Inside Kewanee, building permits are approved and issued by the city’s Community Development Department at City Hall, 401 East Third Street (309-852-2611, ext. 267 for the Director of Community Development). One application covers building, electrical, plumbing and mechanical work: print it, fill it in and upload it to the city’s iWorQ portal. A fence or driveway permit costs $20 (the form also has a $20 filing fee line), a house demolition $75, and new homes need stamped drawings to the 2021 International Residential Code. Henry County’s Zoning & Building Department in Cambridge handles land outside the city.
What requires a building permit in Kewanee?
The Community Development Department publishes its own list and notes that it is not complete; when in doubt, the city asks you to call the Director of Community Development before starting work.
Permit required
- New single-family, two-family, multifamily and non-residential buildings
- Additions and structural alterations
- Every accessory building: garages, sheds of all types, gazebos, greenhouses
- Porches, decks and carports
- Facade changes in Business and Manufacturing districts
- Swimming pools, including temporary pools over 24 inches deep
- Signs and fences
- Changing a roof’s pitch or installing metal siding
- Moving or demolishing a structure, and changing a building’s occupancy
- New or widened driveways
No permit
- Replacing a roof covering
- Installing non-metal siding
- A pool less than 24 inches deep
- Replacing a porch with one of the same size
- Non-structural repairs and routine maintenance, such as replacing windows or painting
The roof and siding rules turn on the details: a straight reroof needs no permit, but changing the roof’s pitch does, and vinyl siding is exempt while metal siding is not.
What Kewanee decides and what the state holds
Kewanee adopts and amends its own codes. The city lists the 2021 International Building, Residential, Property Maintenance, Mechanical and Fire Codes and the 2017 National Electrical Code, and its April 2026 application asks for stamped drawings to the 2021 codes for new houses and commercial buildings. Plumbing follows the State of Illinois Plumbing Code, and buildings must meet the Illinois Accessibility Code. Zoning variations are local and must be approved by the Plan Commission or the Zoning Board of Appeals before a permit is issued.
Kewanee building department: who handles permitting
The Community Development Department administers the building, zoning and nuisance codes within the city limits and approves and issues building permits for all residential and commercial projects. It is led by the Director of Community Development, to whom the city refers corner-lot fences, commercial accessory buildings and the above-ground pool fence exception. A permit clerk handles intake, and Public Works inspects sewer terminations on demolitions.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Community Development Department | Building, electrical, plumbing, mechanical, fence, sign, driveway and demolition permits; zoning | City Hall, 401 East Third Street, Kewanee, IL 61443; 309-852-2611 ext. 267 (Director, direct 309-761-1013); permit clerk 309-761-1002; fax 309-856-6001 |
| Public Works | Sewer line inspection after demolition | 309-852-2611 ext. 222 |
| City Clerk | Public records requests, business licenses | City Hall; 309-852-2611 ext. 232; 8:00 a.m. to 5:00 p.m. |
| Henry County Zoning & Building | Unincorporated Henry County | 307 West Center Street, Cambridge; 309-937-3419 |
Kewanee is Henry County’s largest city, with about 12,100 residents by the Census Bureau’s 2025 estimate. City permits stop at the city limits; outside them, the Henry County Zoning & Building Department in Cambridge permits unincorporated land under the county’s own zoning ordinance and building code. Kewanee’s Plan Commission still plans streets and public grounds for territory up to 1½ miles outside the limits.
Kewanee permit types
Kewanee uses a single Building, Electrical, Plumbing & Mechanical Permit Application (version dated April 7, 2026) for every project except demolition. You tick each permit type that applies, complete the sections the form’s Section 13 calls for, and upload the finished form in the iWorQ portal. Fees can be paid online.
Residential permits
- New houses. Every section of the form, costs for each trade, and stamped drawings showing compliance with the 2021 International Residential Code.
- Additions and remodels. At minimum the building section and the site plan, plus the electrical, plumbing or mechanical sections for any trade work. When walls come out or openings are reframed, the drawing must give header and beam sizes.
- Garages and sheds. Building section and a site plan showing every lot line and the distance to it; all accessory structures must be anchored to the ground. A slab with a 12-inch by 12-inch thickened edge is accepted only for garages and sheds up to 1,250 square feet; otherwise the form lists a 12-inch trench footing 42 inches deep, spread footings or piers.
- Decks. Building section and site plan, with ledger board and footing details for an attached deck; the city’s deck guide uses 42-inch-deep footings.
- Pools. Building section and site plan; an electrical section if there is no existing GFCI outlet for the pump or lights; and a fence permit unless a fence already encloses the area.
- Fences. Four feet maximum in a front yard with 70% visibility through it, six feet in side and rear yards, the finished side facing out, and only material sold for fencing; plastic snow fence is not allowed as a permanent fence.
- Driveways. New driveways and wider existing ones need a permit; a residential driveway may be no more than 24 feet wide.
- Solar. Building and electrical sections, with stamped engineering for the existing roof (roof-mounted) or the mounting method (ground-mounted).
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
New commercial buildings need every section of the application, trade costs and stamped drawings showing compliance with the 2021 International Building Code. A commercial accessory structure may also need stamped drawings; ask the Director before filing. Any sign not mounted flat on a wall needs stamped engineered drawings of the mounting, and illuminated signs add the electrical section. Portable signs have their own application.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning variations. The Zoning Board of Appeals hears appeals of the zoning officer’s rulings and can recommend limited variances, such as yards up to 25% smaller or buildings up to 10% taller than the code allows.
- Rezoning, special use and text amendments. Filed with the city at least 24 days before a Plan Commission hearing; the Commission usually meets on the fourth Thursday at 7:00 p.m., and the applicant must attend.
- Enterprise Zone. Projects in the Enterprise Zone may obtain a Building Materials Exemption Certificate through the city before buying materials.
- Utilities for demolitions. Ameren gas and electric and the city water service must be retired before a demolition application is filed.
Kewanee permit costs and fees
The fees printed on Kewanee’s own forms and FAQs are flat; the building, electrical, plumbing and mechanical charges for larger projects are filled in by the department at review and are not printed on the application, so ask the Director of Community Development for a figure before you file.
| Item | Fee |
|---|---|
| Fence permit | $20 |
| Driveway permit | $20 |
| Filing fee (line on the permit application) | $20 |
| Demolition, accessory building | $25 |
| Demolition, one- or two-family dwelling or one-story commercial building | $75 |
| Demolition, other commercial building | $150 |
| Rezoning, special use or text amendment | $200 each |
| Building Materials Exemption Certificate (Enterprise Zone) | 0.5% of the building materials cost |
Rather talk it over?
Call 1-855-478-4290 →The Fence FAQ gives the fence permit itself as $20, and the application’s city-use section lists the $20 filing fee as a separate line. The demolition form has the office circle one of its three fee levels, and its city-use section has a box to record a fee waiver and the reason for it. The 0.5% Enterprise Zone processing fee is due when the exemption application is submitted; on $60,000 of building materials it is $300. Permit and contractor license fees can be paid online through the links on the Community Development page.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are sections of Kewanee’s one application, each with its own description of work and cost, and the plumbing section asks for a count of every fixture being installed, replaced or repaired.
- Electrical: all commercial work must be done by a licensed electrician registered with the City of Kewanee. On a house, the owner may do the work only in the residence the owner lives in; rentals, flips and every other residential job need a licensed, city-registered electrician.
- Plumbing: commercial work must be done by an Illinois-licensed plumber who has given the city their license information. Owners may plumb only the home they live in; all other residential plumbing needs a licensed plumber.
- Mechanical: the city’s FAQ says there are no licensing requirements for HVAC installers, but installing, altering or replacing an HVAC system still needs a mechanical permit.
- Roofing: a roofing contractor holds a state license from the Illinois Department of Financial and Professional Regulation; a straight reroof needs no city permit, but a change of pitch does.
The application asks for each contractor’s license number, and an owner doing the work writes “SELF” next to general contractor. Contractor license fees are paid online through the city’s payment link.
Rather not deal with the building department?
Get a free quote →How to apply for a Kewanee building permit
Check the city zoning map; land outside the limits goes to Henry County in Cambridge.
Any variation from the zoning code needs Plan Commission or Zoning Board of Appeals approval first.
Download the Building, Electrical, Plumbing & Mechanical Permit Application and read Section 13 for your project type.
Fill in Sections 1 to 6 for every job, the trade sections that apply, and a dimensioned site plan in Section 12.
Upload the completed form and any stamped drawings to the city’s iWorQ portal.
Pay online, then follow the inspection list in the letter that comes with the permit.
Review, corrections and what causes delay
The city puts the main cause of delay plainly: an incomplete application slows the review, and a site plan without a legible drawing and all dimensions delays permit processing. Fill in Section 13’s required sections, list every contractor with a license number, and include ledger and footing details for decks and header and beam sizes for reframed openings. New homes, commercial buildings, off-wall signs and solar arrays require stamped drawings, so line up the architect or engineer before filing. The city’s garage and deck guides are optional, but the department says using them speeds approval.
Inspections in Kewanee
Every Kewanee permit requires inspections, and the letter that comes with the permit lists which ones. Arranging them is the permit holder’s job: contact the Director of Community Development and allow 24 hours for every inspection. For a garage, the inspector checks the footings and setbacks before concrete is poured, the framing before siding goes on, and the finished building and grade at final; decks follow the same footing, framing and final sequence.
Pools and solar arrays have a timing rule: a required fence must be installed before the pool or array, or within 24 hours after it, and a pool needs a temporary barrier during those 24 hours. In-ground pools need a fence at least 48 inches high, and pools sit at least 8 feet from the house and 3 feet from side and 5 feet from rear lot lines. On a demolition, Public Works must inspect the plugged sewer line before the hole is filled, and any fill must be inspected before it goes in, must be clean construction or demolition debris such as broken concrete without protruding metal bars, brick, rock, stone or soil, and must be covered with soil within 30 days.
Illinois building code in Kewanee
Kewanee enforces the 2021 International Codes and other codes adopted in its city code. FEMA’s Community Status Book lists the City of Kewanee (community 170286) as participating in the National Flood Insurance Program, with flood maps effective June 2, 2011.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Kewanee permit search and official resources
Permit and inspection records are public records kept by the City Clerk, who coordinates Freedom of Information Act requests for every department. Send a written request to the City Clerk at City Hall, 401 East Third Street, Kewanee, IL 61443, on the city’s form or in any written form, or email the request in the body of the message; the city answers within five working days, extendable by five more under the Act.
- Kewanee Building, Zoning, Community Development
- Building codes and permit applications
- Building, Electrical, Plumbing & Mechanical Permit Application (April 2026)
- Demolition permit application and fees
- Fence FAQ
- Swimming pool FAQ
- Uncovered wood deck guide
- One-story detached garage guide
- Enterprise Zone building materials exemption
- Zoning page and zoning map
- Rezoning, special use and text amendment application
- Zoning Board of Appeals
- City of Kewanee FAQs
- City Clerk and FOIA requests
- Henry County Zoning & Building
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Kewanee building permit FAQs
Do I need a permit to replace my roof in Kewanee?
No, not to replace the roof covering; a permit is needed only if you change the roof’s pitch.
How much is a fence permit?
$20 for the fence permit, per the city’s Fence FAQ; the application’s fee section also lists a $20 filing fee.
How tall can a fence be?
Four feet in a front yard with 70% visibility through it, and six feet in side and back yards; corner lots are reviewed by the Director.
Can I do my own electrical or plumbing work?
Only in the house you own and live in. Rentals, flips and commercial work need licensed tradespeople registered with the city.
Does an above-ground pool need a fence?
Generally yes if it can hold more than 24 inches of water, unless it meets the city’s reinforced-wall exception, which the Director reviews case by case.
How do I apply?
Print the city’s permit application, fill it in and upload it to the iWorQ portal, or contact City Hall at 309-852-2611.
What does it cost to demolish a house?
$75 for a one- or two-family dwelling, $25 for an accessory building, after the utilities have been retired.
Who issues permits just outside Kewanee?
The Henry County Zoning & Building Department in Cambridge (309-937-3419) for unincorporated land.
Simplify Kewanee permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Kewanee sooner?
Let Alliance prepare, file, and track your Kewanee permits while your crew stays on the job.
More Illinois permitting guides
Henry County
Read guide →Rock Island County
Read guide →Bureau County
Read guide →La Grange Building Permit Guide
Read guide →La Grange Park Building Permit Guide
Read guide →Lake County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Kewanee permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.