In the City of Harvey, building permits are issued by the Department of Buildings and Inspectional Services at City Hall, 15320 Broadway Avenue (708-210-5300 or 708-210-5323), open Monday to Friday from 9 a.m. to 5 p.m. The city asks owners to allow 7 to 10 days for a permit, to use only contractors registered with Harvey, and not to start any work until the application is approved. Starting without a permit brings a fine, and every inspection needs 24 hours’ notice.
What requires a building permit in Harvey?
Harvey publishes a list of the home improvements that most often need a permit, and the rule is the same whether the owner or a contractor does the work. For anything not on the list, the department asks you to call before starting, because skipping a required permit leads to a fine.
Permit needed
- New homes and additions
- Garages, sheds, decks and porches
- Roofs, siding and fireplaces
- Plumbing, central air conditioning and furnaces
- Electrical service changes
- Any work that involves pouring concrete, including patios and driveways
- Fences
- Permanently installed swimming pools
Other city permits and licenses
- Temporary dumpsters and portable storage containers
- Annual rental property business license for every rented house or apartment building
- Vacant property registration
- Transfer stamps when a property is sold
- Health inspections for food businesses, day cares and food trucks
- Zoning relief from the Planning and Zoning Commission
The permit card must be displayed at the site for as long as the work goes on. Portable storage containers are limited to one per house for 14 days a year (30 days for a commercial or industrial lot) and to 8 by 12 by 8 feet; they must sit on a hard surface, stay locked, and keep off sidewalks, parkways, streets and alleys. A residential dumpster may stay 30 days a year and must come from a scavenger licensed by the city. Owners of vacant buildings register them with the department, using the same phone numbers as for permits.
What Harvey decides and what the state holds
Harvey adopts its own codes by ordinance. Its current permit application lists the 2021 International Building, Residential, Fire, Property Maintenance, Mechanical and Energy Conservation Codes, the 2020 National Electrical Code and the current Illinois State Plumbing Code, together with city ordinances. The city also sets its own fees, registers contractors, licenses rental property, runs the zoning code in Title 16 of the Municipal Code and does its own food-business health inspections.
Short on time to read all of this?
Get a free quote →Harvey building department: who handles permitting
The Department of Buildings and Inspectional Services reviews applications, issues permits, inspects work and enforces property standards across the city; some city pages call it Planning, Building and Inspectional Services. Zoning applications go through the Planning and Zoning Department and the Planning and Zoning Commission, and the Fire Department’s inspectional services unit carries out fire inspections of businesses together with the building department. Harvey is an incorporated city, so the Cook County Department of Building and Zoning, which covers only unincorporated land, does not issue permits here.
| Office | Details |
|---|---|
| Buildings and Inspectional Services | City Hall, 15320 Broadway Avenue, Harvey, IL 60426; 708-210-5300 or 708-210-5323; planning@cityofharveyil.gov |
| Hours | Monday to Friday, 9 a.m. to 5 p.m. |
| Planning and Zoning | 708-210-5346; planningandzoning@cityofharveyil.gov |
| Complaints | Online “Report a Concern” form on the department page |
| Payments | City online payment portal (BS&A), linked from the city site |
Harvey permit types
Harvey uses a single building permit application for building, trade and site work. It asks for the job address, the owner, a description of the work including materials, the make and model of any equipment, windows or doors with BTU, tonnage or R- and U-values, and the value of the work counting both materials and labor. Each contractor is named on its own line: carpenter, concrete, electrical, fence, heating, masonry, plumbing, roofing, siding and gutters, windows and others. Contractors attach their scope of work on company letterhead.
Residential permits
- What to bring: a plat of survey (usually in your closing papers), the completed forms, drawings or blueprints that fit the job, and a material list or scope of work.
- Owner-built work: owners doing their own work also sign the homeowner waiver and give proof of homeowner’s insurance and ID.
- Owner affidavit: a notarized affidavit confirms the owner knows about every permit application filed for the property and names any contractor hired.
- Dumpsters and storage pods need their own short permit with placement and removal dates and the hauler’s name.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Business and industrial work uses the same application; for a commercial property the owner affidavit is filed with a copy of the deed or lease. Restaurants, food stores, day cares and food carts or trucks are subject to what the city calls bi-annual health inspections against current Food and Drug Administration standards, with no grandfathering, and Category 1 and 2 food businesses must have certified food safety staff on site at all times. The Fire Department also inspects businesses for fire hazards with the building department.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning check. The zoning code in Title 16 controls the use, location, size and building materials of fences, buildings, garages and homes, so a project that does not fit needs relief first. Zoning application questions go to the building department.
- Planning and Zoning Commission. Special uses, text and map amendments, variances, appeals of the planning official’s rulings and planned unit developments go to a public hearing before the commission, which recommends, and then to the City Council for final approval. The city says the whole process can take 60 to 90 days, and the hearing is set once staff find the application complete.
- Variance standards. Under Section 16-04-380 the commission can grant a variance only if it finds four things: the variance fits the intent of Title 16, the land has special conditions not shared by other lots in the district, strict enforcement would deny rights other owners enjoy, and the owner did not create the hardship.
Harvey permit costs and fees
Building permit fees are set by city ordinance and written on the application by the code official when it is approved; the city’s pages do not publish the building permit rates, so ask the department for the fee on your job value. The application also warns that any extra inspections beyond those the permit covers carry additional fees. The figures below are the ones the city does publish.
| Item | Fee |
|---|---|
| Special use permit | $500 ($400 application plus $100 public hearing) |
| Zoning text or map amendment | $500 |
| Planned unit development | $500 |
| Zoning variance | $400 on the June 2025 application ($300 plus $100 hearing); the web page says $500 |
| Appeal of a planning official’s ruling | $400 ($300 plus $100 hearing) |
| Rental license application | $150, non-refundable |
| Rental license, single-family | $100 a year |
| Rental license, 2 to 3 units | $200 a year |
| Rental license, 4 or more units | $200 for the first unit plus $50 for each additional unit |
Rather talk it over?
Call 1-855-478-4290 →Rental licenses run from June 1 to May 31 and applications are due by June 1 each year. Because the building permit rates are not posted, no worked example can be given; ask for the fee when you submit, and budget for the zoning fee as well if your project needs a hearing.
Trade permits and who may pull them
Electrical, plumbing, heating and other trade work is listed on the same building permit application, with each contractor named. Any contractor an owner hires must be registered with the City of Harvey before starting work; registration is done through the city’s online contractor license form. The city says it requires registered contractors so that work is done properly and owners are protected.
- Plumbing follows the Illinois State Plumbing Code. An owner-occupant who takes out a plumbing permit must keep living in the home for at least six months after the final approval, or the permit is no longer valid.
- Electrical and plumbing contractors must be on site for their inspections.
- Roofing is listed as its own contractor line on the application.
Owners may build and install systems in a home they currently live in, on residential property only, after signing the notarized waiver for building, plumbing, HVAC and electrical work by owner. The waiver sets a firm condition: if an inspection finds the owner’s work does not meet code, the owner must hire a licensed electrician, plumber, general contractor, roofer or HVAC contractor to finish the job, and that contractor must complete the remaining work rather than only patch it. The owner also agrees to hold the city harmless for accidents and damage.
How to apply for a Harvey building permit
Call the department at 708-210-5300 to check whether your project needs a permit and whether zoning relief is needed.
Every contractor on the job registers with the city through its contractor license form before work begins.
Download the full permit application from the city’s permit forms page and list the work, value, equipment and each contractor.
Attach the plat of survey, drawings, material list or scope of work, the notarized owner affidavit, and for owner work the waiver and proof of insurance.
Bring the package to 15320 Broadway Avenue and allow 7 to 10 days for processing.
Pay the fee set by the code official, then post the permit where it can be seen before starting.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The code official approves the application, approves it with notes, or turns it down. Files are slowed by an unregistered contractor, missing notarizations on the owner affidavit or waiver, no plat of survey, or a value that leaves out labor. Work that needs a zoning hearing adds 60 to 90 days, so start that step first.
Inspections and property transfers in Harvey
All inspections need 24 hours’ notice, and the electrical and plumbing contractors must be present when their work is inspected. Call the department to book, and keep the permit posted on site. For owner-built work, a failed inspection can trigger the waiver’s rule requiring a licensed contractor to finish the job. Separately from permit inspections, the Fire Department’s inspectional services unit will visit a home on request to go over escape plans, fire extinguishers and smoke and carbon monoxide detectors, and food businesses that fail a health inspection get a follow-up visit.
Property sales no longer include a city inspection: since April 7, 2025 Harvey has not done point-of-sale inspections, and buyers or sellers who want one hire a private home inspector. Transfer stamps under Ordinance 3-24-010 are requested online; the City Collector emails an invoice within three business days covering the transfer tax, the final water bill and any unpaid city debt, payment must be made in person at City Hall within three business days, and stamps must be picked up by 4:30 p.m. Rental property owners must hold the annual rental license, which needs the city’s rental property course, a current lease, the deed, insurance, a notarized affidavit and a crime-free housing lease addendum.
Illinois building code in Harvey
Harvey enforces the codes named on its application under city ordinance. FEMA’s Community Status Book lists the City of Harvey (community 170100) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Harvey building permit FAQs
Want this handled start to finish?
Get a free quote →Do I need a permit for a new roof or siding in Harvey?
Yes. Roofs and siding are both on the city’s list of home improvements that need a permit, whoever does the work.
How long does a Harvey building permit take?
The city asks owners to allow 7 to 10 days to process a permit; a project that needs a zoning hearing can take 60 to 90 days more.
Can I do the work myself?
Yes, in a home you currently live in, by signing the notarized owner waiver; if your work fails inspection you must hire a licensed contractor to finish it.
Does my contractor need a Harvey license?
Any contractor you hire must be registered with the City of Harvey before starting work, using the city’s contractor registration form.
Does the city inspect a house before it is sold?
No. Point-of-sale inspections stopped on April 7, 2025; you still need a transfer stamp, which is applied for online.
How much does a zoning variance cost?
The June 2025 variance application lists $400 ($300 plus a $100 hearing fee), while the Planning and Zoning page still lists $500; confirm before paying.
Do I need a license to rent out my house?
Yes. A rental property business license is required every year, with a $150 application fee and a $100 license fee for a single-family home.
Harvey permit search and official resources
To get copies of past permits, plans or inspection records, file a Freedom of Information Act request with the City Clerk’s FOIA officer, online through the link on the city’s FOIA page, by mail to the City Clerk’s Office, Attn: FOIA Officer, 15320 Broadway Avenue, or by fax to 708-210-5358. Copies cost 15 cents a page after the first 50 pages, and certifications $1 per document. Records of 911 dispatch since September 1, 2020 are requested from the Cook County Sheriff instead.
Inspections are where schedules slip.
Get a free quote →- Department of Buildings and Inspectional Services
- Homeowners building permit guide
- Permit forms
- Full building permit application, with owner waiver and affidavit
- Dumpster and portable storage permit
- Rental property license
- Health inspections for food businesses
- Transfer stamps
- Fire Department inspectional services
- Planning and zoning
- Zoning variance application
- Special use application
- Zoning appeal application
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
Simplify Harvey permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Harvey sooner?
Let Alliance prepare, file, and track your Harvey permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Hazel Crest
Read guide →Hickory Hills
Read guide →Henry County Building Permit Guide
Read guide →Highland Park Building Permit Guide
Read guide →Hinsdale Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Harvey permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.