In unincorporated Henry County, building permits come from the county’s Zoning & Building Department at the courthouse, 307 West Center Street, Cambridge (309-937-3419). The county has required permits for new buildings and additions since 1959; the fee follows a value table, from $33 for work up to $1,000 to $1,300 at $200,000, and the Henry & Stark County Health Department must approve the plot plan before a permit issues. Farm buildings are exempt except for road setbacks and floodplain rules, and the county’s cities and villages run their own permits.
What requires a permit in unincorporated Henry County?
The county applies its building code to construction, alteration, enlargement, repair, moving and demolition of buildings and structures in the unincorporated areas, and its instructions put the rule plainly: anyone who intends to build, enlarge, alter, repair, move, demolish or change the occupancy of a building must get the permit first. Starting without one is an ordinance violation that can bring a stop work order and fines of up to $500.
County permit
- New houses and other new buildings
- Additions
- Garages, sheds and other accessory buildings
- Structural alterations, moves and demolitions
- Changes of occupancy
- Below-grade swimming pools, with a protective barrier
- Development in the floodplain
Exempt (with limits)
- Agricultural buildings on a farm of 10 or more contiguous acres, after an exemption application
- They must still meet road setbacks and floodplain rules
- No county mechanical, plumbing or electrical permit
The county’s exemption application cites 55 ILCS 5/5-12001 and Article 3 of the zoning ordinance: agricultural structures are exempt from the zoning and building code rules requiring building permits, fees, minimum design standards and occupancy permits, but must still follow floodplain rules and the road setbacks. The form defines an agricultural building as one built to house farm implements, hay, grain, poultry, livestock or other horticultural products; a building where people live, where farm products are processed, treated or packaged by employees, or that the public uses does not qualify.
What Henry County decides and what the state holds
The County Board sets the zoning ordinance, the building code and the fee table for unincorporated land, and the department enforces only zoning, building and floodplain rules. The county does not enforce a mechanical, plumbing or electrical code. Plumbing falls under the Illinois Plumbing Code, enforced by the Illinois Department of Public Health, and state law requires the owner, contractor or licensed plumber to request plumbing inspections. Roofing contractors must hold a state license, and the county application asks for its number.
Henry County building department: who handles permitting
Kyle Stromquist, the Henry County Zoning & Building Officer, runs the department. Besides building permits it manages zoning, subdivisions, agricultural areas and floodplain management for the unincorporated county, working with the County Board’s Planning/Development Committee, Planning Committee, Zoning Board of Appeals and Ag Areas Committee. Call ahead for inspector availability.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Zoning & Building Department | Building permits, zoning, subdivisions, floodplain, ag exemptions | Courthouse, 307 West Center Street, Cambridge, IL 61238; 309-937-3419; zoning@henrycty.com; Monday to Friday 8 a.m. to 4:30 p.m. |
| Henry & Stark County Health Department | Septic permits, well permits, plot plan approval | 110 N. Burr Blvd, Kewanee; 309-852-0197; Monday to Friday 8 a.m. to 4 p.m. |
| Highway Department | Driveway access onto county highways | 100 N East Road, Cambridge; 309-937-3346 |
| GIS office | Parcel maps and property information | 307 W Center Street, Cambridge; 309-937-3404 |
Cities and villages in Henry County
The department’s programs cover the unincorporated areas only. Inside an incorporated place, that city or village decides what permits it requires. Kewanee (12,115 residents) issues all residential and commercial building permits through its Community Development Department; see the Kewanee building permit guide. Geneseo (6,505) publishes its own permitting and building guide and permit forms, with City Hall at 115 South Oakwood Avenue, (309) 944-6419. The other incorporated places are Colona (4,938), Galva (2,383), Cambridge (2,020), Orion (1,708), Atkinson, Annawan (part), Woodhull, Alpha, Andover, Hooppole, Cleveland, Coal Valley (part) and Bishop Hill; ask the city or village hall about permits there.
Henry County permit types
One building permit application covers every kind of project, sent with a plot plan and plans to the Zoning & Building Office at the courthouse.
Residential permits
- Application. Owner, contractor, roofing contractor with state license number, plumbing contractor with license number, a description of the work and the total value of materials and labor, including the owner’s own labor. The department can usually fill in the legal description from the owner’s name and address.
- Plot plan. Required for new structures and additions, showing compliance with the setback rules; the owner and contractor carry full responsibility for setbacks, and a building in the wrong place may have to be moved or removed.
- Plans. Footing and foundation design with rebar, floor plans showing rooms, exits, egress windows (5.7 square feet of opening, 20 inches wide, 24 inches high, sill no higher than 44 inches), stairs, handrails, guards and interconnected smoke detectors, a 1-hour wall between house and garage, and framing elevations.
- Accessory buildings. No taller than 20 feet floor to peak, at least 10 feet from the house and 10 feet from the rear line.
- Pools. Below-grade pools need a barrier at least 5 feet high that a 4-inch sphere cannot pass, with self-closing, self-latching gates, built before the pool is filled.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Business and manufacturing projects use the same application, marked with the BUS or MAN occupancy. Depending on the project, the department may also ask for an Americans with Disabilities compliance certificate, a floodplain elevation certificate, a manufactured housing certificate or an architect’s or structural engineer’s certificate. The county’s instructions add that the Illinois State Fire Marshal enforces fire prevention and safety regulations.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Health Department plot plan. The Henry & Stark County Health Department must approve the plot plan, including any septic system and well, before the county issues a building permit; its plot survey for a building permit costs $100.
- Zoning relief. Variances, special uses and map amendments are filed with a notarized application, deed and site plan by the 15th of the month; applications are usually processed monthly through the Planning Committee, the Zoning Board of Appeals and the County Board.
- Soil and Water Conservation District. Zoning requests also go to the Henry County SWCD, which charges $100 for a residential zoning and wants them ten working days before its board meeting, usually the first Thursday.
- Address and driveway. The owner secures a property address, and driveway access onto a county highway is arranged with the Highway Department.
- Subdivisions. In a new subdivision, no building permit is issued (except for a well house) until all improvements are complete.
Henry County permit costs and fees
The building permit fee comes from the county’s valuation table, Chapter 1, Section 108, effective September 1, 2017. It is based on the total value of all the work, materials and labor together, and is paid to the Henry County Treasurer with the application.
| Project value | Fee |
|---|---|
| $1 to $1,000 | $33 |
| $1,001 to $2,000 | $59 |
| $9,001 to $10,000 | $150 |
| $24,001 to $25,000 | $323 |
| $29,001 to $30,000 | $365 |
| $49,001 to $50,000 | $531 |
| $99,001 to $100,000 | $822 |
| $149,001 to $150,000 | $1,053 |
| $199,001 to $200,000 | $1,300 |
| $200,000 and up | $6.50 per $1,000 (as printed) |
Each $1,000 band has its own fee, so read the full table for your exact value: a detached garage valued at $30,000 falls in the $29,001 to $30,000 band and costs $365, and a $150,000 house costs $1,053. The table does not say how the $6.50 rate applies above $200,000, so ask the department for a figure on larger projects.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Variance | $400 |
| Special use or map amendment | $450 |
| Survey plat review | $25 |
| Final plat, 1 to 3 lots | $50 + $15 per lot |
| SWCD review, residential zoning | $100 |
| Health Department plot survey for a building permit | $100 |
| Septic permit, licensed contractor (full / mini) | $200 / $100 |
| Septic permit, homeowner installation | $450 |
| Well construction permit plus inspection | $100 + $100 |
The Health Department’s fees are set by the Henry County Board of Health; its schedule was last updated on May 6, 2026, when the homeowner septic installation fee changed.
Trade permits and who may pull them
Henry County issues no separate electrical, plumbing or mechanical permits; its department enforces only zoning, building and floodplain rules. That does not make trade work unregulated:
- Plumbing: the Illinois Plumbing Code applies and is enforced by the Illinois Department of Public Health. Name the plumbing contractor and license number on the county application, or write OWNER if you are doing it yourself, and remember that state law requires a plumbing inspection to be requested.
- Roofing: roofing contractors must be state-licensed, and the county application has a line for the license number; an owner doing the roof writes OWNER.
- Electrical: no county electrical code is enforced, though the department recommends following the National Electrical Code.
- Septic installers: sewage contractors register with the Health Department ($100 per county), and a homeowner may install a system for a $450 permit.
- Wells: the Health Department permits new wells and geothermal borings and oversees sealing of abandoned wells.
The county publishes no general contractor license or registration; the contractor’s name and contact details simply go on the building permit application.
Rather not deal with the Henry County building department?
Get a free quote →How to get a Henry County building permit
Use the county GIS office or a tax bill to confirm the land is outside every city and village.
Find the district’s lot size and setbacks (in AG-1 and R-1: 43,560-square-foot lots, 40-foot front and rear yards, 10-foot side yards).
Get the plot plan, septic and well approved in Kewanee before the county will issue the permit.
Fill in every part, with license numbers for the roofer and plumber and the total value of all work.
A plot plan for new buildings and additions, plus one set of building plans for the county to keep.
Deliver the signed application to the courthouse in Cambridge with the fee payable to the Henry County Treasurer.
Review, corrections and what causes delay
The county will not process an application that is not properly completed and signed by the owner or contractor, and it will not issue the permit until the Health Department has approved the plot plan. Zoning relief takes longer: variances and special uses run on a monthly cycle with a 15th-of-the-month deadline and also go to the Soil and Water Conservation District. Road setbacks apply to every rural project: buildings and solid fences over 2 feet must sit 40 feet from the right-of-way on township and private roads (73 feet from the centerline of a 66-foot road) and 50 feet on county, state and federal highways (100 feet from the centerline of a 100-foot highway). On a corner lot, every street side counts as a front yard.
Inspections in Henry County
Notify the building official at least 24 hours before each inspection, and do not work past an inspection point without approval. The county requires four inspections: a setback check made with the footing inspection, with property pins clearly marked; footings and foundation after excavation or forming and before concrete; framing after framing, roofing, fire blocking, bracing, piping, chimneys and vents are in and before insulation; and a final before anyone occupies or uses the building.
The instructions set the minimum footings the inspector looks for: an 8-inch by 16-inch standard footing or a 42-inch-deep trench footing, each with two half-inch bars; a floating slab with an 8-inch by 8-inch perimeter for buildings up to 720 square feet (24 by 30 feet); and pier pads 24 inches square by 12 inches deep, with every footing except a floating slab bottomed at least 42 inches below grade. Skipping an inspection is an ordinance violation that can bring a stop work order and fines up to $500, and department decisions can be appealed to the Zoning Board of Appeals or the Building Board of Appeals.
Illinois building code in Henry County
The county’s posted instructions record its code history: the 1976 Uniform Building Code adopted May 8, 1979, the 1988 edition on December 12, 1989, and the 2000 International Building Code on April 17, 2001, applied to unincorporated land. The department recommends designing occupied buildings to address radon even though the code does not require it. FEMA’s Community Status Book lists unincorporated Henry County (community 170739) as participating in the National Flood Insurance Program, with flood maps effective June 2, 2011, and the county’s Flood Plain Damage Prevention Ordinance applies to farm buildings too.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Henry County permit search and official resources
The Zoning & Building Department keeps the application, plot plan and plan set for each county permit; ask the office at 309-937-3419 about past permits on a parcel, or send a written Freedom of Information Act request to the county at the courthouse. Parcel maps come from the GIS office, and septic and well records from the Henry & Stark County Health Department.
- Henry County Zoning & Building
- Forms and applications
- Building permit application
- Building permit instructions
- Accessory structures and setbacks (Sections 7.5 and 7.6)
- Building permit fee table (effective September 1, 2017)
- Agricultural building exemption application
- Zoning application and fees
- Soil and Water Conservation District zoning fees
- Survey and subdivision plat fees
- Henry County Zoning Ordinance
- Flood Plain Damage Prevention Ordinance
- Henry County Highway Department
- Henry County GIS
- Henry & Stark County private sewage program
- Henry & Stark County water well program
- Henry & Stark County environmental health fees
- City of Geneseo permitting and building guide
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Henry County building permit FAQs
Do I need a county permit to build a house in rural Henry County?
Yes. New buildings and additions in the unincorporated county have needed permits since 1959, and the plot plan needs Health Department approval first.
How much is a Henry County building permit?
It depends on the total value of the work: $33 up to $1,000, $365 for $29,001 to $30,000, and $1,300 for $199,001 to $200,000.
Are farm buildings exempt?
Yes, on a farm of 10 or more contiguous acres, after the exemption application; they must still meet floodplain rules and road setbacks.
Does the county issue electrical or plumbing permits?
No. It enforces no electrical, plumbing or mechanical code; plumbing falls under the Illinois Department of Public Health.
How far must a building be from the road?
Forty feet from the right-of-way on township and private roads and 50 feet on county, state and federal highways.
Who issues septic and well permits?
The Henry & Stark County Health Department in Kewanee (309-852-0197); a licensed contractor’s full septic permit is $200.
How much does a variance cost?
$400, with applications due by the 15th of the month.
Does the county permit work inside Kewanee or Geneseo?
No. The county’s programs cover unincorporated land; Kewanee, Geneseo and the other cities and villages handle their own.
Simplify Henry County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Henry County sooner?
Let Alliance prepare, file, and track your Henry County permits while your crew stays on the job.
More Illinois permitting guides
Kewanee
Read guide →Rock Island County
Read guide →Bureau County
Read guide →Hickory Hills Building Permit Guide
Read guide →Highland Park Building Permit Guide
Read guide →Hinsdale Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Henry County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.