city planner, a plumbing inspector and permit representatives. McHenry County’s Building Division handles only unincorporated land, so an address inside city limits goes to the city even though the county government is also called McHenry.

Short on time to read all of this?

Get a free quote →
City of McHenry permit contacts
DetailInformation
OfficeCommunity Development, Municipal Center, 333 S. Green Street, McHenry, IL 60050
Phone815-363-2170 (permits and inspections); 815-363-2181 (city planner)
Emailced@cityofmchenry.org
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m.
OnlineBS&A Online for applications; the city’s online payment center for fees

McHenry permit types

The city sorts its applications into residential and commercial, and into small projects and new construction.

Residential permits

  • Residential Minor Building Permit. The online form for small residential projects.
  • New Construction Residential Building Permit. A March 2024 application for new single-family and multi-family homes. It asks for the parcel number, estimated construction cost, square footage, sleeping rooms, plumbing fixture count, water meter size, foundation type and garage spaces, and must include a completed contractor list.
  • Contractor List Form. An online form naming each contractor on the job.
  • Related forms. Right-of-way permits for work in the parkway or street, and the stormwater management permit application for regulated site work.

Commercial permits

Commercial work uses the Commercial Minor Building Permit for small projects, including signs, and the New Construction Commercial Building Permit for new buildings and additions, with a separate commercial fee schedule. A plan review fee applies to all new commercial construction, additions and remodels: none up to 500 square feet, $50 from 501 to 5,000 square feet and $200 above that. Fire protection and sprinkler permits are $200.

What comes before the building permit

  • Zoning relief. The seven-member Planning & Zoning Commission usually meets on the third Wednesday of each month. It holds hearings and makes recommendations to the City Council on zoning amendments, conditional uses (including planned unit developments) and variances, and it makes the final decision on zoning appeals.
  • Stormwater. Development covered by the McHenry County Stormwater Management Ordinance, which the city adopted in 2008, needs the city’s stormwater management permit.
  • Right-of-way. Work in the city right-of-way needs the city’s right-of-way permit application.
  • Utility and impact fees. New homes pay water and sewer connection and capital development fees and school, park, library and fire district contributions at permit issuance; see the cost section.

Not sure this scope needs a permit?

Get a free quote →

McHenry permit costs and fees

The residential and commercial fee schedules the city posts are dated February 1, 2014 and are the newest building permit schedules on its website, so confirm the current amounts with Community Development before you budget or apply. Fees must be paid before a permit is issued or any inspection scheduled, online or at the Municipal Center by cash, check or card, and the required inspections are included in the permit fee.

City of McHenry residential permit fees (effective February 1, 2014)
WorkFee
New house$0.25 per sq ft, plus $112 plumbing (detached), $80 plan review and $50 temporary occupancy fee
Addition or remodeling$0.25 per sq ft ($45 minimum), plus $56 plumbing and $1.50 per fixture, $80 plan review and $50 temporary occupancy
Detached garage$0.15 per sq ft
Deck or gazebo$30 plus $0.05 per sq ft
Shed / satellite dish over 3 feet$30
Re-roof, siding, fence, driveway, window or door$25 each
Sidewalk or stairs$45
Furnace or boiler / water heater / hot tub$35 each
Central air conditioning$40
Electrical installation or upgrade; fireplace; irrigation$50 each
Pool: storable / above-ground / in-ground$30 / $60 / $115
Demolition$100
Reinspection$28 plumbing; $37.50 for others after a second failed inspection

Worked examples from the schedule: a 300-square-foot deck pays $30 plus $15 (300 × $0.05), or $45. A new detached house of 2,500 square feet pays $625 in building fees (2,500 × $0.25), plus $112 for plumbing review and inspection, the $80 non-refundable plan review fee and the $50 temporary occupancy fee, for $867 before utility and impact fees.

Commercial work has its own schedule, also effective February 1, 2014:

Rather talk it over?

Call 1-855-478-4290 →
City of McHenry commercial permit fees (effective February 1, 2014)
WorkFee
New construction$250 for the first 200 sq ft, $0.08 per sq ft from 201 to 20,000 sq ft, $0.05 per sq ft above 20,000
Addition$0.25 per sq ft, $50 minimum and $10,000 maximum, plus plumbing
Remodeling$0.25 per sq ft, $50 minimum, plus plumbing
Re-roof / siding$75 / $50
Deck or gazebo / fence$65 / $35
Demolition$200
Sign: illuminated / non-illuminated$55 / $50
Site development permit; parking lot or sealcoating$50; $45

Those utility and impact fees are larger. The city’s standard fee sheet effective November 2, 2020 lists, for a three-bedroom single-family house, $7,175 in school, park, library and fire district contributions, $250 each for the water and sewer connections, $4,157 in water and $4,080 in sewer capital development fees, and $225 for a 3/4-inch water meter. The contributions rise with the number of bedrooms, from $3,929 for a detached house with two bedrooms or fewer to $10,205 for four bedrooms, and some subdivisions carry their own developer donation schedules or annexation fees under their agreements. According to the City Council’s minutes of its August 17, 2026 meeting, the Council passed, by 4 votes to 2, an ordinance amending Sections 9-6-2, 10-1-5 and 12-8-11 of the municipal code to eliminate automatic CPI-U adjustments to these cash contributions and capital development fees, and the mayor directed staff to bring research on the fees back to a later meeting.

Trade permits and who may pull them

The residential fee schedule has no separate electrical, plumbing or mechanical permit for a new house, addition or remodel: plumbing review and inspection fees are added to the building permit, while equipment such as a furnace, water heater or electrical upgrade is its own flat-fee permit. The city has its own plumbing inspector, and plumbing must meet the Illinois State Plumbing Code, which requires a state-licensed plumber. Every new-construction application must include the city’s contractor list naming the contractors on the job. The city’s permit pages and forms do not describe a separate local contractor license or registration.

On the commercial side, plumbing review and inspection is $215 plus $1.50 per fixture for new construction and $86 plus $1.50 per fixture for additions and remodels, and each failed commercial plumbing reinspection is $43.

Rather not deal with the building department?

Get a free quote →

How to apply for a McHenry building permit

1. Check zoning and HOA rules

Confirm setbacks with Community Development and get any homeowners’ association approval first.

2. Pick the application

Use the minor permit for small projects or the new-construction application for a new home or building.

3. Gather the documents

Plans or a marked survey, the contractor list and, for new homes, the fixture count and meter size.

4. Submit online or in person

File in BS&A Online or at 333 S. Green Street; counter permits filed in person are issued the same day.

5. Pay the fees

Plan review is due at application; the rest is paid before the permit is released.

6. Book inspections

Call 815-363-2170 at least 24 hours ahead for each inspection on your list.

Review, corrections and what causes delay

Most residential and commercial applications are processed within 10 business days, but the clock does not start until the city has everything it needs to review the project, so a missing contractor list, survey or set of plans pushes the date back. Counter-based permits filed online are issued within 24 hours. Because no inspection can be scheduled until the permit fee is paid, an unpaid permit also stops work in the field.

Inspections and certificates in McHenry

Each permit comes with a list of required inspections, and the inspections are included in the permit fee. Call Community Development at 815-363-2170 at least 24 hours ahead; the city cannot do same-day inspections. Inspections are booked in three-hour windows, from 9:00 a.m. to noon or from 1:00 to 4:00 p.m., except roofing and siding inspections, which are made between 10:00 a.m. and 2:00 p.m. A plumbing reinspection costs $28, and other residential reinspections cost $37.50 after the second failed inspection.

New homes, additions and remodels carry a $50 temporary occupancy fee on the residential schedule, and new commercial buildings a $100 temporary certificate of occupancy fee, so plan for the final inspection before moving in or opening.

Illinois building code in McHenry

McHenry enforces the 2015 International codes, the 2014 National Electrical Code and the 2024 energy code listed on its code page. FEMA’s Community Status Book lists the City of McHenry (community 170483) as participating in the National Flood Insurance Program, with current flood maps dated November 16, 2006; the city is not in the Community Rating System. Floodplain and stormwater rules come through the McHenry County Stormwater Management Ordinance as the city adopted it, and the city’s zoning ordinance, fence and sign rules sit in the McHenry City Code, which the city publishes through American Legal Publishing’s online code library.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

McHenry building permit FAQs

How much does a building permit cost in McHenry?

Under the residential schedule dated February 1, 2014, many permits are flat fees: $25 for a re-roof, fence, driveway or window replacement, $35 for a water heater and $45 for a typical deck. A new house is $0.25 per square foot plus plumbing, plan review and occupancy fees. Confirm the current amounts with the city before applying.

Can I get a roofing permit the same day?

Yes. Re-roof, siding, window and door, water heater, furnace and air conditioner and sewer or water repair permits are issued at the counter when the application is complete, or within 24 hours online.

How long does plan review take?

Most applications are processed within 10 business days, counted from the day the application is complete.

How do I schedule an inspection in McHenry?

Call 815-363-2170 at least 24 hours ahead. Inspections are made in morning or afternoon windows; roofing and siding between 10:00 a.m. and 2:00 p.m.

Does McHenry County issue permits in the City of McHenry?

No. The county issues permits only in unincorporated areas; inside city limits the City of McHenry issues them.

Does the city check homeowners’ association approval?

The city lists an HOA authorization among its residential forms, and the new-construction application states that private covenants, deed restrictions and association approvals remain the owner’s responsibility even after the city issues a permit. Get the association’s written approval before work starts.

Who hears zoning variances?

The Planning & Zoning Commission holds the hearing and recommends to the City Council; it decides zoning appeals itself.

Do I need a permit for a retaining wall?

The city’s residential fee schedule lists a $25 permit for retaining walls over 4 feet tall.

McHenry permit search and official resources

Applications are filed in BS&A Online and fees are paid through the city’s online payment center. Permit files, plans and inspection records are requested under the Freedom of Information Act through the city’s NextRequest FOIA portal. City Council and Planning & Zoning Commission agendas, packets and minutes are posted on the city’s agenda page.

Inspections are where schedules slip.

Get a free quote →

Simplify McHenry permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in McHenry sooner?

Let Alliance prepare, file, and track your McHenry permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about McHenry permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.