Inside Zion’s city limits, the City of Zion Building Department (2828 Sheridan Road, 847-746-4018) issues building, electrical, mechanical and plumbing permits. You file a completed paper application with the owner’s details, the full value of the work and a signed consumer rights acknowledgement; every contractor must first register with the city in person. Under the city’s fee ordinance most work costs 2.2% of the construction cost with a $55 minimum, and plan review for small residential projects is a flat $85.
What requires a building permit in Zion?
Zion’s fee ordinance (Ordinance 19-O-14, amending Section 10-9 of the Municipal Code) and the Building Department’s handouts show how wide the permit net is. Roofing and chimney repair, for example, are named outright: Section 10-9(j) says a permit is required from the city’s building department for that work. The 2024 building permit application also has lines for siding, windows (with their U-factor), fences, decks, sheds and driveways, so exterior replacement work goes through the counter as well.
Permit required
- New homes, duplexes, commercial and industrial buildings, additions and garages
- Sheds, decks, sunrooms and finished basements
- Kitchen and bathroom remodels, and repairs or alterations other than structural
- Roofing, chimney repair, siding and window replacement
- Fences, driveways and parking areas
- Above-ground and in-ground swimming pools
- Heating, air conditioning, fireplaces and wood stoves
- Electrical and plumbing work, on their own applications
- Demolition, moving, razing, shoring and underpinning
- Water wells, fuel storage tanks, canopies, towers and satellite dishes
- Repairs to fire-damaged structures and temporary structures or uses
Separate city approvals
- Signs and temporary signs (sign permit forms)
- Excavation in the right of way (excavating permit, contractor bond)
- A construction trailer on the site: a temporary permit from the building inspector, applied for 10 days ahead
- A building that occupies a street or other public place during the work
- Variances, special uses and zone changes
The city does not publish a list of work that is exempt from permits, so ask the office before assuming small jobs are free of one. Starting residential work without a permit adds a violation fee of $200 for a first offense, $300 for a second and $400 for a third, and the driveway handout warns that a compliance ticket will be written with a $200 minimum fine.
What Zion decides and what the state holds
The city chose its own codes. Its Building Codes page lists the 2021 International Building, Residential, Existing Building, Mechanical and Fire Codes, the 2015 International Property Maintenance Code and the 2011 National Electrical Code, each with local amendments in Chapter 10 (fire amendments in Chapter 34), plus the current International Energy Conservation Code, Illinois Plumbing Code and Illinois Accessibility Code, adopted as of January 1, 2025. Plumbing is done to the state plumbing code by state-licensed plumbers, and roofing contractors need the state roofing license, which the city also asks for when a contractor registers. The city sets its own fees, contractor registration and setback rules.
Short on time to read all of this?
Get a free quote →Zion building department: who handles permitting
The Building Department handles building and trade permits, plan review, contractor registration and inspections for all property inside the city. Land outside the city limits in unincorporated Lake County is permitted by the county’s Planning, Building and Development department instead, so check whether a parcel is inside Zion before filing.
| Item | Details |
|---|---|
| Office | City Hall, 2828 Sheridan Road, Zion, IL 60099 |
| Phone | 847-746-4018 (fax 847-746-4665); City Hall main line 847-746-4000 |
| Hours | Monday to Friday, 8 a.m. to 5 p.m., closed 12:00 to 1:15 p.m. |
| Department head | Richard Ianson, Director of the Building Department |
| Filing | Paper applications from the city’s Forms-Apps-Permits page, filed at the office |
Zoning relief goes to the city’s Zoning Board of Appeals through the variance application; special uses, text amendments and zone changes have their own applications. Property maps for those petitions come from the Zion Township Assessor, and the applicant pays to notify owners of all property within 250 feet before the hearing.
Zion permit types
Zion uses four core applications, all revised in 2024: the building permit, electric permit, mechanical permit and plumbing permit. The building permit application asks for the property index number (PIN), use type, zoning district, the owner, the general and roofing contractors and any architect, then the details of the work and the total estimated value, completed.
Residential permits
- Sheds: plat of survey (two copies) showing the gas line and shed location, two sets of drawings or the maker’s instructions, and the cost. Sheds sit only in the rear yard on an anchored four-inch concrete slab, at least 3 feet from side lines and 5 feet from the rear line, at least 6 feet from the house (fire-rated drywall inside if less than 10 feet away) and no taller than 18 feet or the house.
- Fences: plat showing the fence; 6 feet maximum in residential areas and 4 feet in a front yard with at least 50% openness; corner lots and alley corners have their own height and 8-foot setback rules.
- Decks: plat, two sets of drawings and the application; the handout sets lumber, ledger, post and footing details.
- Driveways and parking pads: plat with measured dimensions, asphalt, concrete or load-rated pavers only (no gravel), a minimum parking area of 22 by 20 feet, and Engineering Department approval.
- Roofing: contract with cost and a consumer rights form; no more than two layers of roofing, ice and water shield at the eaves and drip edges required.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial, industrial and multi-family work uses the same building application with drawings, and the plan review rate is $110 an hour with a $220 minimum. Certificates of occupancy are charged per unit, a change of use needs its own $110 certificate, and elevators are reviewed and inspected twice a year by a state-licensed inspection company, with the city adding a $110 handling fee. Commercial and industrial roofing must be done by contractors who meet the city ordinance.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: the application asks for the zoning district; setbacks and lot coverage limit sheds, garages and paving. A variance costs $550 plus $15 per acre, plus a $55 township fee and $6 per acre, postage and any consultant time.
- Utility locates: call JULIE at 811 before digging; the shed handout asks for the gas line on the plat.
- Engineering: driveways and parking areas need Engineering Department approval and a $220 engineering fee; allow 7 days.
- Flood maps: FEMA’s current flood map for Zion is dated October 5, 2023; ask the Building Department about any mapped flood area before building.
Zion building permit fees
Fees come from Section 10-9 of the Municipal Code as amended by Ordinance 19-O-14, published May 8, 2019, which is the fees ordinance the city links on its forms page. The core rule is a percentage of the construction cost:
| Work | Fee |
|---|---|
| New construction (homes, duplexes, commercial) | 2.2% of cost up to $2,000,000; 0.75% of the portion over $2,000,000 |
| Repairs and alterations other than structural, roofing | 2.2% of cost, $55 minimum |
| Pools, fences, heating and air conditioning | 2.2% of cost, $55 minimum |
| Plan review, one- and two-family dwellings | $110 per hour, $220 minimum |
| Plan review, residential garage, sunroom, shed, deck, pool, basement, kitchen or bath | $85 flat |
| Plan review, commercial or industrial | $110 per hour, $220 minimum |
| Certificate of occupancy, one or two units | $110 |
| Certificate of occupancy, over two units | $110 first unit, $55 each additional |
| Re-inspection | $55, paid before the re-inspection |
| Demolition | $275 primary building; $110 accessory building |
| Fireplace or wood stove | $55 |
| Gas permit | $30 |
| Well drilling | $40 (6-inch casing) or $60 (over 6 inches) |
| Temporary use permit | $55 |
| Construction trailer permit | $20, plus a $500 penalty if the trailer arrives first |
Rather talk it over?
Call 1-855-478-4290 →The driveway handout adds a $220 engineering fee for plan review and inspections on top of the 2.2% permit fee. A shed costing $4,000, for example, pays 2.2% of $4,000 = $88 for the permit plus the $85 plan review fee, $173 in all. Work begun without a permit adds the violation fee, and a building that occupies a street or other public place pays $25 for each day.
Trade permits and who may pull them
Electrical, mechanical and plumbing work each have their own 2024 application, and a general contractor must submit every trade’s application with the building permit. All contractors must be registered with the city before they can pull permits, and unregistered trades must come in person to register. The 2024 registration sheet says registration is free; the fees ordinance still lists $110 a year for electrical contractor registration, expiring April 30, so ask the office which charge applies.
- General contractors: registration form, a certificate of insurance naming the City of Zion as both certificate holder and additional insured, the state roofing license for roofing work, and photo ID for the owner and each person who signs for permits.
- Electrical contractors: an electrical license from an Illinois city that gave a test; each authorized agent who signs for permits must hold an electrical license on file with the city.
- Heating and mechanical contractors: an HVAC license (a license, not a registration) from an Illinois city that gave a test, or an EPA certification, plus insurance and ID.
- Plumbing contractors: an Illinois plumbing license (058) or a City of Chicago license with the state registration (055), and a letter of intent for every job.
- Excavating contractors: registration, insurance and a $10,000 or $25,000 bond set by the project.
Homeowners may take out permits for work on their own home, but the roofing, shed and fence handouts require a copy of the homeowner’s insurance showing at least $300,000 in personal liability coverage (Municipal Code Section 10-9.1), and the owner must do the work; immediate family may help.
Rather not deal with the building department?
Get a free quote →How to apply for a Zion building permit
Parcels outside the limits go to Lake County; check the zoning district for setbacks before drawing plans.
Every contractor registers in person with insurance, licenses and ID before any permit is issued.
Get the building permit and any electric, mechanical or plumbing application, plus the handout for your project, from the Forms-Apps-Permits page.
Include the plat of survey, drawings, the contract with cost, the signed consumer rights acknowledgement and, for owner work, proof of insurance.
Bring the complete package to 2828 Sheridan Road; incomplete paperwork is not accepted.
Pay the permit, plan review and any engineering fees listed on the application.
Review, corrections and what causes delay
The most common hold-up is missing paperwork: the city will not accept an application without the owner’s name, address and phone, the signed and dated application, the estimated value of labor and materials, or the consumer rights form. A general contractor who files without the trade applications, or a trade that has not registered, also stops the file. Driveway permits need Engineering Department approval, for which the city asks you to allow 7 days. Changes to approved plans need the building inspector’s approval first. A permit expires if work does not start within six months of issue or is not finished within one year.
Inspections in Zion
Schedule inspections with the Building Department at 847-746-4018 at least 24 hours in advance. The handouts set the stages for common jobs:
- Sheds and slabs: a pre-pour inspection before the concrete is placed, then a final inspection.
- Asphalt driveways: a base inspection and a paving inspection on separate days, with the inspector on site during paving; paver driveways need a base and a final, concrete driveways a base and a final after the forms come off.
- Roofs: a decking inspection on every tear-off.
- New buildings and changes of use: a certificate of occupancy at the end ($110 for one or two dwelling units, $110 for a change of use).
If an inspection fails because the work does not meet city ordinances, each re-inspection costs $55 and must be paid before the inspector returns. Elevator inspections are done in February and August by the state-licensed inspection company, and the city issues the certificate of inspection.
Illinois building code in Zion
Zion enforces the codes on its Building Codes page with the local amendments in Chapter 10 of the Municipal Code. FEMA’s Community Status Book lists the City of Zion (community 170399) as participating in the National Flood Insurance Program, in the regular program since January 16, 1981, with its current flood map dated October 5, 2023; the city has no Community Rating System class.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Permit search and official resources
Zion handles permit record requests through its Freedom of Information Act process. To see past permits or inspection records, file a written request in person, by mail or by email; the city answers within five business days (21 days for commercial requests), and the first 50 standard pages are free, then 15 cents a page. Building questions go to the department at 847-746-4018.
- City of Zion Building Department
- Zion forms, applications and permits
- Codes adopted by the City of Zion
- Fees Ordinance 19-O-14 (2019)
- Building permit application (2024)
- Permit process notice to contractors
- Contractor registration requirements (2024)
- Shed construction requirements
- Fence details
- Driveway and parking area requirements
- Roofing guidelines (2024)
- Zoning Board of Appeals variance application
- Zion FOIA requests
- FEMA Community Status Book, Illinois
- Illinois Capital Development Board
- Illinois Department of Public Health plumbing
Inspections are where schedules slip.
Get a free quote →Zion permit FAQs
How much is a building permit in Zion?
Most permits cost 2.2% of the construction cost with a $55 minimum; new construction pays 2.2% up to $2,000,000 and 0.75% above that. Plan review is extra: $85 flat for small residential projects and $110 an hour (minimum $220) for houses and commercial work.
Do I need a permit to replace my roof in Zion?
Yes. The fee ordinance requires a permit for roofing and chimney repair, priced at 2.2% of the cost with a $55 minimum, and a decking inspection is required on every tear-off.
Can a homeowner pull a permit in Zion?
Yes, for work on your own home if you do the work yourself (immediate family may help) and bring proof of homeowner’s insurance with at least $300,000 in liability coverage.
Do contractors have to register with the city?
Yes. Every contractor registers in person with insurance naming the city; electricians and HVAC contractors need a tested Illinois city license, plumbers a state 058 license or a Chicago license with the state 055 registration.
How tall can a fence be in Zion?
Up to 6 feet in residential areas and 4 feet in a front yard, where it must be at least 50% open; the permit is 2.2% of the cost with a $55 minimum.
Are gravel driveways allowed?
No. Driveways and parking areas must be asphalt, concrete or vehicle-rated pavers, and the permit includes a $220 engineering fee.
How do I schedule an inspection?
Call the Building Department at 847-746-4018 at least 24 hours ahead; failed inspections cost $55 to re-inspect.
Simplify Zion permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Zion sooner?
Let Alliance prepare, file, and track your Zion permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Antioch
Read guide →Beach Park
Read guide →Adams County Building Permit Guide
Read guide →Alsip Building Permit Guide
Read guide →Alton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Zion permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.