In the Village of Franklin Park, the Building Department at Village Hall, 9500 Belmont Avenue (847-671-8245), issues permits for almost every interior and exterior job, from fences and roofs to electrical, plumbing and HVAC work. You can apply through the village’s Accela online system or on the printed forms, and every contractor and subcontractor must hold an annual village license ($100, or $250 for a general contractor) backed by a $10,000 bond. The village enforces the 2021 International Codes and the 2020 National Electrical Code under Ordinance 2526-VC-23, passed on September 2, 2025.
What requires a building permit in Franklin Park?
The village asks for a permit for nearly all residential, commercial and industrial work. Its building pages name carpentry, concrete, plumbing, fencing, roofing, masonry, solar panels, signs, electrical, fire safety and HVAC, and for businesses also build-outs and renovations.
Permit needed
- New buildings, additions, garages, sheds, decks, porches and stoops
- Fences, driveways, aprons, curbs, sidewalks, walkways and concrete pads
- Roofing, windows (including bay, bow and garden units), awnings and canopies
- Electrical work, solar panels, central air units, furnaces and other HVAC
- Plumbing and sewer work, pools, antennas and towers
- Signs, including replacement signs, and demolition
Village registrations and inspections
- Occupancy permit before a new owner or tenant moves into a commercial or industrial space
- Pre-sale inspection when any property is listed for sale
- Rental, multi-dwelling and deed amendment inspections
- Vacant building registration
- Dumpsters and portable storage units (PODs)
- Home business, small wireless facility and temporary event permits
The 2025 code ordinance strikes out the model codes’ own list of permit-free work and points to the Village Code instead, so no job should be treated as exempt without asking the department first. If you think someone is working without a permit, the department takes reports at 847-671-8245 or by email to inspections@vofp.com.
What Franklin Park decides and what the state holds
As a municipality, Franklin Park chooses its own codes and amends them. Ordinance 2526-VC-23 adopted the 2021 International Building, Residential, Mechanical, Fuel Gas, Fire, Property Maintenance, Energy Conservation and Swimming Pool and Spa Codes and the 2020 National Electrical Code, all with village amendments. Plumbing follows the 2014 Illinois Plumbing Code and accessibility the 2018 Illinois Accessibility Code with ICC/ANSI A117.1, both state codes. The village also sets its own permit fees, licenses contractors, runs the zoning code in Title 9 and the flood rules in Title 8, Chapter 5.
The local amendments go further than the model codes in places. An existing building of 6,000 square feet or more must install automatic sprinklers and a fire alarm system when its occupancy classification changes, and storing more than 15 cubic feet of lithium-ion or lithium metal batteries needs a fire permit.
Short on time to read all of this?
Get a free quote →Franklin Park building department: who handles permitting
The Building Department handles permits, plan review, inspections, contractor licenses and property maintenance for the whole village; the Cook County Department of Building and Zoning covers only unincorporated land and has no role inside Franklin Park. Zoning is a separate office within Community Development and Zoning, led by Director Nicholas Walny, and flood questions go to the Engineering Department.
| Office | Details |
|---|---|
| Building Department | Village Hall, 9500 Belmont Avenue (second floor), Franklin Park, IL 60131; 847-671-8245; fax 847-671-8790 |
| Village Hall hours | Monday to Friday, 8 a.m. to 4:30 p.m.; main line 847-671-4800 |
| Online permitting | Accela Citizen Access (contractor licenses, permits, inspections) |
| Zoning | Community Development and Zoning, 847-671-8227 (zoning questions 847-671-8278) |
| Floodplain | Engineering Department, 847-671-8304 |
| Fire Prevention Bureau | 847-671-8798 |
Franklin Park permit types
The online system takes contractor licenses, permit applications and inspection requests; the fillable PDF forms are still accepted at the counter.
Residential permits
- Building permit (form DIS1004). One application covers the building work and lists every trade contractor, from carpenter and mason to roofer, plumber, sewer layer and HVAC installer. You give the job cost, say whether the lot is in a flood zone, and add the property index number from the tax bill.
- Electrical permit (form DIS1006). Filed separately, with the electrical contractor’s registration number, where it is registered and its expiry date.
- Solar panels need both a building and an electrical permit, four sets of sealed drawings, a marked-up plat of survey and, for roof arrays, structural calculations showing the roof can carry the load. Ground arrays add a grading plan and the distance to two lot lines. Fire, building and electrical staff each review them.
- Second-floor additions on an existing slab or crawl space need engineering specifications for the foundations and footings.
- Demolition needs a Cook County demolition permit first, and the demolition contractor must post a $50,000 bond.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial build-outs, renovations and new buildings use the same building permit form, with the use group, construction type, occupant load and floor areas filled in, and drawings sealed by an Illinois architect or structural engineer. Fire alarm, sprinkler and other fire protection work goes on the fire permit application. Every new or replacement sign needs a sign permit, and the village inspects signs and elevators each year. Before a business opens, or when an existing one changes owner or name, it needs an occupancy permit: the packet and a “use letter” go to the Building Department, which routes them to Zoning, and food businesses also get a health inspection.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The zoning ordinance in Title 9 was rewritten and took effect on September 1, 2022; the interactive zoning map shows each lot’s district.
- Zoning Board of Appeals. Variances, conditional uses, amendments and subdivisions are heard by the ZBA on dates set in a published 2026 calendar, and a complete application is due about a month before its hearing. The packet lists every property within 250 feet (the Leyden Township Assessor supplies the addresses free), and a sign facing the main road goes up at least 15 days before the hearing; the findings then go to the Village Board, normally within 30 to 60 days.
- Floodplain. Any development in a mapped special flood hazard area needs a development permit under Title 8, Chapter 5, and the application warns that flood-zone lots can bring extra engineering fees and review time. The Engineering Department issues written flood-zone determination letters.
- Plat of survey. A current survey is required for most exterior work, including fences, garages, sheds, decks, patios, pools, driveways, sidewalks, central air units and room additions.
Franklin Park permit costs and fees
Building permit fees are set in the Village Code, which the department links as its fee structure, and are worked out from the job valuation; staff tell you the total when the permit is ready to collect, and you pay at pickup. The application shows the parts that can appear on one permit: a building fee, a processing fee, mechanical, plumbing and sewer, fire, third-party review and engineering fees, and a penalty fee where work began before the permit. Re-inspection fees apply after repeated failed inspections or no-shows, and water connections and surveys can carry their own charges. The license, sale and zoning fees below are printed on the village’s own forms.
| Item | Fee |
|---|---|
| Contractor license, each trade (May 1 to April 30) | $100 a year; no half-year licenses |
| General contractor license | $250 a year |
| Plumbing contractor with a state license | No charge |
| License and permit bond | $10,000 ($50,000 for demolition contractors) |
| Pre-sale inspection, single dwelling / two units | $100 / $125, plus $25 for each further unit |
| Pre-sale inspection, commercial districts | $100 up to 2,500 sq ft; $200 to 10,000; $300 above |
| Pre-sale inspection, industrial districts | $240 up to 10,000 sq ft, rising to $600 above 100,000 |
| Transfer stamp, one to three residential units | $80 |
| Variance, commercial or industrial district | $500 per application |
| Variance, residential / residential yard variance | $250 / $125, plus postage and notice costs |
| Work after a stop-work order | $100 the first day, $200 the second, $500 the third, $750 each later day |
Rather talk it over?
Call 1-855-478-4290 →Zoning fees are non-refundable once an application is filed. The forms print no building permit rates, so ask the department for a quote on a given valuation.
Trade permits and who may pull them
Franklin Park licenses every contractor and subcontractor who works in the village, and a permit cannot list an unlicensed firm. Each one files the contractor license application with a $10,000 license and permit bond and a certificate of liability insurance of at least $1 million, both naming the village as certificate holder, and the original bond is mailed in. Subcontractors working under a general contractor also send a letter of intent on company letterhead to be added to the permit.
- Electricians: the village code requires registration or a license from an Illinois body that has an electrical commission and tests its applicants, such as the City of Chicago or a neighboring testing town approved by the village; the director of inspectional services decides whether to accept a given license.
- Plumbers: plumbing follows the state code and is done by state-licensed plumbers; the village asks for a copy of the IDPH license or the $20,000 IDPH bond, and does not charge plumbing contractors for the village license. A letter of intent with the job address and scope, stamped with the corporate seal, is also required.
- Roofers give a copy of their Illinois roofing license, and sewer and drain layers a copy of their city license.
An owner may act as general contractor on their own property by signing the owner section of the application. Owners asking for residential plumbing or electrical permits must submit detailed drawings with specifications and dimensions, sometimes from a design professional, which the plumbing or electrical inspector reviews, and the owner takes a quiz to show they can do the work.
Rather not deal with the building department?
Get a free quote →How to apply for a Franklin Park building permit
Call 847-671-8245 or visit the second floor of Village Hall; staff ask what you plan to build and where, and explain the codes and zoning rules that apply.
Make sure each contractor has a current village license for the May-to-April year, with its bond and insurance on file.
Check the lot’s district on the zoning map, and file with the ZBA if the project needs a variance or conditional use.
Apply online through Accela or on form DIS1004 (and DIS1006 for electrical), with the job cost, contractors and property index number.
Add the plat of survey, two paper sets of drawings plus one digital copy, and the contractor’s proposal; commercial and structural work needs sealed drawings.
Staff call when the permit is ready; pay the fee, pick up the permit card and post it on site.
Review, corrections and what causes delay
Building staff check each application against the construction codes, the zoning ordinance and the Engineering Department’s rules. The application says processing takes at least five days and longer for bigger jobs; the solar sheet allows ten working days for plan review and another ten for each resubmittal, with written answers to every comment. A permit that fails review is refused, and the applicant can correct the plans or appeal. Common holdups are an unlicensed contractor on the form, a missing survey, a lot in the flood zone, or a demolition without the county permit. Changes after approval are reviewed the same way as the original application.
Inspections and occupancy in Franklin Park
Every permitted job is inspected, and the permit lists the inspections it needs. Call 847-671-8245 at least 24 hours ahead with the permit number and address, or book through the online system. An inspector who finds work that does not match the plans can give written notice and, for serious problems, post a stop-work order; continuing after one brings daily fines. Commercial and industrial spaces cannot be occupied until the occupancy permit is issued.
Property sales have their own inspection. The seller applies for a pre-sale inspection when the property is listed, and no “For Sale” sign may go up before that application. The buyer can sign a notarized affidavit taking on the violations found, usually with 30 days after closing to fix them. The plat of survey (no older than six months), deed and new owner form are due at least three days before closing.
Illinois building code in Franklin Park
Franklin Park enforces its own adopted codes: the 2021 International Codes and 2020 National Electrical Code as amended by Ordinance 2526-VC-23. The department’s contractors page still lists the 2015 codes adopted in April 2020, but the 2025 ordinance and the current application forms show the 2021 editions. FEMA’s Community Status Book lists Franklin Park (community 170094) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Franklin Park building permit FAQs
Do I need a permit for a fence or a new roof in Franklin Park?
Yes. Fences and roofing are both on the village’s list of work that needs a permit, and a fence permit also needs a plat of survey.
How much does a contractor license cost?
$100 a year for each trade and $250 for a general contractor, running May 1 to April 30, with a $10,000 bond and $1 million of liability insurance.
Can a homeowner pull a permit in Franklin Park?
Yes, as general contractor on their own property. Owner plumbing or electrical work needs detailed drawings reviewed by the trade inspector and a short quiz.
How long does a permit take?
At least five days for most applications, and ten working days for each solar plan review; staff call when the permit is ready.
Do I need an inspection to sell a house?
Yes. A pre-sale inspection is required when the property is listed, costing $100 for a single dwelling, and violations must be fixed or taken on by the buyer.
Who handles demolition?
The village issues the demolition permit, but a Cook County demolition permit must be obtained first and the contractor needs a $50,000 bond.
How do I find out if my lot is in a flood zone?
Ask the Engineering Department at 847-671-8304, which issues written flood-zone determination letters and reviews elevation certificates.
Franklin Park permit search and official resources
Permit holders can follow applications and inspections in the Accela system. For older permits, plans or inspection reports, file a Freedom of Information Act request with the Village Clerk (847-671-8242): online through the village’s FOIA portal, in person at 9500 Belmont Avenue, by email to the Clerk’s Office or by fax to 847-671-7806. Give your name and contact details, say whether the records are for commercial use, and ask for certified copies if you need them.
Inspections are where schedules slip.
Get a free quote →- Franklin Park Building Department
- Online permitting (Accela)
- Building permit application, form DIS1004
- Electrical permit application, form DIS1006
- Contractor license application
- Contractor licensing requirements
- Ordinance 2526-VC-23, adopted building codes (2025)
- Solar panel installation requirements
- Permit process
- Commercial and industrial permits and occupancy
- Pre-sale inspections
- Inspection and transfer stamp fees
- Zoning and Zoning Board of Appeals
- Variance application packet
- Floodplain information
- FOIA requests
- FEMA Community Status Book, Illinois
Simplify Franklin Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Franklin Park sooner?
Let Alliance prepare, file, and track your Franklin Park permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Glenview
Read guide →Hanover Park
Read guide →Fulton County Building Permit Guide
Read guide →Geneva Building Permit Guide
Read guide →Glen Carbon Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Franklin Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.