In Cass County, building permits for unincorporated land come from the county’s Zoning Enforcement Officer, Dave Mayes (217-370-0111, 8:30 a.m. to 5:00 p.m.), who administers the Cass County Zoning Ordinance and also handles variances, conditional and special uses and rezonings. The permit is a zoning permit: it checks the use, lot size and setbacks, and a house in the agricultural district needs at least 3 acres. Starting work without a permit can lead to a fine of $10 to $500 per offense on conviction, each day counting separately. Beardstown runs its own permits, and the county page says villages without their own zoning fall under the county ordinance.
What requires a building permit in Cass County?
Under the Cass County Zoning Ordinance, every building put up, every new use of land or buildings, every structural alteration or move, and every enlargement or addition must follow the rules of its zoning district, and the Zoning Enforcement Officer issues the permit that shows it does. The officer asks owners and contractors to contact him before any residential or commercial project, and the county warns that starting without a permit may lead to a fine.
Permit needed
- New houses, garages and other buildings, and additions
- Structural alterations, moving a building, and changes of use
- Fences in the required front yard of residential, business or industrial districts
- Fences or structures inside the sight triangle at intersections
- Mobile homes, temporary dwellings and mobile home parks
- Communication towers, wind turbines and solar energy systems
- Commercial and industrial buildings
No permit
- Routine maintenance and repair, such as repainting or re-roofing
- Alterations to an existing building worth less than $300
- A service connection to a municipally owned utility
- Land, buildings and structures used for agricultural purposes: citing 55 ILCS 5/5-12001, the ordinance requires no permit for them, though farm-building setback lines still apply
A garage, accessory building, basement, mobile home or other temporary structure may not be lived in without a temporary permit, and a mobile home outside an approved mobile home park is allowed only for a farm owner or operator, their relatives on the farm, or farm employees working there.
What the county decides and what the state holds
The county board sets zoning districts, lot sizes and setbacks, fees and penalties, and decides rezonings and special uses. The county pages show no county building code and no county construction inspection, so structural and electrical standards inside the county permit are not reviewed by the county. State rules still apply to the work itself: plumbing under the Illinois Plumbing Code by a state-licensed plumber, the state energy and accessibility codes, and roofing by a state-licensed contractor.
Short on time to read all of this?
Get a free quote →Cass County building department: who handles permitting
The Zoning Enforcement Officer administers the ordinance, reviews and issues building permits, and processes applications for variances, conditional uses, special use permits and rezonings. Appeals of his decisions go to the five-member Board of Zoning Appeals, whose members are appointed by the County Board chairman with no more than one member from any township. Its meetings are open to the public, and its minutes record each member’s vote. The County Board receives the Zoning Officer’s report each month; its July through September 2026 minutes show those reports received and no change to zoning fees.
| Office | Handles | Contact |
|---|---|---|
| Zoning Enforcement Officer | Building and zoning permits, variances, conditional and special uses, rezonings | 217-370-0111; 8:30 a.m.–5:00 p.m. |
| Cass County Highway Department (County Engineer) | County highways and bridges; road district contacts | 5432 County Shed Rd., Virginia, IL 62691; 217-452-7525; Mon–Fri 8:00 a.m.–4:30 p.m. |
| Cass County Health Department | Public health offices in Beardstown and Virginia | 8590 St. Lukes Drive, Beardstown, 217-323-2242; 331 South Main, Virginia, 217-452-3057 |
Who permits in each city and village
| Place | Who issues building permits |
|---|---|
| Beardstown (city) | City Planning and Zoning Division, 105 W 3rd Street; building permit applications through the city’s Cloudpermit system |
| Virginia (city), Arenzville, Ashland, Chandlerville (villages) | The town’s own office if it has zoning; the county page says villages without a zoning ordinance fall under the county ordinance. Ask the town clerk which applies |
| Unincorporated land, farms and rural subdivisions | Cass County Zoning Enforcement Officer |
The county’s zoning page and its ordinance describe the county’s reach differently: the page includes villages that have no zoning ordinance, while the ordinance’s jurisdiction clause names the unincorporated areas. To see whether a parcel is inside a city or village, use the Cass County GIS map linked from the county’s GIS page. The Highway Department’s page also lists each local road district’s commissioner and clerk, with a map of the road districts.
Not sure this scope needs a permit?
Get a free quote →Cass County permit types
The county application is a one-page “Application for Permit” under the zoning resolution. It asks for the lot, subdivision and block, zoning district, township and legal description, the estimated cost, number of stories, length, width and height, the front, side and rear setbacks and the occupancy use. The applicant signs it before a notary, and the issued permit must be kept on the premises. The ordinance asks for applications in triplicate.
Residential permits
- Houses in the agricultural district need a lot of at least 3 acres, at least 800 square feet of living area, a width of at least 14 feet and at least 20 feet of public road frontage. Every structure must sit at least 50 feet from a federal or state highway right-of-way and 35 feet from a county or township road, with 35-foot side and rear setbacks.
- Lots without public water or sewer must be at least 100 feet wide and 20,000 square feet, and large enough for an on-site sewage system built to state health standards.
- Livestock on a non-farm house lot needs at least 5 acres, with no more than 3 animals for the owner’s personal use and permanent shelter.
- Mobile homes outside a park are limited to farm owners or operators, relatives living on the farm and farm employees.
- One principal building per lot: only one principal structure may be built or moved onto a lot, though a farmstead may also hold a single-family home for a relative.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Business and industrial uses belong in the B-1, B-2, B-3 and M-1 to M-3 districts or a planned development district. Communication towers must be set back the full tower height from every property line and twice the height from a nearby home not owned by the landowner. Solar energy systems pay a building permit fee of $200 under 1 megawatt DC, and wind systems need a certificate of compliance before the building permit. In the agricultural district, a sign may be no larger than 300 square feet, may not flash, must sit 50 feet back from every public right-of-way and at least 300 feet from road intersections, and only one is allowed for each 1,000 feet of highway frontage; real estate signs up to 12 square feet on the property for sale are allowed.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Rather talk it over?
Call 1-855-478-4290 →What comes before the building permit
- Zoning relief. Variances, conditional uses, special uses and rezonings are filed with the Zoning Enforcement Officer; appeals go to the Board of Zoning Appeals, where four votes are needed to overturn the officer.
- Site suitability. The County Planning Commission can bar a use or building on land it finds unsuitable because of flooding, runoff, poor drainage, soils, slope or similar problems, stating its reasons in writing.
- Sewage and water. Where no public sewer or water is available, the ordinance asks for a sewage disposal plan and a water supply plan certified in writing by the County Engineer.
- Road access. The general site rules ask for at least 30 feet of frontage on a public road (the agricultural-district house rule says 20 feet), and new driveways may be no wider than 24 feet at the street line and 30 feet at the roadway.
Cass County permit costs and fees
The zoning ordinance says fees for zoning amendments, use permits, certificates of compliance, variations and appeals are set by action of the County Board and paid to the County Clerk. The county does not publish a general building permit fee table, so ask the Zoning Enforcement Officer for the fee when you apply. The ordinance does print fees for towers and energy systems.
| Item | Fee |
|---|---|
| General building and zoning permits, variances, appeals, rezonings | Set by County Board action; paid to the County Clerk |
| Communication towers | $25 per foot of tower height |
| Adding or replacing equipment on an existing tower | $1,200 flat |
| Mini or small wind energy system certificate of compliance | $250 initial review; $50 for each later revision review |
| Commercial wind energy system certificate of compliance | $50 per foot of system height |
| Solar energy system building permit | $200 under 1 MW DC; $500 per MW DC at 1 MW and above |
| Zoning violation | $10 to $500 per offense; each day is a separate offense |
Worked example from the ordinance: a 180-foot communication tower pays 180 × $25, or $4,500. No example is given for a house, because the general permit fee is not published.
Rather not deal with the Cass County building department?
Get a free quote →Trade permits and who may pull them
The county pages list no electrical, plumbing or mechanical permits and no contractor licensing or registration for unincorporated areas; the county permit covers zoning only.
- Plumbing: follows the statewide Illinois Plumbing Code and must be done by a plumber licensed by the Illinois Department of Public Health.
- Roofing: roofing contractors need a state license from the Department of Financial and Professional Regulation, even where re-roofing needs no county permit.
- Sewage systems: the ordinance requires the sewage plan to meet local, county and state Board of Health standards and to be certified by the County Engineer.
- Inside towns: Beardstown and any other town with its own permit office sets its own trade requirements.
How to apply for a Cass County building permit
Check the county GIS map; in Beardstown, apply through the city’s Cloudpermit system instead.
Ring 217-370-0111 to confirm the district, setbacks and any variance or special use you need.
A registered land surveyor shows the lot, buildings, easements, driveways, yards and neighbors within 40 feet.
Without public service, have the County Engineer certify the sewage and water plans.
Fill in the Application for Permit in triplicate, sign it before a notary and pay the fee.
Post the permit at the property and start substantial work within 90 days.
Review, corrections and what causes delay
Projects stall when a lot is too small for its district, lacks the required road frontage, sits on land the Planning Commission finds unsuitable, or needs a variance or special use that must go to a hearing first. A permit for a main building also covers the accessory buildings built with it at the same time. If substantial work has not started within 90 days, a new permit is needed, and the officer can revoke a permit when the work breaks the rules it was issued under.
Inspections and certificates in Cass County
The county pages describe no construction inspections; the Zoning Enforcement Officer enforces the ordinance and may revoke a permit when he finds, by personal inspection or other evidence, that the rules are being broken. The County Board, the officer, the County Planning Commission, or a neighbor specifically harmed can go to court to stop a violation, and each day a violation continues is a separate offense.
Want this handled start to finish?
Get a free quote →The ordinance refers to certificates of compliance for zoning: wind energy systems must have one before the building permit, after all required studies and approvals are filed. Keep the issued permit at the property, because the county form states it must stay on the premises.
Illinois building code in Cass County
FEMA’s Community Status Book lists unincorporated Cass County (community 170810) as participating in the National Flood Insurance Program, with flood maps effective May 16, 2019; the zoning ordinance includes flood plain regulations. The county row covers unincorporated land only.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Cass County permit search and official resources
The Zoning Enforcement Officer keeps the files of permits issued and applications received, as the ordinance requires, and reports to the County Board every month. For copies of a past permit, call the officer; County Board agendas and minutes are posted on the county website.
- Cass County Zoning Enforcement Officer
- Cass County application for zoning permit
- Cass County Zoning Ordinance
- Cass County GIS maps
- Cass County Highway Department
- Cass County Health Department
- Cass County Board agendas and minutes
- City of Beardstown planning and zoning
Inspections are where schedules slip.
Get a free quote →Cass County building permit FAQs
Who issues building permits in unincorporated Cass County?
The county’s Zoning Enforcement Officer, reached at 217-370-0111 between 8:30 a.m. and 5:00 p.m.
How big must a lot be for a house in the agricultural district?
At least 3 acres, with 20 feet of road frontage; the house needs 800 square feet of living area and a 14-foot width.
Do farm buildings need a county permit?
No. Citing 55 ILCS 5/5-12001, the zoning ordinance requires no permit for land and buildings used for agricultural purposes, but setback lines for farm buildings and the minimum lot size for a house on farmland still apply.
How much does a county permit cost?
The County Board sets the general fees and they are not posted; towers pay $25 per foot and solar systems under 1 MW pay $200.
Can I live in a mobile home on my land?
Outside a park, only farm owners or operators, relatives living on the farm and farm employees may.
Does the county permit work in Beardstown?
No. Beardstown takes building permit applications through its own Cloudpermit system.
How long do I have to start work?
Substantial work must start within 90 days or a new permit is required.
Simplify Cass County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cass County sooner?
Let Alliance prepare, file, and track your Cass County permits while your crew stays on the job.
More Illinois permitting guides
Sangamon County
Read guide →Bureau County
Read guide →Boone County
Read guide →Champaign Building Permit Guide
Read guide →Champaign County Building Permit Guide
Read guide →Charleston Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Cass County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.