Highland Park, Illinois Building Permit Guide

To get a building permit in Highland Park, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Highland Park’s Building Division, part of the Department of Community Development at the Public Services Building, 1150 Half Day Road, issues building permits in the city through its online Civic Access Portal.

Authority: Community Development – Building DivisionFiling: Civic Access PortalPhone: 847-432-0808
Authority
Building Division1150 Half Day Road
Contractors
City GC licenseExam, $10,000 bond, $100 fee
Inspections
Request by 2:30 p.m.Often next business day
Sheds
Always need a permitUp to 18 ft tall

In the City of Highland Park, building permits come from the Building Division of the Department of Community Development, based at the Public Services Building, 1150 Half Day Road (847-432-0808, building@cityhpil.com) rather than City Hall; it is open Tuesday to Friday, 7:30 a.m. to 4 p.m., and Mondays by appointment. Applications, payments and inspection requests go through the city’s Civic Access Portal, every permit needs a signed Property Owner Authorization Form, and fees are set from the city’s annual fee schedule once review is complete. General contractors on remodels, additions, pools and new buildings need a Highland Park general contractor license.

What requires a building permit in Highland Park?

Most construction in Highland Park needs a permit. The Building Division groups its submittal requirements by project, and the exemptions are written into the city’s amendments to the adopted building codes in Title XVII of the City Code. If you are unsure, e-mail building@cityhpil.com or call 847-432-0808 before you start.

Permit needed

  • Roofs (beyond small repairs), driveways, wood decks, sidewalks, stoops, patios, siding and exterior wall veneer, parking lots
  • Every shed, plus fences, retaining walls, detached garages, pools, hot tubs, spas, sport courts and chicken coops
  • Single-family interior alterations, interior drain tile, additions, new houses and demolition
  • Window and door work that changes an opening; solar panels
  • Plumbing, water heaters, lawn sprinklers, heating and cooling, electrical service and EV chargers
  • Fire alarms, sprinklers and kitchen hoods; tents, fireworks, tanks and open burning

No permit

  • Residential window replacement with no change in opening size
  • Roof repairs covering 25% or less of the total roof area
  • Play sets (zoning location and height rules still apply)

A permit is still needed for emergency repairs, such as a broken water main; if the work cannot wait, file the application by the next business day. Contractor work is allowed from 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 5 p.m. on Saturdays, with no contractor work on Sundays or holidays.

What Highland Park decides and what the state holds

Highland Park adopts its own codes and amendments. For permit applications submitted on or after March 1, 2026, it enforces the 2024 International Building, Residential, Existing Building, Mechanical, Fire, Fuel Gas, Property Maintenance and Swimming Pool and Spa Codes and the 2023 National Electrical Code, with local amendments in Title XVII (Building Regulations). Three codes on the list come from the state: the 2014 Illinois Plumbing Code, the Illinois Energy Conservation Code (2024 edition with Illinois amendments, in effect since January 1, 2026) and the 2018 Illinois Accessibility Code. The city also licenses general contractors, reviews design and historic properties through its own commissions, and is a certified community for Lake County watershed development permits.

Short on time to read all of this?

Get a free quote →

Highland Park building department: who handles permitting

The Department of Community Development conducts plan reviews, issues building permits and provides inspections for property in the city. Its Building Division handles permits, contractor licensing, inspections and code compliance; its Planning Division handles zoning, design review and historic preservation questions. Joel Fontane is the Director of Community Development. Both divisions work from the Public Services Building on Half Day Road, and Community Development services are not offered at City Hall on St. Johns Avenue. Unincorporated land outside the city is permitted by Lake County.

Highland Park permit contacts
DetailInformation
OfficeBuilding Division, Department of Community Development, Public Services Building, 1150 Half Day Rd., Highland Park, IL 60035
Phone, fax and e-mail847-432-0808; fax 847-926-8885; building@cityhpil.com
Building Division hoursTuesday to Friday, 7:30 a.m. to 4 p.m.; Mondays by appointment
Planning Division847-432-0867; planning@cityhpil.com; Tuesday to Friday, 8 a.m. to 4:30 p.m.
Inspection requestsCivic Access Portal, buildinginspections@cityhpil.com or 847-432-0808
Department headJoel Fontane, Director of Community Development

Highland Park permit types

All building permits are filed in the Civic Access Portal, where you create an account, choose the permit type, add the owner and contractors as contacts, upload documents to the attachments tab, pay and schedule inspections. Every application needs the signed Property Owner Authorization Form and a contractor’s proposal or detailed scope that includes the full cost of construction, and the whole package must go in at once.

Residential permits

  • Sheds. Apply for the “Accessory Structure – Shed” permit with a plat of survey marking the shed and its distances to lot lines and buildings, and the anchoring method. Accessory structures may be up to 18 feet tall; sheds may not sit in a required side yard, must be 3 feet from lot lines in a required rear yard and 10 feet from all lot lines in a required front yard, and must stay 3 feet from the house. Walls need fire resistance if the shed is over 120 square feet and less than 5 feet from a property line.
  • Fences. Most fences may be 6 feet tall, 4 feet in a required front yard and 8 feet along a business or industrial district or a railway; near driveways and intersections they are limited to 3 feet unless 65% open. No barbed wire or electric fences, and the finished side faces the neighbors. Pool barriers follow Section 305 of the 2024 swimming pool and spa code.
  • Roofs. One- and two-family homes and townhouses use the residential roof permit; include the roofer’s signed Illinois roofing license number and, for hot roofs, $1 million of insurance naming the city. No more than two layers are allowed.
  • Electrical service. Include load calculations, a one-line drawing and a photo of the meter area showing nearby windows, the overhang and the gas meter.
  • Owners as general contractor file the General Contractor Exemption Form with proof of ownership.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial interior alterations and multi-family (condominium) interior alterations have their own requirement sheets, and commercial and multi-family roofs and fences need design review approval from the Planning Division. Fire alarm, sprinkler and kitchen hood systems, tents, fireworks and tanks are permitted under the fire system and fire prevention categories. Signs need a sign permit, and the city’s business pages list a $150 Letter of Intent to Occupy and a $40 business registration.

What comes before the building permit

  • Zoning and design. Setbacks, heights and floor area ratio come from the zoning code; questions go to the Planning Division. Historic landmarks and properties in local historic districts may need Historic Preservation Commission approval.
  • Watershed development. Highland Park is a certified community under the Lake County Watershed Development Ordinance; its Building Permits page carries the WDO submittal checklist and separate WDO permit applications for sites with and without wetlands.
  • Steep slopes, ravines and floodplains. Work in a floodplain, wetland, ravine or bluff area is also reviewed by the Public Works Engineering Division, and steep slope zone limits may apply.
  • State roads. Projects on Half Day Road west of Trail Way, Skokie Highway, Sheridan Road (including Edgecliffe Drive and Oak Street), Walker Avenue or Lake-Cook Road between South Deere Park Drive and Skokie Valley Road may need an IDOT permit before the city issues its own.
  • Trees. A tree preservation or removal permit may be needed, and where tree protection fencing is required it must be installed and approved by the Forestry Division before the building permit is issued.

Highland Park permit costs and fees

Highland Park calculates each building permit fee from its annual fee schedule once the plan review is finished, and the fee is paid through the Civic Access Portal before the permit is issued. The city’s published Permits & Licenses Fee Schedule lists the building permit and sign permit fees as “varies” and refers questions to the Building Division. Because the fee depends on the full cost of construction, the contractor’s proposal you upload must include the complete cost of all work.

Highland Park fees the city publishes
ItemFee
Building permitVaries; calculated from the annual fee schedule after review
Sign permitVaries
General contractor license$100 per category (residential or commercial)
General contractor exam$100 per category
General contractor license renewal$100 per category each year
General contractor license bond$10,000 bond (with the city’s bond language)
Letter of Intent to Occupy$150
Business registration$40
Fire alarm permit (Fire Department)$35

Rather talk it over?

Call 1-855-478-4290 →

For a quote on a building permit, give the Building Division the project type and full construction cost (building@cityhpil.com, 847-432-0808). Other costs to plan for come from the project rather than the permit: certificates of insurance, bonds, tree protection fencing, survey work for the spot survey and as-built drawings, and any IDOT approval.

Trade permits and who may pull them

Plumbing, water heaters, lawn sprinklers, heating and cooling, electrical service and EV chargers are filed as single permits (mechanical only, electrical only or plumbing only) in the portal, while trade work on a remodel or addition goes on that project’s permit. Fire alarm, sprinkler and hood systems are fire system permits.

  • General contractors working on additions, commercial projects, interior remodels, new construction, pools and similar projects need a Highland Park general contractor license. Apply in the portal, submit a notarized felony statement, a certificate of liability insurance for $1 million naming the city as additional insured and a signed $10,000 license bond, then schedule the exam by phone at 847-432-0808. The open-book exam lasts two hours and comes in residential (single-family houses) and commercial (commercial buildings, multi-family, townhouses and condominiums) versions; a passing result is valid for five years. Licenses renew each year, with the renewal notice sent by e-mail around November.
  • Roofers must hold the Illinois roofing license and sign the application with the license number; a licensed roofer submits a completion letter instead of calling for a final inspection.
  • Homeowners may act as their own general contractor using the General Contractor Exemption Form with proof of ownership; a homeowner roof job does need a final inspection.
  • Changing contractors takes a signed change of contractor request and a new owner authorization, added in the portal or e-mailed to building@cityhpil.com with the subject “Change of Contractor Request: (address)”.

How to apply for a Highland Park building permit

1. Look up the property

Use the city’s property search for zoning, flood hazard and historic or architectural status.

2. Read the requirement sheet

Find your project’s submittal requirements on the Building Permits page.

3. Line up approvals

Get design review, historic, IDOT, WDO or tree approvals the project needs.

4. Create a portal account

Register in the Civic Access Portal, choose the permit type and add the owner and contractor contacts.

5. Upload everything at once

Attach the owner authorization, contractor proposal with full cost, plat of survey and plans.

6. Pay the calculated fee

After review, pay the calculated fee in the portal.

7. Request inspections

Use the portal, e-mail or phone, by 2:30 p.m. for a likely next-day visit.

Rather not deal with the building department?

Get a free quote →

Review, corrections and what causes delay

Because applications and supporting documents must be filed together, a missing owner authorization, an unlicensed general contractor or a proposal without the full cost holds up the start of review. Projects on state roads wait for IDOT, and work near ravines, bluffs, floodplains or wetlands adds a Public Works Engineering review. Historic properties and commercial or multi-family exterior work can need commission approval before the permit. Users may have to re-register in the portal after system upgrades, and photos and documents requested during the job are uploaded to the permit’s attachments.

Inspections and certificates in Highland Park

Request inspections in the Civic Access Portal (open the permit and choose “Request Inspection”), by e-mail to buildinginspections@cityhpil.com, or by phone at 847-432-0808. Give the address, permit number, inspection type, the day-of contact’s name, phone and e-mail, and a morning (8 a.m. to noon) or afternoon (noon to 3 p.m.) preference; incomplete requests are not scheduled. Requests received by 2:30 p.m. can often be scheduled for the next business day.

  • On site: a printed set of approved plans, the permit placard visible from the street, and the contractor available for the inspector.
  • Shed sequence: flatwork pre-pour (for a slab), rough framing (if not pre-built) and final. Fences need a final inspection.
  • Foundations: a spot survey is required after the foundation is in and before further inspections are scheduled.
  • Re-inspections by photo: if the inspector only needs photos or documents, e-mail them with the subject “Re-Inspection Documents” and the address, permit number, inspection type and original inspector; some inspections may be done remotely at the inspector’s discretion.
  • Close-out: as-built drawings of drainage and grading, alarms and sprinklers may be required before a permit is closed.

Illinois building code in Highland Park

Highland Park applies the codes listed in its Adopted Building Codes notice of March 1, 2026, with local amendments in Title XVII of the City Code. FEMA’s Community Status Book lists the City of Highland Park (community 170367) as participating in the National Flood Insurance Program, with a current flood map dated October 5, 2023; the city has been in the Community Rating System since May 1, 2015 at class 8, worth a 10% flood insurance discount.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Highland Park building permit FAQs

Where is the Highland Park building department?

At the Public Services Building, 1150 Half Day Road, not City Hall; the Building Division is open Tuesday to Friday, 7:30 a.m. to 4 p.m., and Mondays by appointment.

Do I need a permit to replace windows?

Not for residential windows replaced with no change in the opening size; changing an opening needs a permit.

Does my contractor need a city license?

General contractors on additions, remodels, pools, new construction and commercial work need a Highland Park general contractor license, which takes an exam, a $10,000 bond and $1 million of insurance.

Do I need a permit for a shed?

Yes; every shed needs a permit, and accessory structures are limited to 18 feet tall.

How much is a building permit?

The fee varies and is calculated from the city’s annual fee schedule after plan review, based on the project and its full construction cost.

Can I repair part of my roof without a permit?

Yes, if the repair covers 25% or less of the total roof area; larger jobs and replacements need a roof permit.

When can contractors work?

7 a.m. to 7 p.m. on weekdays and 9 a.m. to 5 p.m. on Saturdays; no contractor work on Sundays or holidays.

Highland Park permit search and official resources

Permit holders track applications and inspections in the Civic Access Portal. Many city records are posted in the Community Portal for Public Records; for anything else, send a written Freedom of Information Act request to the City Clerk’s Office. No special form is required, but since January 1, 2026 the city no longer accepts requests sent as e-mail attachments, so put the full request in the body of the e-mail, with a timeframe and whether it is a commercial request.

Inspections are where schedules slip.

Get a free quote →

Simplify Highland Park permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Highland Park sooner?

Let Alliance prepare, file, and track your Highland Park permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Highland Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.