In the Village of Fox Lake, building permits come from the Community Development Department at Village Hall, 66 Thillen Drive (847-587-3176), led by John Schuldt, Director of Community Development and Building Commissioner. Send the application, plat of survey, site plans and construction drawings to permit@foxlake.org or bring them to Village Hall; the first plan review comes back within 10 business days. Most permits last six months. Any project that disturbs soil in a designated floodplain needs approval from the Illinois Department of Natural Resources before the village will take the application.
What requires a building permit in Fox Lake?
Fox Lake requires a permit for all new construction, additions and alterations to homes and commercial buildings, and for any structural, electrical, mechanical or plumbing work. Tree removal needs a permit too, under the village’s Trees and Woodlands Preservation Ordinance. The village’s brochure and permit page list the common projects; neither list is complete, so call Community Development at 847-587-3176 about anything not shown.
Buildings and exterior
- New buildings, additions, porches, covered porches and basement remodels
- Garages, sheds, carports, gazebos, pergolas and chicken coops
- Decks, patios, walkways, stoops, sidewalks and driveways or parking lots
- Fences, retaining walls over 4 feet and seawalls
- Roofing (tear-off or re-roof), siding, and new or replacement windows and doors
- Demolition (structural and interior), foundation repair, culverts, grading, fill and drainage
Systems and other work
- Electrical work and service upgrades, generators
- Furnace and air conditioner replacement and other HVAC work
- Water heater replacement and other plumbing
- Sewer and water service, new or repair
- Fireplaces and wood-burning stoves, insulation, lawn irrigation
- Swimming pools, hot tubs and spas; tree removal
Any work in a floodplain or near a wetland also needs a Watershed Development Ordinance (WDO) permit, and any soil disturbance in a designated floodplain, even for a fence or patio, needs IDNR approval before you apply. Construction is allowed from 7 a.m. to 8 p.m. Monday to Saturday and from 10 a.m. to 5 p.m. on Sundays and legal holidays.
What Fox Lake decides and what the state holds
Fox Lake adopts its own building codes and sets its permit fees by village ordinance. Its Building Codes page lists the 2021 International Residential, Building, Existing Building, Fire, Mechanical, Fuel Gas and Property Maintenance Codes, the 2020 National Electrical Code and the 2024 International Energy Conservation Code, together with the village subdivision ordinance and the Lake County Watershed Development Ordinance. (An older village brochure still lists 2015 editions; the Building Codes page is the newer list.) The 2014 Illinois Plumbing Code and the Illinois Accessibility Code are state codes, and construction in an IDNR-regulated floodway or floodplain needs the state agency’s approval first.
Short on time to read all of this?
Get a free quote →Fox Lake building department: who handles permitting
The Community Development Department reviews plans for architectural, civil, fire and zoning requirements, issues building permits and inspects the work for property in the Village of Fox Lake, whether the parcel is in Lake County or McHenry County and in Grant, Burton or Antioch township; the application asks for the county and township along with the parcel number. Plumbing inspections are booked through the department but carried out by the Lake County plumbing inspector. Land outside the village limits is permitted by Lake County or McHenry County. The department’s pages also cover business licenses, the facade improvement program, residential rentals, vacant property registration and short-term rentals.
| Detail | Information |
|---|---|
| Office | Community Development Department, Village Hall, 66 Thillen Drive, Fox Lake, IL 60020 |
| Phone and fax | 847-587-3176; fax 847-587-3980 |
| E-mail submittals | permit@foxlake.org |
| Hours | Monday to Friday, 8 a.m. to 5 p.m. (permit pick-up in the same hours) |
| Department head | John Schuldt, Director of Community Development / Building Commissioner |
| IDNR floodplain contact | IDNR Bartlett office, 847-608-3116 |
Fox Lake permit types
One village permit application covers most work. You tick the purpose (residential, commercial, addition, alteration, new construction, accessory structure, culvert, deck, demolition, driveway, electrical service, fence, foundation, gazebo or pergola, grading, HVAC, irrigation, parking lot, patio or walkway, seawall, swimming pool, water or sewer service, window or door), give the valuation and the square footage of the main building and of the project, and list the general, electrical, mechanical, plumbing and roofing contractors. Separate forms cover tree removal, signs, permit extensions, the Watershed Development Ordinance permit and the bond waiver.
Residential permits
- Minor permits are reviewed in about five business days, the village’s preferred timeframe.
- New houses and additions are reviewed in about ten business days, longer if they need Watershed Development review.
- Tree removal uses its own application listing each tree’s location, trunk diameter, species and reason for removal; if a trunk straddles a property line, include the neighbor’s letter of consent. Removing a tree before the permit is issued brings a fine of twice the permit fee.
- Permit extension. Use the village’s permit extension application before the six-month permit lapses.
- Bond waiver. With this form the property owner accepts responsibility for any damage and holds the village harmless.
- Homeowners associations. The village does not review or coordinate HOA rules; get any HOA approval separately.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial permits take about 10 to 15 business days for review, plus any Watershed Development review, and go through the same application with the commercial box ticked. Businesses also need a village business license, and the department publishes a parking lot landscape guide and runs a facade improvement program. Fire requirements are part of the plan review.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- IDNR floodplain approval. For soil disturbance in a designated floodplain, first get an IDNR permit, a letter saying none is needed, or confirmation the work falls under a statewide permit; the village can tell you whether the site is in the floodplain. Then e-mail that document with the village application, drawings, specifications and scope of work to permit@foxlake.org.
- Watershed Development Ordinance permit. Required when the project is in a floodplain or flood-prone area, may affect a wetland, will disturb more than 5,000 square feet, or changes site drainage. Floodplain submittals carry extra requirements and fees, and the office section of the application records floodplain, wetland and substantial-improvement status.
- Zoning. Check the parcel on the village’s online zoning map; the Planning & Zoning Commission posts its agendas, minutes and packets on the village site.
- Right-of-way. Work in village streets or parkways uses the Public Works right-of-way and utility permit.
Fox Lake permit costs and fees
Fox Lake’s permit fees are established by village ordinance, and neither its permit page nor its brochure prints the rate table. The fee is calculated during review and you are told the amount due when the permit is approved. The permit application shows the charges that can make up the total:
| Charge | What it covers |
|---|---|
| Building | The building permit itself |
| Plumbing, electrical, mechanical | Trade work on the permit |
| Plan review | Village plan review; outside review fees are also charged |
| Engineering, stormwater (S/W), WDO | Engineering, stormwater and Watershed Development Ordinance review |
| Impact | Impact fees where they apply |
| Other | Any other charge set by ordinance |
Rather talk it over?
Call 1-855-478-4290 →The fee rules the village does publish:
- Plan review is owed either way. By signing the application you agree to pay all plan review and outside review fees whether or not a permit is issued.
- Extensions: $50, granted at the Community Development Director’s discretion.
- Floodplain projects: additional village fees apply; questions about IDNR’s own fees go to IDNR.
- Tree removal without a permit: a fine of twice the original permit fee.
- Payment: cash, check or credit card at Village Hall; cards are not accepted over the phone.
To budget a project, give Community Development the valuation and square footage from your application and ask for the fee before you file.
Trade permits and who may pull them
Electrical, mechanical, plumbing and roofing work is listed on the same application as the building work, with a separate line for each contractor’s name, address, phone and e-mail; more contractors go on an extra page. The submittal checklist includes the village’s contractor requirements, which Community Development checks before plan review starts.
- Plumbing follows the Illinois Plumbing Code, and plumbing inspections are carried out by the Lake County plumbing inspector after you book them with the village.
- Roofing contractors are licensed by the state; name the roofer on the application.
- Electrical work is reviewed under the 2020 National Electrical Code listed on the village’s Building Codes page, and service upgrades need a permit.
- Owners who hire contractors remain responsible for getting every inspection done and the permit closed out.
Businesses working in the village may also need a Fox Lake business license, which is a separate application from the building permit.
Rather not deal with the building department?
Get a free quote →How to apply for a Fox Lake building permit
Confirm the parcel is in the village and ask Community Development whether it is in a floodplain or near a wetland.
For floodplain soil disturbance, obtain IDNR’s decision first; file the WDO permit where it applies.
Completed application, contractor information, a current plat of survey, two sets of site plans and two sets of construction documents.
E-mail the packet to permit@foxlake.org or bring it to Village Hall, 66 Thillen Drive.
The inspector sends comments; fix and resubmit anything flagged before the permit is issued.
Pay the fees and collect the permit placard, Monday to Friday, 8 a.m. to 5 p.m.; post it where it is visible from the street.
Book each inspection at least 24 hours ahead and make sure the permit is finaled.
Review, corrections and what causes delay
The village’s preferred turnaround is about five business days for minor permits, ten for new single-family homes and additions and ten to fifteen for commercial and industrial work, and its permit page commits to first review comments within ten business days. Watershed Development review adds time, and floodplain projects cannot even be filed until IDNR has answered. Site plans can be drawn on an aerial photo, a plat of survey or a septic plan as long as they show the required information; a site plan checklist is available at the front counter. The village stresses that timely review depends on complete forms submitted with all the required materials.
Inspections and certificates in Fox Lake
Call Community Development at 847-587-3176 with the address and permit number at least 24 hours before you need an inspection. Inspections run Monday to Friday from 9 a.m. to 4 p.m., and the village aims to arrive within 15 minutes of the scheduled time. Plumbing inspections are scheduled through the same office and performed by the Lake County plumbing inspector.
- Placard: keep the permit placard displayed where it can be seen from the street for the whole project.
- Owner’s responsibility: the owner or agent must make sure every required inspection is done and passed and the permit is closed out, even when a contractor does the work.
- Expiration: most permits expire six months after issue (temporary permits after 30 days); ask for an extension before the date passes.
Illinois building code in Fox Lake
Fox Lake enforces the codes on its Building Codes page together with the Lake County Watershed Development Ordinance. FEMA’s Community Status Book lists the Village of Fox Lake (community 170362, McHenry and Lake counties) as participating in the National Flood Insurance Program, with a current flood map dated February 17, 2016; the village is not in the Community Rating System.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Fox Lake building permit FAQs
Do I need a permit to replace my water heater or furnace in Fox Lake?
Yes. Water heater, furnace and air conditioner replacements are all on the village’s list of permit work.
Do I need a permit for a fence or patio near the lake?
Yes, and if the lot is in a designated floodplain you must get IDNR approval before applying to the village; a Watershed Development permit may also be needed.
Can I e-mail my permit application?
Yes. Send the application and plans to permit@foxlake.org, or deliver them to Village Hall at 66 Thillen Drive.
How long does a permit take?
About five business days for minor permits, ten for new homes and additions, and ten to fifteen for commercial work, with first comments within ten business days.
Do I need a permit to cut down a tree?
Yes. Fox Lake requires a tree removal permit, and removing a tree before it is issued brings a fine of twice the permit fee.
How long is a permit valid?
Six months for most permits; an extension costs $50 and is at the director’s discretion.
Which building codes does Fox Lake use?
The village’s Building Codes page lists the 2021 International Residential and Building Codes and related 2021 codes, the 2020 National Electrical Code, the 2024 energy code and the 2014 Illinois Plumbing Code.
Who inspects plumbing?
The Lake County plumbing inspector, booked through the village’s Community Development Department.
Fox Lake permit search and official resources
For the status of a pending permit, call Community Development at 847-587-3176. Copies of past permits and other village records are requested under the Freedom of Information Act through the village’s online Transparency Portal form or by e-mail to foia@foxlake.org, with the full request written in the body of the message, since attachments cannot be opened.
To check how a parcel is zoned, use the village’s online zoning map, and have the parcel number (PIN) and county ready for the application; Community Development can also tell you whether the site lies in a floodplain.
Inspections are where schedules slip.
Get a free quote →- Permit information
- General permit information brochure
- Permit application
- Applications and forms
- Adopted building codes
- Floodplain and stormwater information
- Tree removal application
- Construction hours
- Staff directory
- How to file a FOIA request
- FEMA Community Status Book, Illinois
- Illinois Capital Development Board
- Illinois Department of Public Health – Plumbing
Simplify Fox Lake permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Fox Lake sooner?
Let Alliance prepare, file, and track your Fox Lake permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Grayslake
Read guide →Highland Park
Read guide →Franklin Park Building Permit Guide
Read guide →Fulton County Building Permit Guide
Read guide →Geneva Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Fox Lake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.