Skip to main content
Municipal GuideIllinoisWoodstock · McHenry County

Woodstock, Illinois Building Permit Guide

To get a building permit in Woodstock, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Woodstock’s Building & Planning staff review, permit and inspect all construction in the city, with applications filed online through OpenGov and express permits usually issued in 3 to 5 business days.

Authority: City of Woodstock Development Services, Building & PlanningFiling: OpenGov online portalPhone: 815-338-4305
Permit office
121 W. Calhoun StreetCity Hall, 1st floor; open until 7 p.m. on Tuesdays
Review time
3–5 or 10–15 daysExpress permits / other projects, in business days
Permit life
120 days12 months for a new building or an addition
Inspections
48 hours’ noticeCall 815-338-4305

In the City of Woodstock, building permits come from Building & Planning, part of the Development Services Department at City Hall, 121 W. Calhoun Street. Applications go through the city’s OpenGov portal; express permits are generally issued in 3 to 5 business days and other projects take 10 to 15. Contractors do not need a Woodstock license or registration, but electricians, plumbers and roofers must file a copy of their license and a letter of intent with each application, and the city issues its own electrical contractor license by exam. Most permits are good for 120 days.

What requires a building permit in Woodstock?

A building permit is needed before most construction, demolition, rehabilitation and repair work in the city. Woodstock publishes the list of projects it permits, and two items carry a qualifier: a driveway or apron needs only zoning approval, not a building permit, and replacing a window or door needs a permit only if the size of the opening changes.

Permit needed

  • New buildings, additions, garages and interior remodeling
  • Roofs, decks, porches, stairs and landings
  • Fences, sheds, gazebos and swimming pools
  • New central air, furnaces and water heaters
  • Electrical work other than low voltage, and all plumbing work
  • Generators, solar panels, fireplaces and radon systems
  • Lawn sprinklers, signs and demolition
  • Fire alarms, fire sprinklers and commercial kitchen hood systems

Zoning approval only, or none

  • Driveways and aprons: zoning approval only
  • Same-size window or door replacement: no permit
  • Low-voltage electrical work: no permit

Work on the outside of a landmark or of any property in the Downtown Business Historic District also needs a Certificate of Appropriateness under the city’s Downtown Design Review Guidelines. Category I work may be approved by staff; Category II work goes to the Historic Preservation Commission.

What Woodstock decides and what the state holds

Woodstock adopts its own codes, with local amendments in Title 7, Building Regulations, of the City Code. It enforces the 2021 International Building, Residential, Mechanical, Fire, Fuel Gas, Existing Building, Property Maintenance and Swimming Pool and Spa codes, the 2020 National Electrical Code, the 2021 NFPA 101 Life Safety Code, the current Illinois Energy Conservation Code and Illinois State Plumbing Code, and the Illinois Environmental Barriers Act and Accessibility Code. Plumbers and roofers hold state licenses, and Woodstock itself issues electrical contractor licenses by examination.

Woodstock building department: who handles permitting

Building & Planning, within the Development Services Department, has two divisions. Building and Code Enforcement reviews, inspects and approves all construction in the city, handles code complaints, certifies backflow devices and runs the electrical licensing exam. Planning & Zoning administers the Unified Development Ordinance and the comprehensive plan and supports the Plan Commission and Historic Preservation Commission. Joe Napolitano is the Building & Planning Director. Woodstock is the McHenry County seat, but the county’s Building Division covers only unincorporated land.

Short on time to read all of this?

Get a free quote →
Woodstock permit contacts
DetailInformation
OfficeBuilding & Planning, City Hall, 121 W. Calhoun Street, 1st floor, Woodstock, IL 60098
Phone815-338-4305 (City Hall main line 815-338-4300)
Emaildevelopmentservices@woodstockil.gov
City Hall hoursMonday, Wednesday, Thursday and Friday 8:30 a.m. to 5:00 p.m.; Tuesday 8:30 a.m. to 7:00 p.m.
Online portalOpenGov permit portal

Woodstock permit types

Applications are filed in the city’s OpenGov portal, and the city posts handouts for basements, decks and porches, demolition, driveway expansions, fences, garages, generators, ramps, sheds, solar, pools and spas, signs and temporary tents.

Residential permits

  • Small projects. Decks, sheds, pools and similar jobs are reviewed in house. A deck or porch needs a plat of survey showing the existing conditions and the new structure.
  • New homes and additions. The checklist asks for scaled plans with floor plans, elevations and complete mechanical, electrical and plumbing layouts, equipment cut sheets, a current grading plan signed and sealed by an Illinois licensed land surveyor showing contours, top of foundation and easements, and energy code compliance reports. It also asks for the plumbing contractor’s state license and the electrical contractor’s tested license, each with a signed letter of intent.
  • Separate permits. A new home also needs a stormwater management permit and a right-of-way opening permit, each applied for separately in the portal.

The handouts page still says applications for new residential, commercial and industrial buildings must be obtained in person, while the newer residential checklist sends them through OpenGov.

Commercial permits

New buildings, larger multi-family, commercial and industrial projects, and fire sprinkler, fire alarm, commercial kitchen and specialized equipment plans go to the City’s Plan Review Consultant. The consultant contacts the applicant with its fee, which is paid directly to the consultant before review starts, and comments normally come back within 10 business days; site engineering may take longer. Sprinkler, alarm, kitchen equipment and specialized equipment each need their own application, which may be filed after the building permit but can delay occupancy if left late. A new food establishment, or an extensive remodel of one, needs McHenry County Health Department plan review before construction begins.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Planning & Zoning staff guide applicants through annexation, rezoning, special use permits and variances under the Unified Development Ordinance and support the Plan Commission. The city is rewriting the ordinance after adopting its 2024 Comprehensive Plan.
  • Historic district. A Certificate of Appropriateness for exterior work downtown.
  • Stormwater and right-of-way. Separate permits for new homes and site work.
  • Impact fees. Charged on new dwellings with the water and sewer fees; see the cost section.

Woodstock permit costs and fees

The city posts its building and construction fees from Section 7.1.7 of the City Code as a fee sheet. The sheet is undated, and the code adjusts these fees, but not impact fees, every January 1 by the Chicago-area consumer price index, rounded up in $5 steps, so the amount charged can be higher than the printed figure.

Woodstock building and construction fees (city fee sheet)
WorkFee
New dwelling or structure$0.20 per sq ft
Shed or gazebo / deck / garage / fence$25 / $40 / $75 / $20
Residential alteration or remodel$20 up to $2,000; $55 from $2,001 to $8,000; above $8,000, same as new construction
Plan review, residential projects of $10,000 or more$110 per dwelling unit or structure
Electrical or plumbing, residential upgrade or alteration$55 each
Electrical or plumbing, new dwelling$110 per unit each
HVAC, new home or remodel$55 plus $30 per appliance
Swimming pool over 1,000 gallons$60 plus electrical
Demolition of a house$150, plus a $2,500 cash deposit and a bond
Certificate of occupancy$55 residential; $110 non-residential
Work begun without a permitFees doubled, $55 minimum

Worked example from the sheet: a new 2,400-square-foot house pays $480 (2,400 × $0.20) in building fees, $110 for plan review, $110 each for electrical and plumbing and $55 for the certificate of occupancy, or $865, before the HVAC fee, the construction water fee of $60, the water meter and the impact fees.

Rather talk it over?

Call 1-855-478-4290 →

Those impact, water and sewer fees, on the city’s table effective June 2018, are the largest part of the cost of a new house: $9,599 for a two-bedroom single-family home, $15,760 for three bedrooms and $19,059 for four or more. For three bedrooms that is $3,378 for schools, $2,733 for parks, $261 for the library, $246 for streets, $391 for police, $130 for fire and rescue, $3,395 for water and $5,225 for sewer. Non-residential construction pays $0.17 per square foot, $270 for plan review and the consultant’s review fee.

Water service for a new home adds a city-installed meter ($360 for 5/8 inch, $470 for 3/4 inch and $580 for 1 inch), the $60 construction water charge for a single-family or duplex structure and a $10 sewer connection inspection. Demolishing a house also requires a $2,500 cash deposit to cover filling below-grade areas and restoring the site, plus a hold-harmless bond of $50,000 for a structure of up to three stories or $100,000 above that.

Trade permits and who may pull them

The city’s permits page says contractors do not need to be licensed or registered by the City of Woodstock to work in the city. Electricians, plumbers and roofers must still attach a copy of their license and a letter of intent to every permit application, and plumbing contractors use their State of Illinois 055 license. For electrical work the city’s new-construction checklist asks for an electrical contractor’s license that must be a tested license.

Woodstock is one of the Illinois municipalities that issue their own electrical contractor licenses. The open-book exam is given on the third Thursday of every other month, from 9 to 11 a.m. at City Hall, on the 2014 National Electrical Code. It costs $100, half paid at registration and half on test day, a score of 75% or better passes, and anyone who fails waits a year to retake it. A passing applicant files an application and a certificate of insurance naming the city; the license renews each January 1 for $75 and covers both commercial and residential work. Register for a seat at 815-338-4305.

How to apply for a Woodstock building permit

1. Talk to Building & Planning

The city recommends calling before any construction project or business opening to confirm the codes and steps.

2. Read the handout

Use the city’s handout or checklist for your project to assemble plans and the survey.

3. Collect licenses and letters

Get license copies and letters of intent from the electrician, plumber and roofer.

4. Apply in OpenGov

Upload the application and drawings; add the stormwater and right-of-way permits for a new home.

5. Pay the consultant if asked

Larger projects pay the Plan Review Consultant directly before review begins.

6. Pay and keep plans on site

Pay the city’s fees; keep one approved set of plans on the job at all times.

Rather not deal with the building department?

Get a free quote →

Review, corrections and what causes delay

In-house reviews go to the building inspector, plumbing inspector, city engineer and city planner, and their comments are usually sent to the applicant, architect or engineer by email. Plans that are not approved must be revised to answer every comment and resubmitted. Express permits are generally issued in 3 to 5 business days and other projects take 10 to 15; consultant reviews normally take 10 business days, and site engineering can take longer. Permits are valid for 120 days, or 12 months for a new principal building or an addition. The holder may ask in writing for an extension of up to 120 more days with good cause, but the city is not obliged to grant it.

Inspections and certificates in Woodstock

Schedule inspections at least 48 hours ahead by calling 815-338-4305. A deck or porch is inspected at the piers or footings after the holes are dug and before concrete is poured, at rough framing and at final. A new house moves through footing, wall pre-pour, backfill, underground plumbing and electrical, sewer and water service, insulation, a stack test, a combined rough framing, plumbing, electrical and mechanical inspection, and a final.

A final inspection is required before any building is used or occupied, and the certificate of occupancy costs $55 for a home. The city’s construction-hours rule bars construction or alteration work before 7:00 a.m. or after 9:00 p.m. Monday through Saturday, and before 10:00 a.m. or after 5:00 p.m. on Sundays and legal holidays, where the work by its nature will alarm or disturb another or disturb the peace.

Illinois building code in Woodstock

Woodstock enforces the 2021 International codes and the 2020 National Electrical Code with the amendments in Title 7 of the City Code. FEMA’s Community Status Book lists the City of Woodstock (community 170488) as participating in the National Flood Insurance Program, with current flood maps dated November 16, 2006, and as a Community Rating System class 10 community, a class that carries no flood insurance discount.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

Woodstock building permit FAQs

Do I need a permit to replace windows in Woodstock?

Only if the size of the opening changes. Same-size window and door replacements do not need a building permit.

Do I need a permit for a new driveway?

No building permit, but driveways and aprons need zoning approval from Building & Planning.

How long does a Woodstock permit take?

Express permits are generally issued in 3 to 5 business days; other projects take 10 to 15 business days, and consultant reviews about 10.

Does Woodstock license contractors?

Contractors do not need a city license or registration to work in Woodstock, but electricians, plumbers and roofers file a license copy and letter of intent with each permit. The city also issues its own electrical contractor license by exam, and its new-home checklist asks for a tested electrical license.

How long is a permit valid?

120 days, or 12 months for a new principal building or an addition. The holder may ask in writing for an extension of up to 120 days for good cause, but the city does not have to grant it.

How do I schedule an inspection?

Call 815-338-4305 at least 48 hours in advance. A final inspection is required before occupancy.

Does downtown work need extra approval?

Yes. Exterior work on a landmark or any property in the Downtown Business Historic District needs a Certificate of Appropriateness; staff can approve Category I work, and Category II work goes to the Historic Preservation Commission.

What does a deck permit cost in Woodstock?

The city’s fee sheet lists $40 for a residential deck, subject to the annual CPI adjustment.

Woodstock permit search and official resources

Applications and drawings are submitted through the OpenGov portal. Copies of permits, plans or inspection records are requested under the Freedom of Information Act, in writing: in person, by mail, fax or email, or online through the city’s JUST FOIA portal. Since January 1, 2026 an emailed request must be written in the body of the message. The city answers within five business days, and the first 50 pages of copies are free.

Inspections are where schedules slip.

Get a free quote →

Simplify Woodstock permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Woodstock sooner?

Let Alliance prepare, file, and track your Woodstock permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Woodstock permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.