In the Village of Buffalo Grove, building permits come from Building & Zoning Services in the Department of Community Development, 50 Raupp Boulevard (847-459-2530, permits@vbg.org), open Monday to Friday, 8 a.m. to 4:30 p.m. The process is paperless: you apply, pay and book inspections in the village’s BS&A portal. Simple jobs such as a water heater or roof can be issued the same day, Express permits take about 5 business days and Standard permits about 10. Most home projects carry a flat fee, such as $85 for a fence or roof.
What requires a building permit in Buffalo Grove?
Buffalo Grove requires a permit to build or alter any structural, electrical, gas, mechanical or plumbing work, inside or outside, at homes and at businesses alike. Cosmetic work such as painting and new flooring is the main exception.
Permit needed
- Kitchen, bathroom and basement remodels; additions; new construction
- Fences, patios, landings, walkways, retaining walls, driveways and aprons
- Decks, sheds, gazebos and pergolas
- Pools, spas, hot tubs, ponds and any water feature 24 inches deep or more
- Roof replacement, window replacement, foundation repairs, demolition
- Air conditioners, furnaces, water heaters, radon mitigation, solar panels, EV chargers, lawn irrigation
No permit
- Painting, flooring and other cosmetic work
- Siding, gutters, soffits and fascia
- Pop-up or French drains kept within 10 feet of the house
- Tree removal on private property
- Swing sets, play equipment, basketball hoops and dumpsters kept on private property
- Fence repairs of up to 3 posts or 2 sections
Unsure? Call 847-459-2530. Outdoor construction is allowed from 7 a.m. to 7 p.m. Monday to Friday and from 8 a.m. to 7 p.m. on Saturdays and Sundays under Section 9.38.037 of the village code.
What Buffalo Grove decides and what the state holds
The village writes its own building rules. It enforces the 2018 International Building, Residential, Mechanical, Fuel Gas, Existing Building, Fire and Property Maintenance Codes and the 2017 National Electrical Code, each with local amendments in Title 15 (Buildings and Construction) of the Buffalo Grove Municipal Code; Title 14 holds the sign code and Title 17 the zoning ordinance. The 2014 Illinois Plumbing Code, the Illinois energy code (2024 IECC with state amendments) and the 2018 Illinois Accessibility Code come from the state. Fees, contractor registration, construction hours and zoning limits are the village’s own.
Buffalo Grove building department: who handles permitting
Building & Zoning Services reviews plans, issues permits and inspects work everywhere inside the village limits, including the parts of Buffalo Grove that lie in Cook County. It is one of three divisions of the Department of Community Development, alongside Planning and Development and Environmental Health Services; Nicole Woods is the Director of Community Development. Unincorporated land next to the village is permitted by Lake County or Cook County, not by Buffalo Grove, so check the address before you file.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building & Zoning Services, Department of Community Development, 50 Raupp Boulevard, Buffalo Grove, IL 60089 |
| Phone and e-mail | 847-459-2530; permits@vbg.org |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
| Department head | Nicole Woods, Director of Community Development (847-459-5539) |
| Portal | BS&A Online: apply, check status, pay, request inspections |
| After-hours water or sewer inspections | Police non-emergency line, 847-459-2560 (24 hours) |
Buffalo Grove permit types
Every permit falls into one of three review tracks. A Same Day permit can be issued on the day you apply online if everything is correct; an Express permit takes about 5 business days; a Standard permit, which goes through several departments, takes about 10 business days, and larger commercial projects can take longer.
| Track | Typical projects |
|---|---|
| Same Day | Air conditioner, furnace, radon mitigation, roof, sewer repair, water heater, windows |
| Express (about 5 days) | Boilers, driveway or apron, electrical, elevator, EV charger, fence, fire alarm, fire suppression, foundation repair, generator, interior draintile, lawn sprinkler, low voltage, mechanical, patios, walks and landings, plumbing, retaining wall, signs, tents |
| Standard (about 10 days) | Accessory structures, additions, basement remodel, demolition, fire or water damage repair, foundation, new construction, parking lot, remodeling, solar panels, swimming pools, water and sewer service |
Residential permits
- Fences. Apply with the fence Affidavit of Compliance, a plat of survey marking the fence and its lengths and heights, the contractor’s scope (style, materials, height) and any HOA approval. Fences may be 6 feet tall, but solid fences stop at 5 feet unless the lot abuts non-residential or multi-family zoning, a major street, a park or a railroad, or a variation is granted; anything over 5 feet must be an open design such as board-on-board.
- Pools, spas and hot tubs. The plat must show the pool at least 6 feet from every property line and off all easements, plus the equipment, any barrier and the ComEd supply line; add the manufacturer’s specifications. In-ground pools also need sealed drawings by an Illinois licensed professional and a grading plan. Pools count as accessory structures: none in front or corner side yards, and all accessory structures together may cover no more than 20% of the rear yard. Barriers are at least 48 inches high.
- Owners doing their own work file the Affidavit of Compliance – Homeowner with a list of their qualifications.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial additions, new buildings, remodels and parking lots are Standard permits with several departmental reviews, and big projects may run past 10 days. Business owners doing their own work file the Affidavit of Compliance – Business Owner. The village may add the cost of outside consultants for commercial plan review and inspection to the permit, or collect it before the certificate of occupancy.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Development review. New developments start with a staff concept plan meeting and concept reviews by the Village Board and the Planning and Zoning Commission; a preliminary plan then goes to a public hearing before the commission and a final Village Board vote, and building permits follow final engineering.
- Engineering. Right-of-way work ($750 plus a $1,000 refundable bond), water and sewer services and sump pump connections to the storm sewer ($1,200) are Engineering Department permits; a site development permit lapses if work does not start within 180 days or finish within a year.
Buffalo Grove permit costs and fees
Buffalo Grove publishes its Building Permit Fees list on the village website and as a four-page PDF from the Department of Community Development. Most residential permits carry a flat fee; additions, new buildings and commercial work are charged as a percentage of valuation, and the village uses the higher of the valuation you submit or the ICC building valuation calculation.
| Project | Fee |
|---|---|
| Fence; sewer or water service repair; window replacement (same size); one- and two-family roof | $85 each |
| Air conditioner, furnace or water heater | $65 per unit |
| Driveway and/or apron | $100 |
| Shed, pergola or other residential accessory structure | $100 (detached garage $400) |
| Residential patio, walks, landings | $100, plus $100 for low voltage and $100 for gas piping if any |
| Residential electric-only, plumbing-only or mechanical-only | $100 |
| Bathroom remodel / kitchen remodel | $200 / $350 |
| Residential remodel: minor / intermediate / major | $200 / $450 / $800 |
| Basement remodel: minor / intermediate / major | $300 / $750 / $1,000 |
| Covered porch / unconditioned addition | $200 / $500 |
| Conditioned residential addition | 1.75% of valuation ($200 minimum) |
| New residential construction | 1.75% of valuation up to $500,000, plus 1% from $500,001 to $10 million, plus 0.5% above ($500 minimum) |
| Non-residential new construction, additions and remodels | 2% of valuation up to $500,000 plus 1.25% above ($500 minimum) |
| Swimming pool: above-ground or hot tub / in-ground | $200 / $400 |
| Solar energy system, residential | $400 |
| Residential demolition (structure or interior) | $150 |
Rather talk it over?
Call 1-855-478-4290 →Worked example. A conditioned addition to a house valued at $100,000 is charged 1.75% of valuation: $100,000 × 1.75% = $1,750, well above the $200 minimum. A bathroom-only remodel is a flat $200, but windows, a furnace or a new electrical panel installed as part of it need their own permits and fees.
Related charges
- Re-inspections: $60 for the third or later inspection of the same type, and $60 for a no-show or a cancellation made with less than 24 hours’ notice.
- Amendments: $50 per discipline when a change to approved plans needs review by two or more disciplines.
- Work started without a permit: double the original permit fee, at least $50 and at most $1,000.
- Cancelling a permit: 25% of the original fee, with a $50 minimum.
- Extensions: 50% of the original permit fee, for half the original permit period.
- Contractor registration: $75 per trade per year, waived for trades the state licenses.
The new construction fee does not cover occupancy charges, donations or fees set in a development agreement.
Trade permits and who may pull them
Electrical, plumbing, mechanical, low-voltage, fire alarm and fire suppression work each have their own permit type in BS&A, and every contractor on a job must be registered with the village for the current calendar year before the permit is issued. Registration runs January 1 to December 31, costs $75 per trade and is filed by e-mail to permits@vbg.org or at Village Hall.
- State-licensed trades (alarm, elevator, fire suppression, irrigation, plumbing, radon and roofing) send a copy of the current Illinois license and pay no registration fee. Plumbing contractors show a state 058 license or a City of Chicago license plus the state 055 plumbing contractor registration.
- Electricians show a current electrical license or registration; Buffalo Grove honors registrations from any Illinois municipality that gives a written exam before issuing them.
- Solar installers show the Illinois Commerce Commission’s Certificate of Service Authority as an installer of distributed generation.
- Homeowners may do their own work in most cases by signing the homeowner affidavit, which says they will not have anyone else do the work and lists their qualifications; it does not guarantee approval. Plumbing in multi-family buildings must be done by a licensed plumber, and for single-family homes the affidavit requires that the owner has owned the property for at least six months and lives there as a primary residence.
Rather not deal with the building department?
Get a free quote →The posted registered contractors list is refreshed every 30 to 60 days; staff confirm each contractor’s status at application.
How to apply for a Buffalo Grove building permit
Make sure the address is inside Buffalo Grove; unincorporated land is permitted by Lake County or Cook County.
Each project type has a guideline page with its checklist, review time, fee and inspections.
Every contractor needs a current-year village registration; owners doing the work sign the homeowner affidavit.
Create an account and submit the application with the plat of survey, drawings and contractor proposal.
If anything is not approved, you receive a review letter and must reply in writing with corrected plans.
Pay through the e-mailed link; the permit and approved plans arrive by e-mail, and the permit is posted where it can be seen from the street.
Request each inspection online or by phone at least 48 hours ahead and keep the approved plans on site.
Review, corrections and what causes delay
The clock starts only once everything required is in, so a missing plat, an unregistered contractor or an unsigned affidavit holds the file. Changes after approval, including a change of contractor, need an amendment, and no further inspections are scheduled until it is approved. A permit about to expire can be extended by the Building Official for justifiable cause, on a written request that explains the hardship, lists the work left with a timeline and says how unfinished parts will be protected from the weather.
Inspections and certificates in Buffalo Grove
Request inspections in the BS&A portal using the permit number (in the form P-year-number), or call Community Development at 847-459-2530. Give at least 48 hours’ notice for every inspection; only sewer and water repairs and emergencies are exempt, and water or sewer inspections needed after hours or on a weekend go through the 24-hour police non-emergency line, 847-459-2560.
- Fences: a posthole inspection for any fence over 5 feet, then a final.
- Pools, spas and hot tubs: rough and final electrical, structural, and plumbing or gas line where they apply.
- Re-inspections: the third or later visit of the same type costs $60, as does a missed or late-cancelled appointment.
- Occupancy: outside review and inspection costs on commercial buildings may be collected before the certificate of occupancy.
Want this handled start to finish?
Get a free quote →Illinois building code in Buffalo Grove
Buffalo Grove applies the codes listed on its Building Codes page, with its amendments in Title 15 of the municipal code. FEMA’s Community Status Book lists the Village of Buffalo Grove (community 170068, Lake and Cook counties) as participating in the National Flood Insurance Program, with a current flood map dated September 18, 2013; the village has been in the Community Rating System since October 1, 2021 at class 7, worth a 15% flood insurance discount.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Buffalo Grove building permit FAQs
Do I need a permit to replace my roof or windows in Buffalo Grove?
Yes. A one- or two-family roof replacement and a same-size window replacement are each $85, and both are Same Day permits when the application is complete.
How much is a fence permit?
$85, with a 3 to 5 business day review. Repairs of up to 3 posts or 2 sections need no permit.
Can I install my own water heater or furnace?
Owners may do most of their own work by filing the homeowner affidavit, but plumbing in multi-family buildings needs a licensed plumber, and for single-family homes the affidavit requires six months of ownership and that the house is your primary residence.
Do contractors have to register?
Yes, every year, at $75 per trade; state-licensed trades such as plumbers and roofers register free with a copy of their license.
Does an inflatable kiddie pool need a permit?
The village’s pool page includes children’s inflatable pools and ponds among the features that need a permit when the water level reaches 24 inches or more. Above-ground pools and hot tubs cost $200 and in-ground pools $400.
How long is a permit good for?
Most permits expire after 180 days if the work is not finished; roofs, furnaces and water heaters after 90 days, and additions and new homes after 365 days.
Buffalo Grove permit search and official resources
Check the status of a permit by logging in to the village’s BS&A portal. For older permits, plans and other records, search the village’s Public Document Portal first (it holds public records other than police reports); if what you need is not there, file a Freedom of Information Act request through the village’s online FOIA portal. The FOIA Directory lists which department keeps which records.
Inspections are where schedules slip.
Get a free quote →- Permits and inspections
- Building & Zoning resources and forms
- Building permit fees
- Building permit fees (PDF)
- Current building codes
- Contractor registration application
- Affidavit of compliance – homeowner
- Fence permit guideline
- Swimming pools, spas and hot tubs guideline
- Development process
- Department of Community Development
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
- Illinois Capital Development Board
- Illinois Department of Public Health – Plumbing
Simplify Buffalo Grove permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Buffalo Grove sooner?
Let Alliance prepare, file, and track your Buffalo Grove permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Deerfield
Read guide →Fox Lake
Read guide →Bureau County Building Permit Guide
Read guide →Burr Ridge Building Permit Guide
Read guide →Calumet City Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Buffalo Grove permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.