In the Village of Antioch, permits come from Building and Code Enforcement in the Community Development Department (847-395-1000), led by Community Development Director Mark Janeck. Applications are available at Village Hall, 935 Skidmore Drive, or online, and may be filed in person or by e-mail with a full scope of work. A permit generally costs 2% of the project cost, with a $62 minimum, and staff call within 5 to 10 business days when it is ready to pick up. The village does not register contractors, but it asks for license copies, insurance and bonds on the application.
What requires a building permit in Antioch?
The village asks you to consult the Building Department before any interior or exterior change to your property, and it publishes a requirement sheet for each kind of job that needs a permit. Its residential application adds sewer and water work, sidewalks and stoops, siding, three-season rooms, spas and hot tubs and cellular antennas. Purely cosmetic work, such as replacing cabinets or fixtures, needs no permit.
Permit needed
- New single-family homes, room additions and building remodels
- Basement remodeling
- Decks, patios, gazebos and pergolas
- Garages and sheds
- Fences and retaining walls
- Driveways, sidewalks and stoops
- Roof tear-offs and overlays, and siding
- HVAC and furnace work
- Swimming pools, spas and hot tubs
- Signs, demolition and commercial construction or remodeling
No permit
- Cosmetic work such as new cabinets
- Replacing fixtures
Every structure on a lot, including sheds, decks and pools, counts toward a 35% limit on lot coverage, and none may be placed in an easement.
What Antioch decides and what the state holds
Antioch adopts its own building code, and permits exist to make sure work meets the minimum standards of the village’s adopted code; the Village Code is published on American Legal. The village’s project handouts summarize requirements from the 2012 International Residential Code and the 2011 National Electrical Code, and some local rules go further than those model codes: basement wiring, for instance, must run in conduit, with no non-metallic sheathed or armored cable. Plumbing work is tied to state licenses (the application asks for the plumber’s Illinois 055 and 058 licenses), and backflow devices need a state cross-connection control device inspector (CCCDI).
Antioch building department: who handles permitting
Building and Code Enforcement, part of the Community Development Department, issues permits for building and property changes and enforces the village’s ordinances on building codes, zoning, signs and property maintenance. Its Planning and Zoning Division reviews new development within the village boundaries. The village’s website lists the Community Development Department both at Village Hall, 935 Skidmore Drive, and, as the Community & Economic Development Department, at 874 Main Street, which is also the address printed on the residential application; applications can be picked up at Village Hall. Land outside the village limits is permitted by Lake County, not Antioch.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Village Hall | 935 Skidmore Drive, Antioch, IL 60002 (applications available here) |
| Community & Economic Development | 874 Main Street, Antioch |
| Phone and fax | 847-395-1000; fax 847-395-1920 |
| Department head | Mark Janeck, AICP, Community Development Director, ext. 1324 |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
Antioch permit types
There are three application forms: the Application for New Single Family and Residential Renovation Permit, the Application for New Commercial Permit and the sign permit application. Every application must be fully completed and include a proposal or scope of work, and most also need a plat of survey. The residential form asks for the project cost, the PIN and lot number and the general contractor and each trade, and for a new house the number of stories, total cubic footage, bedrooms, bathrooms, garage stalls, square footage and construction type.
Residential permits
- Sheds. Three certified copies of the plat of survey with the shed shown, the contractor’s proposal or the shed brochure and materials list, a plan of the structural members and the homeowners’ association approval letter. A shed sits at least 5 feet from the rear and rear-side lot lines, may not be larger than the house, is ventilated and is anchored at every corner on a 4-inch slab over 4 inches of CA-6 gravel or an approved base.
- Decks. Decks may not extend past side-yard setback lines or come within 25 feet of the rear lot line unless they are less than 2 feet high, and even then they stay 10 feet back. Piers are at least 10 inches across and 42 inches deep; stairs are 36 inches wide with risers no taller than 7¾ inches; decks more than 30 inches up need a 36-inch guardrail, and those over 48 inches need diagonal bracing.
- Pools, spas and hot tubs. At least 10 feet from overhead lines, 5 feet from buried utilities and 8 feet from the house, and never in a front, corner-side or side yard; an above-ground pool stays 25 feet from the rear lot line. In-ground pools and pools under 48 inches high need a 4-foot barrier with self-closing, self-latching gates, and house doors opening onto the pool area need alarms. A spa with a locking cover needs no fence. Pool wiring runs underground in rigid metal conduit or PVC buried at least 12 inches deep on a GFCI-protected circuit, and extension cords may not power the equipment.
- Driveways. Asphalt on 6 inches of crushed limestone, or concrete 6 inches thick at the approach and public sidewalk; the drive is 4 inches wider than the garage door, at least 5 feet from the side lot line and no more than 20 feet wide at the right-of-way. Paver bricks in the right-of-way need the owner’s letter accepting responsibility for them.
- Basements. A floor plan to scale, heating and ventilation plan, plumbing drawing and electrical details, with egress windows of at least 5.7 square feet and R-11 wall insulation.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
New commercial construction needs four sets of plans with an Illinois architect’s seal covering electrical, plumbing, structural and mechanical work, and four site plans showing the top of foundation, elevations, grading, drives, utilities, erosion control and an accessible route from the accessible parking to the building and the right-of-way. Add the population equivalent from a certified engineer, the use group and construction type, the engineer’s probable cost, square footage and stories, the PIN and a recent certified plat of survey, site development plans by an Illinois professional engineer with a Watershed Development Ordinance application, a subcontractor list and a completed industrial wastewater survey. Changes to the outside of a building also need elevations, lighting details and trash enclosure and rooftop equipment details.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. New zoning cases start with one of the Planning and Zoning Division’s applications: annexation, concept plan, preliminary and final plan or plat, site plan review, special use, rezoning, variation or text amendment.
- Design standards. The village publishes single-family design standards, a Route 173 corridor plan, downtown facade guidelines and a form-based code alongside its zoning and site plan review ordinances.
- Stormwater. Commercial site development includes a Watershed Development Ordinance application and site inspections for erosion control, stormwater installation, final grading and landscaping, including any required tree replacement.
Rather talk it over?
Call 1-855-478-4290 →Antioch permit costs and fees
The village’s permit page says a permit generally costs 2% of the project cost, with a minimum fee of $62, and that other costs may apply depending on the project. Its project handouts break the minimum down as a $50 permit fee, which includes plan review and all inspections, plus a $12 filing fee. For new construction, 1% of the project cost is due when you file the application.
| Item | Fee |
|---|---|
| Typical permit | 2% of the project cost |
| Minimum permit | $50, plus a $12 filing fee ($62 in all) |
| What the permit fee covers | Plan review and all inspections |
| New construction deposit | 1% of the project cost, due at application |
| Copy of your own plat of survey (if on file) | No charge to the owner |
Worked example from the handouts: a $1,500 shed works out to $30 at 2%, which is below the minimum, so the permit is $50 plus the $12 filing fee, or $62. A $10,000 deck is 2% of the cost ($200) plus the $12 filing fee the deck handout lists, or $212. Payment is made when you pick the permit up in person, by cash, check or credit card. For anything beyond the 2% rule, call the building department at 847-395-1000, as the village’s permit page advises.
Trade permits and who may pull them
Antioch does not register contractors. Instead, the application lists what each trade must hand in:
- Electricians: a copy of the electrician’s license and an original certificate of $1 million liability insurance. For a basement remodel, a homeowner may instead sign an affidavit accepting responsibility for electrical work not done by a licensed electrician.
- Plumbers: copies of the Illinois 055 and 058 licenses.
- Excavators: an original $10,000 surety bond.
- Irrigation contractors (commercial): the state license, an original $10,000 surety bond and a letter accepting responsibility for equipment in the parkway; an RPZ backflow device needs the inspector’s CCCDI license.
- Roofers: a copy of the Illinois roofing license, asked for on both the residential and the commercial application; roof tear-offs and overlays use the residential application.
HVAC and furnace work has its own requirement sheet and is a permit type on the residential application.
Rather not deal with the building department?
Get a free quote →How to apply for an Antioch building permit
Make sure the property is inside the village; unincorporated land goes to Lake County.
Open the handout for your project (shed, deck, pool, driveway, basement and so on) and gather what it lists.
Where your subdivision has a homeowners’ association, include its approval letter.
Submit the completed form with the scope of work, plat of survey and trade documents in person or by e-mail.
Staff contact you by phone or e-mail within 5 to 10 business days when the permit is ready.
Pick the permit up in person and pay by cash, check or card; work cannot start before then.
Review, corrections and what causes delay
Applications that are not fully completed, or that come without a proposal of the work, are not processed, and staff contact you if anything else is needed before issue. Missing certified plats, a missing HOA letter, or trade documents that are copies when the village asks for originals (the excavator’s bond and the electrician’s insurance certificate) are the usual reasons a file waits.
Inspections and certificates in Antioch
The permit fee covers all inspections. The village’s handouts set out the visits for each job:
- Sheds: one inspection at completion, including the anchoring.
- Driveways: a base inspection before any asphalt, pavers or concrete, then a completion inspection.
- New commercial buildings: footing, sewer and water, backfill, underground plumbing, electrical service, rough framing with mechanical, electrical and plumbing, insulation and final, plus site inspections for erosion control, stormwater, final grading and landscaping.
- Pools: the pool may not be filled more than a third until the barrier is installed and approved, and it may not be used until the final approval.
A basement remodel permit requires work to start within 6 months and is valid for one year. Construction is allowed from 7 a.m. to 7 p.m. Monday through Saturday and from 9 a.m. to 6 p.m. on Sundays and holidays. When emptying a pool, discharge the water onto your own yard, never to storm drains or wetlands.
Illinois building code in Antioch
Antioch enforces the codes adopted in its Village Code. FEMA’s Community Status Book lists the Village of Antioch (community 170358) as participating in the National Flood Insurance Program, with a current flood map dated September 18, 2013; the village is not in the Community Rating System.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Antioch building permit FAQs
How much is a building permit in Antioch?
Generally 2% of the project cost, with a minimum of $62 ($50 plus a $12 filing fee); new construction pays 1% of the cost at application.
Does Antioch register contractors?
No. The application asks instead for license copies, insurance certificates and, for excavators, a $10,000 bond.
Can I e-mail my application?
Yes. Applications may be submitted in person or by e-mail, but the permit is picked up and paid for in person.
How far must a shed be from the lot line?
At least 5 feet from the rear and rear-side lot lines, and never in an easement.
What are Antioch’s construction hours?
7 a.m. to 7 p.m. Monday through Saturday, and 9 a.m. to 6 p.m. on Sundays and holidays.
How do I get copies of old permits for my house?
Owners can ask the building department for the file and a free copy of a plat on file; anyone else needs a Freedom of Information Act request.
Antioch permit search and official resources
The building department keeps permit files by address under the Secretary of State’s retention schedule. A property owner can call and ask staff to pull the file, and gets a copy of the plat of survey free if one is on file. Real estate agents, buyers and contractors need a Freedom of Information Act request, sent in writing to the village’s FOIA Officer at 935 Skidmore Drive, by e-mail, or through the online citizen action line; the village responds within 5 business days unless it takes an extension the Act allows.
Inspections are where schedules slip.
Get a free quote →- Building and Code Enforcement
- Application for new single-family and residential renovation permit
- Application for new commercial permit
- Commercial new construction requirements
- Shed requirements
- Deck construction requirements
- Swimming pool, spa and hot tub requirements
- Driveway and parking lot requirements
- Basement remodeling requirements
- Planning and Zoning applications and ordinances
- Freedom of Information directory
- FEMA Community Status Book, Illinois
Simplify Antioch permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Antioch sooner?
Let Alliance prepare, file, and track your Antioch permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Beach Park
Read guide →Buffalo Grove
Read guide →Arlington Heights Building Permit Guide
Read guide →Aurora Building Permit Guide
Read guide →Barrington Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Antioch permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.