In unincorporated Menard County, the Menard County Zoning Office in the Courthouse Annex at 101 East Jefferson Street, Petersburg, issues the zoning permit (the county calls it a building permit) that every new house, garage, pole barn, shed, mobile home or other structure needs before it is built or placed. The county does not administer ordinances inside Athens, Greenview or Petersburg. A new house pays $200 plus 25 cents per square foot, and where a well or septic system is needed the permit waits for a copy of the Sangamon County Department of Public Health permit, which handles private sewage and water supply for Menard County.
What requires a permit in unincorporated Menard County?
Under Section 110 of the Menard County Zoning Ordinance, a zoning permit from the Zoning Administrator is a prerequisite to lawful development, and an occupancy permit is a prerequisite to using or occupying the property. No structure, mobile home, manufactured or modular home, portable building, pole barn, garage, carport, shed or container may be built, moved or placed on a lot until the permit is issued.
Permit needed
- Houses, mobile and manufactured homes, including tiny homes
- Room additions, sunrooms, decks, docks and covered patios
- Garages, carports, pole barns and sheds
- Swimming pools, above or in ground
- Fences and retaining walls on non-farm property
- Demolition
- Solar arrays, battery storage, towers and wind systems
- Commercial and industrial buildings and signs
Reduced rules for farms
- Farm land and buildings: review limited to principal use and setbacks
- No fee for agricultural buildings or farm labor housing with an affidavit on file
- No fence permit when the property’s principal use is a farm
- Sheds of 120 square feet or less: no charge
Existing uses do not need a new permit just because the ordinance was adopted. Separate permits are needed for development in a mapped floodplain, for larger site work under the stormwater ordinance, for septic systems and wells, and for 911 addresses.
What Menard County decides and what the state holds
The County Board of Commissioners adopts the zoning, subdivision, flood, stormwater and energy ordinances. Section 407 of the zoning ordinance adopts the International Building, Residential, Mechanical, Fuel Gas, Existing Building and Swimming Pool and Spa codes, the National Electrical Code, NFPA 101 and NFPA 855, and the Illinois Plumbing, Energy Conservation and Accessibility codes as the county building code, without naming editions, and makes violations punishable by fines of $50 to $1,000, with each day after notice a separate offense. The permit application itself describes the permit as enforcing the zoning ordinance, and applicants acknowledge that the office makes random inspections. Plumbing follows the Illinois Plumbing Code, and private sewage systems and water wells are permitted by the Sangamon County Department of Public Health under an agreement with the Menard County Board of Health.
Short on time to read all of this?
Get a free quote →Menard County building department: who handles permitting
The Zoning Office administers the Menard County Zoning and Subdivision Ordinances under the Board of Commissioners. Those ordinances apply to the unincorporated county and to villages that do not have their own ordinances. The county does not administer them in Athens, Greenview or Petersburg. To check whether a parcel is incorporated and how it is zoned, use the county’s zoning map on its Beacon parcel viewer or call the Zoning Office.
| Place | Who issues permits |
|---|---|
| Unincorporated Menard County | Menard County Zoning Office, 101 East Jefferson Street, Petersburg; 217-632-5123 |
| Petersburg (city) | City of Petersburg Zoning Administrator; 217-632-3600, Mondays and Wednesdays 10 a.m. to 2 p.m. or by appointment |
| Greenview (village) | Village Zoning Officer, assisted by the Village Board’s Zoning Committee; messages at 217-968-5314 |
| Athens (city) | City of Athens Zoning Department, which issues building permits, reviews plans and inspects; applications go back to City Hall, 210 Dottie Bednarko Drive; 217-636-8429 |
| Oakford and Tallula (villages) | The county ordinances apply in villages without their own; the published sources do not say whether these two have their own, so ask the village clerk or the county Zoning Office |
| Office | Contact |
|---|---|
| Zoning Office (zoning, floodplain, stormwater, 911 addresses) | Courthouse Annex, 101 East Jefferson Street, Petersburg, IL 62675; 217-632-5123; Monday, Wednesday and Friday 8:00 a.m. to 4:00 p.m., Tuesday and Thursday by appointment |
| Septic and well permits | Sangamon County Department of Public Health, 2833 South Grand Avenue East, Springfield; 217-535-3145 (local Menard office at One Centre Drive, Petersburg) |
| Highway Department | 15620 Chautauqua Road, Petersburg; 217-632-2722 |
Menard County permit types
The county posts separate applications for zoning (building) permits, residential solar permits, 911 addresses, the Certificate of Completion and Conformance, map and text amendments, subdivisions, special uses and variances.
Residential permits
- New homes. The application asks for the parcel number, zoning district (AG, RR, R1, R3, B1, B2, M1 or PL), whether the lot is in a floodplain, the required setbacks and height limit, and the home’s construction details. A complete set of plans is required for any new structure.
- Additions, decks and docks. The application asks for the dimensions and height of the change.
- Site sketch. Every application includes a sketch of the parcel showing existing and proposed structures, measured distances to each property line or to the center of the road, and driveways and parking.
- Mobile and manufactured homes. The applicant also signs that the home meets Section 6.13 of the ordinance, including a permanent perimeter foundation.
- Agricultural buildings. An affidavit on file waives the fee for buildings mainly used for agriculture in the AG district.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial new construction is charged $4 per $1,000 of construction cost with a $500 minimum, which covers plan review and the building permit; commercial additions and alterations are $2 per $1,000 with a $250 minimum. Commercial solar farms need a conditional use permit and Tier 2 battery storage systems a special use permit, each with its own fee and ordinance. Towers, small wind and commercial wind systems are charged $25 per vertical foot of height.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning relief. Variances, special uses, rezonings and appeals cost $300 each and go to the Zoning Board of Appeals, which meets on the last Thursday of each month at 6:00 p.m.; appeals must be in by the first Monday of the month. Administrative variances are $100.
- Septic and well. No permit is issued until the office has a copy of the well and septic permits, issued for Menard County by the Sangamon County Department of Public Health, which also keeps the list of registered septic contractors.
- Road access. Culvert installation and driveway siting fall under road district rules, which the Zoning Office does not enforce, and the ordinance requires the road district’s or highway official’s sign-off before a permit is granted.
- Floodplain. Development in a mapped floodplain needs a $100 floodplain development permit, and work on a stream under Illinois Department of Natural Resources jurisdiction also needs an IDNR Office of Water Resources permit.
- Splitting land. Divisions may fall under the subdivision ordinance and the Plat Act affidavit.
Menard County permit costs and fees
The Zoning Fee Schedule is printed in the county’s permit application, revised January 2026. Checks are made payable to “Menard County Zoning”, and the office also takes electronic payment.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Dwelling (AG, RR, R-1, R-3) | $200 plus $0.25 per sq ft, including attached garage |
| Mobile or manufactured home, including tiny homes | $500 |
| Accessory structure of 200 sq ft or more | $0.15 per sq ft, $100 minimum |
| Shed over 120 sq ft / 120 sq ft or less | $50 / no charge |
| Deck or covered patio | $0.15 per sq ft, $75 minimum |
| Swimming pool | $75 |
| Fence or retaining wall / demolition | $50 / $50 |
| Residential solar, 1–10 kW | $75 |
| Business buildings (B1, B2) | $200 plus $0.27 per sq ft |
| Floodplain development permit | $100 |
| 911 address | $25 per address |
| Occupancy certificate / re-inspection | $10 / $75 |
| Stop work order | $200 residential; $500 commercial; $25 agricultural |
Worked examples from the schedule: a new 1,800-square-foot house, counting its attached garage, pays $200 plus $450 (1,800 × $0.25), a $650 permit. A 300-square-foot deck works out to $45 at 15 cents a square foot, so the $75 minimum applies.
The schedule prints two rates for small outbuildings: $0.15 per square foot with a $100 minimum for accessory structures of 200 square feet or more, and a $50 shed permit for sheds over 120 square feet. Applications filed after construction has started or finished are charged double. Septic and well permit fees are set by the Sangamon County Department of Public Health, not the county zoning schedule.
Trade permits and who may pull them
The county’s fee schedule lists no separate electrical, plumbing or mechanical permits. The county’s pages describe no county license or registration for general contractors or electricians; the application simply asks for the contractor’s name and contact details. Plumbing must follow the Illinois Plumbing Code and its state licensing. Private sewage systems are a different matter: they are permitted through the Sangamon County Department of Public Health, which registers private sewage disposal contractors, and the county zoning page posts the list of registered septic contractors. Well construction, modification and sealing permits come from the same health department.
Rather not deal with the Menard County building department?
Get a free quote →How to apply for a Menard County permit
Check the county zoning map; inside Athens, Greenview or Petersburg, go to that town.
Call the Zoning Office for the setbacks and height limit of your zoning district before drawing the site sketch.
Obtain the health department permits and road district or highway sign-off first.
Submit the signed application, sketch, plans and fee at the Courthouse Annex.
Start work and keep it moving; the permit lapses after 180 days without diligent progress.
Return the Certificate of Completion and Conformance before anyone occupies the structure.
Review, corrections and what causes delay
The Zoning Administrator grants a permit when the use fits the zoning district, any special use or variance has been obtained, the bulk and setback rules are met and the health department and road authority have signed off. Without the septic or well permit copy, the zoning permit cannot be issued. An application not acted on within 90 days is deemed denied. A request for the occupancy permit must be made within one year of issuance, or the zoning permit expires. Floodplain lots and land divisions need extra review under the flood and subdivision ordinances, so talk to the office before filing.
Inspections and occupancy in Menard County
Menard County does not publish a staged inspection schedule. Applicants sign an acknowledgement that the Zoning Department makes random inspections of structures, and a structure used for anything other than what the permit states, including a different size, use or setback, may be treated as a zoning violation that has to go to the Zoning Board of Appeals or be removed. A failed inspection that must be repeated costs $75.
When the work is finished, the owner returns the Certificate of Completion and Conformance to the Zoning Officer, which serves as the application for the occupancy permit; occupancy certificates cost $10. The occupancy permit is granted when the structure was built as permitted and complies with the ordinance. Septic systems are handled separately by the health department.
Want this handled start to finish?
Get a free quote →Illinois building code in Menard County
The county’s Flood Damage Prevention Ordinance, adopted November 25, 2025 from the Illinois Department of Natural Resources model, sets the flood protection elevation at the base flood elevation plus one foot of freeboard. FEMA’s Community Status Book lists unincorporated Menard County (community 170505) as participating in the National Flood Insurance Program, with current flood maps dated May 4, 2009; the county is not in the Community Rating System. The companion Storm Water Ordinance of the same date requires a development permit for new development with 10,000 square feet or more of impervious surface or land disturbance of 10,000 square feet or more than 100 cubic yards; farming and agricultural buildings are exempt.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Menard County permit FAQs
Do I need a county permit to build a house in Menard County?
Yes, on unincorporated land. A zoning permit is required before any house, mobile home or other structure is built or placed; it costs $200 plus 25 cents per square foot for a house.
Does the county issue permits in Petersburg, Athens or Greenview?
No. Those three administer their own ordinances. Petersburg and Greenview each have a zoning officer, and the City of Athens Zoning Department issues building permits and inspects work in Athens.
Where do I get a septic permit in Menard County?
From the Sangamon County Department of Public Health, which runs private sewage and water well programs for Menard County. The county zoning permit is not issued until you supply a copy.
Do farm buildings need a permit?
Review of farm buildings is limited to their principal use and setbacks, and there is no fee for buildings used mainly for agriculture when an affidavit is on file.
How long is a Menard County permit good for?
It expires 180 days after issuance unless work is progressing diligently, and the occupancy request must be made within one year.
Do I need a permit for a shed?
Yes, but sheds of 120 square feet or less are free; larger sheds pay $50 under the shed line, and accessory buildings of 200 square feet or more are charged by area.
Who hears variances in Menard County?
The Zoning Board of Appeals, on the last Thursday of each month at 6:00 p.m. Variances cost $300, and filings are due by the first Monday of the month.
Menard County permit search and official resources
The county posts no online permit search. The Zoning Office issues zoning and floodplain certification letters for a parcel at $20 each. Zoning Board of Appeals agendas and minutes are posted on the county website, and parcel lines and zoning are on the county’s Beacon map.
Inspections are where schedules slip.
Get a free quote →- Menard County Zoning Office
- Zoning (building) permit application and fee schedule
- Menard County Zoning Ordinance
- Flood Damage Prevention Ordinance
- Storm Water Ordinance
- Zoning Board of Appeals agendas and minutes
- Menard County Health Department (septic and well forms)
- Menard County Highway Department
- City of Petersburg planning and zoning
- City of Athens building permits and inspections
- Village of Greenview planning and zoning
Simplify Menard County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Menard County sooner?
Let Alliance prepare, file, and track your Menard County permits while your crew stays on the job.
More Illinois permitting guides
Mason County
Read guide →Sangamon County
Read guide →Cass County
Read guide →Mercer County Building Permit Guide
Read guide →Midlothian Building Permit Guide
Read guide →Minooka Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Menard County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.