Skip to main content
Municipal GuideIllinoisGlenview · Cook County

Glenview, Illinois Building Permit Guide

To get a building permit in Glenview, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Glenview’s Development Center, just inside Village Hall at 2500 East Lake Avenue, takes permit applications online or at the counter, offers same-day review for many small jobs, and knocks 25% off single-family home improvement fees for applications filed between December 1 and February 28.

Authority: Glenview Inspectional Services DivisionCounter: Development CenterPhone: 847-904-4330
Authority
Inspectional ServicesDevelopment Center, 2500 East Lake Ave
Small jobs
Same-day reviewQualified files in before 1 p.m.
Large jobs
First review in about 2 weeksComments usually within 10 business days
Inspections
847-904-432024 hours ahead; a.m. or p.m. slots

In the Village of Glenview, the Inspectional Services Division of Community Development reviews, issues and inspects permits for all private construction, working through the Development Center just inside Village Hall, 2500 East Lake Avenue (847-904-4330, Monday to Friday 8:30 a.m. to 4:30 p.m.). Applications go in through the online portal or on paper at the counter. Small jobs such as decks, fences, roofs and sheds can get a same-day review, while new homes and commercial projects usually get first comments within two weeks. Fees come from Chapter 30 of the Municipal Code and are worked out after plan approval.

What requires a building permit in Glenview?

Glenview requires a permit before anyone builds, enlarges, alters, repairs, moves or demolishes a building, changes its occupancy, or installs or changes an electrical, gas, mechanical or plumbing system. The Development Center publishes its own lists of work that does and does not need a permit.

Permit needed

  • Additions, remodeling, new structures and demolition
  • Changing grades, irrigation systems, and moving or adding plumbing fixtures
  • New electrical work or services, and a switch to a different heating, cooling or ventilation system
  • Repairs to 50% or more of a roof, and any new roofing
  • Pools, hot tubs, decks, sheds, patios, sidewalks, fences, generators, solar panels, gas fire pits, siding, driveways and detached garages
  • Removing a tree 8 inches or more across at breast height
  • Elevators, fire alarms, sprinklers, commercial kitchen hoods and wet chemical systems, and exterior changes to multi-family, commercial or industrial buildings
  • Commercial signs and temporary or permanent banners

No permit needed

  • Interior painting, and exterior painting on single-family homes
  • Flooring, carpet, trim and cabinets that do not move walls, change the layout or touch wiring
  • Replacing a furnace, air conditioner or water heater with the same type, size and location, with no change to the venting
  • Low-voltage work such as security, phone, cameras, doorbells and landscape lighting
  • Tree trimming and landscaping that leaves the grade alone

What Glenview decides and what the state holds

Glenview adopts and amends its own construction codes. Since January 1, 2024 it has enforced the 2021 International Residential, Building, Fire, Mechanical and Energy Conservation Codes under Ordinance 6589 and the 2020 National Electrical Code under Ordinance 6590, both passed on December 5, 2023, with Illinois amendments to the energy code. Plumbing follows the Illinois State Plumbing Code as amended by Ordinance 5928 of August 18, 2015. The Development Center has posted notice that the village is adopting the 2024 International Codes, the 2024 Illinois Energy Conservation Code and the 2023 National Electrical Code, all with amendments, to take effect on January 1, 2027, so plans drawn now for a spring start should be checked against the new list.

Short on time to read all of this?

Get a free quote →

The village also sets its own permit fees, registers general and demolition contractors, runs its zoning and subdivision codes, protects landmark trees and regulates building in the 100-year floodplain.

Glenview building department: who handles permitting

The Inspectional Services Division enforces the village’s building, health, fire, property maintenance and zoning codes and issues permits for all private construction in Glenview. Its plan reviewers sit with the Engineering Division’s reviewers in the Development Center, the single counter for planning, engineering, permits and inspections. Land outside the village limits is unincorporated Cook County, where the county’s Department of Building and Zoning issues permits instead; the village’s Community Portal shows the zoning and other details for a Glenview address.

Glenview permit contacts
OfficeDetails
Development CenterVillage Hall, 2500 East Lake Avenue, Glenview, IL 60026; 847-904-4330; fax 847-724-1752
HoursMonday to Friday, 8:30 a.m. to 4:30 p.m.
Inspections847-904-4320, at least 24 hours ahead
Community Development (floodplain, general)847-904-4300
Fire protection plan reviewFire Safety Consultants, Inc., 2420 Alft Lane, Elgin, IL 60124; 847-697-1300
OnlinePermit and development review portal (glenview.onlama.com)

Glenview permit types

The Development Center sorts applications into three tracks. Simple permits can be issued over the counter. Same-day review covers small and medium jobs: files that qualify and arrive before 1 p.m. are reviewed that business day, and later ones the next day, depending on how complex they are and how busy the counter is. Larger projects go through traditional plan review, with a first review typically within two weeks.

Residential permits

  • Same-day candidates: one-story additions under 400 square feet such as sunrooms and porches, detached garages under 400 square feet, decks, sheds, pergolas, fences and pet runs, roofs, siding, masonry, driveways and patios, drainage work, backup generators, EV chargers and solar, furnaces and air conditioners, plumbing and water or sewer service repairs, lawn sprinklers, hot tubs, above-ground pools and minor interior remodels.
  • Traditional review: new single-family homes and larger additions, demolition, foundation-only permits, tree removal and new water services.
  • What to submit: the village’s document chart lists the pieces for each permit type. A new house needs architectural drawings, a plat of survey, site plan, site development plan, tree preservation plan, demolition checklist, grading plan, energy information and the school and park fee application; a deck or shed needs far less.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

New commercial and multi-family buildings, additions, remodels, elevators, wireless and small cell facilities, utility permits and construction trailers all take the traditional review route, and commercial and school projects follow the same document chart. Fire alarm, fire sprinkler, commercial hood and duct and wet or dry chemical suppression plans go straight to the village’s third-party reviewer, Fire Safety Consultants, Inc. in Elgin, before the permit can be issued.

What comes before the building permit

  • Development commissions. The Glenview Development Commission-Adjustments hears zoning variations for single-family homes and changes to existing developments, meeting at 7 p.m. on the first and third Wednesdays. The Development Commission-New Development handles new projects and redevelopment on the second and fourth Wednesdays. Both recommend rezonings, conditional uses, site plans and subdivisions to the Board of Trustees and make final calls on architecture, landscaping, lighting and signs that match approved preliminary designs.
  • Site development permit. Issued alongside the building or demolition permit for new construction, additions and demolitions; its site inspections must pass before any work starts.
  • Landmark trees. Trees 8 inches or more at breast height of a high-quality species such as oak, hickory or maple are protected, and removing one needs a tree removal permit with a reason.
  • Floodplain. Any development in the 100-year floodplain, including buildings, filling, digging and fences, needs a village development permit before work begins.
  • Demolition. Besides the village permit, a Cook County demolition permit may be required, and water must be on site to keep dust down; hydrant meters can be rented at Village Hall.

Glenview permit costs and fees

Building permit fees are set in Chapter 30 of the Glenview Municipal Code and are calculated after the plans are reviewed and approved; you pay them once the permit is ready to issue. The village’s permit pages do not print the Chapter 30 building permit rates; the amounts it does print on its own pages and forms are below.

Rather talk it over?

Call 1-855-478-4290 →
Glenview permit-related charges
ItemAmount
Winter discount, single-family home improvements filed December 1 to February 2825% off building and plan review fees
General contractor registration$50, with a $25,000 bond, insurance certificate and workers’ compensation proof
Demolition contractor registration$50, with a $25,000 bond
Roofers, electricians, plumbersNo village fee; copies of state or other licenses on file
School and park donation, new detached house (Ordinance 4140)3 bedrooms $15,617.22; 4 bedrooms $23,373.79; 5 bedrooms $20,170.02
School and park donation, attached single-family2 bedrooms $7,009.35 to 4 bedrooms $15,363.76
School and park donation, multi-family unit1 bedroom $4,441.40 to 3 bedrooms $13,170.04
Overhead sewer conversion cost shareVillage pays 50% of projects up to $15,000

The winter discount covers room additions, interior remodels and accessory work at single-family homes, including detached garages, sheds, decks, fences, pools, gazebos and concrete or asphalt flatwork. School and park donations apply to subdivisions and developments of one or more lots or units approved on or after March 21, 2000; they are paid to the school districts (30, 31, 34, 39 and 225) and the Glenview Park District, and the Village Manager decides how many bedrooms a unit has, so a den or study can count as one. Land may be dedicated instead of cash.

Trade permits and who may pull them

Electrical, plumbing and mechanical work is permitted by the same division and reviewed with the building plans. Before a permit issues, staff check that each contractor’s license, bond and insurance are current. If a contractor changes after the permit is out, file the village’s change of contractors form.

  • General and demolition contractors register with the village for $50, with a $25,000 bond, a certificate of insurance and proof of workers’ compensation.
  • Plumbers give a copy of their state “055” plumbing license and a letter of intent, and the plumber must be on site for every plumbing inspection.
  • Electricians file a copy of their license with the village.
  • Roofers file a copy of their state roofing license.
  • Fire alarm and sprinkler contractors and all other subcontractors need no village registration.

Homeowners can be the applicant: the village’s process is written for the “homeowner or contact person”, who is the one notified of comments and approval. Work must stay within the permitted construction hours: 7 a.m. to 7 p.m. on weekdays, 9 a.m. to 6 p.m. on Saturdays and 9 a.m. to 5 p.m. on Sundays and holidays.

Rather not deal with the building department?

Get a free quote →

How to apply for a Glenview building permit

1. Check the lists

Use the permit and no-permit lists, and the document chart, to see what your project needs.

2. Clear zoning or commission review

Ask the Planning Division whether the project needs a variation, site plan review or other commission approval first.

3. Register contractors

Make sure general and demolition contractors are registered and trade licenses are on file.

4. Apply

Submit online through the permit portal, which the village encourages, or bring the printed application to the Development Center.

5. Answer review comments

Building and Zoning, Engineering, Health and Fire review as needed; resubmit corrected drawings or contractor papers.

6. Pay and pick up

When every review passes, you are told the permit is approved and the fee is due.

Review, corrections and what causes delay

Traditional reviews usually return comments within 10 business days, and resubmittals are usually turned around within five days. A permit can be held for an unregistered contractor, an expired bond or insurance certificate, or a missing commission approval. Fire protection plans that were not sent to the third-party reviewer also stall the file. Check the status in the portal or call the permit counter at 847-904-4330.

Inspections and certificates of occupancy in Glenview

Schedule building and engineering inspections at least 24 hours ahead at 847-904-4320. Inspectors work Monday, Wednesday, Thursday and Friday, in a morning window from 7:30 a.m. to noon or an afternoon window from noon to 3:30 p.m. The village publishes separate residential and commercial inspection lists and a water tap inspection sheet.

A new house follows a long sequence: site development (silt fence, construction fence and tree protection), shoring near lot lines, footings and foundation walls before each pour, drain tile and waterproofing, and a foundation spot survey. Nothing may be built above ground until the village has approved and stamped that survey. Then come concrete floors, masonry flashing, rough framing after the trade roughs, fire-stopping, insulation and the final. Plumbing, HVAC (including duct leakage and blower door tests), electrical, engineering and any fire sprinkler or alarm inspections run alongside. The certificate of occupancy is issued only after every approval, and temporary occupancy certificates are not given from April through November.

Illinois building code in Glenview

Glenview enforces the codes it adopted by ordinance, listed above, and is moving to the 2024 editions on January 1, 2027. FEMA’s Community Status Book lists Glenview (community 170096) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008, and in the Community Rating System at class 5, worth a 25% flood insurance discount, from October 1, 2026.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Glenview building permit FAQs

Do I need a permit to replace my roof in Glenview?

Yes, for any new roofing or for repairs to 50% or more of the roof. Roof permits are on the same-day review list, and the roofer files a copy of the state roofing license.

Can I get a permit the same day?

Often, for small jobs. Qualifying applications received before 1 p.m. are reviewed that business day; staff tell you if the project needs a full review.

Is there a discount on permit fees?

Yes. Single-family home improvement applications filed between December 1 and February 28 get 25% off the building and plan review fees.

Does replacing a furnace or water heater need a permit?

Not when the new unit is the same type, size and location and the venting does not change; switching to a different heating or cooling system does need one.

Can I cut down a tree on my lot?

A tree 8 inches or more across at breast height needs a permit, and landmark oaks, hickories, maples and similar trees are protected, so you must justify removal.

When are inspections done?

Monday, Wednesday, Thursday and Friday, in morning or afternoon windows; book at least 24 hours ahead at 847-904-4320.

Which codes will apply to my project?

The 2021 International Codes and 2020 electrical code adopted in December 2023, until the 2024 codes and 2023 electrical code the village has announced take effect on January 1, 2027.

Glenview permit search and official resources

Applicants can follow their own permits in the online portal. For copies of past permits, plans or inspection records, file a Freedom of Information Act request through the village’s NextRequest site or on its paper form with the FOIA officer at 2500 East Lake Avenue (847-904-4370, fax 847-724-1518). The village answers within five working days unless it notifies you of an extension, or within 21 working days for a commercial request, which you must disclose. Denials can be appealed to the state Public Access Counselor within 60 days.

Inspections are where schedules slip.

Get a free quote →

Simplify Glenview permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Glenview sooner?

Let Alliance prepare, file, and track your Glenview permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Glenview permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.