In the Village of Hazel Crest, permits are handled by the Department of Building and Inspectional Services, led by Director Paula Nicholes, at Village Hall, 3601 West 183rd Street (708-335-9600, building department extension 700). Plan on 7 to 10 days for a permit to be processed. Any contractor you hire must hold a village registration, which costs $125 a year and needs proof of insurance, and jobs over $10,000 also need a $10,000 surety bond. The village also requires a point-of-sale inspection, costing $100, before a property changes hands.
What requires a building permit in Hazel Crest?
The village’s building code says a permit must be obtained before beginning construction, alteration or repair, which the department reads as covering almost everything except like-for-like replacement for maintenance and redecorating. Building and electrical permits are needed for most home improvements and additions, whether the owner or a contractor does the work, and skipping a permit can bring a fine.
Common permits
- New houses and additions
- Garages, sheds, decks and porches
- Roofs, siding and fireplaces
- Central air conditioning and electrical service changes
- Concrete work of any kind, patios and driveways
- Fences and permanently installed pools
- Plumbing, signs, alarm systems and solar panels
No permit
- Gutters (the plumbing application says so)
- Replacing something for maintenance, and redecorating
Fences follow Section 6-40 of the Municipal Code. No fence is allowed in a front yard; a fence along a lot line must show its finished side to the neighbor, and a fenced enclosure in the rear yard that is not on a lot line must stay at least 8 feet from every lot line. Side and rear fences may be up to 6 feet tall, never of barbed wire or electrified. On a corner lot a street-side fence must keep at least 10 feet from the curb and must not block the view at the intersection, and any fence on an easement can be ordered removed at the owner’s cost when utility work needs the space. A replacement fence must meet the same rules, and a new fence built next to an existing one with a gap between them needs a gate or other access so the owner can cut grass and clear debris in the gap.
What Hazel Crest decides and what the state holds
Hazel Crest writes its own building, electrical, plumbing, fence and zoning rules into its Municipal Code and sets its own permit fees. It registers contractors, licenses businesses through an annual business operations permit, inspects homes at sale, and holds a SolSmart designation for its solar permitting. Plumbing work must follow the village plumbing code and is done by plumbers holding the state 055 license.
Hazel Crest building department: who handles permitting
All building, trade and fence permits, contractor registrations, point-of-sale and business inspections go through the Department of Building and Inspectional Services. The Zoning Administrator, in the same building, handles variance requests, and the Water Department handles water service and final meter readings. Because Hazel Crest is an incorporated village, the Cook County Department of Building and Zoning, whose permits cover only unincorporated land, has no role here.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Building and Inspectional Services | Village Hall, 3601 West 183rd Street, Hazel Crest, IL 60429; 708-335-9600, extension 700; fax 708-335-9622 |
| Department hours | Monday to Friday, 8 a.m. to 4:30 p.m. (Village Hall stays open to 7 p.m. on Tuesdays) |
| Director | Paula Nicholes, Director of Inspectional Services |
| Zoning Administrator | 708-335-9600, extension 110 |
| Water Department | 708-335-9600, extension 120 |
Hazel Crest permit types
The department posts separate forms for building, electrical, plumbing, fence, sign, alarm, for-sale or for-rent sign and miscellaneous permits, plus the contractor registration and point-of-sale applications. On a contractor job the general contractor files the long building permit application listing every subcontractor, and each subcontractor fills out its own village permit application with a signed scope of work. The general contractor then hands all the applications in together; the department will not process the job piecemeal.
Residential permits
- Plat of survey. Every homeowner application starts with a copy of the plat of survey, usually from the closing papers, with the new work drawn on it and dimensioned, plus any drawings, blueprints or sketches.
- Signed scopes. Each contractor’s proposal must be signed by both the owner and the contractor.
- Electrical and plumbing each need two drawings of the work and a copy of the contractor’s license, and the approved electrical drawings must stay on site.
- Fences need a clean copy of the plat of survey with the fence sketched on it, the height, length and total cost; call JULIE at 800-892-0123 before digging in an easement.
- Solar. Roof panels are allowed in every zoning district but may not rise above the peak or past the eaves; small ground arrays may reach 5 feet into a side or rear setback but no closer than 5 feet to a lot line. Systems costing up to $30,000 go through a streamlined review aiming for approval in three days; larger ones need a lien holder certification (or, for an owner-occupied home, a lien holder exemption) and a workers’ compensation affidavit. Plans go to the department by email at a scale of at least 1/4 inch to 1 foot, showing the panel layout, the electrical and structural details, how the roof carries the load and how the system will be kept safe during maintenance.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
A new business needs a Business Operations Permit, renewed each year. The 2024 procedure starts with confirming the use fits the zoning district, then any building, sign and water service permits for renovations, then the application with floor plans and a copy of the owner’s driver’s license and the annual fee. The form also asks for emergency contacts, a contact for inspection notices, business hours and any special hazards. The business can open only after pre-opening inspections find every code violation cleared, and the department keeps inspecting afterwards on a schedule set by the business’s hazard class.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The building application asks for the property’s zoning classification, and the department checks every job for zoning compliance. A posted zoning map shows each district.
- Variances. If following the zoning ordinance would create a hardship, write to the Zoning Administrator at Village Hall and enclose copies of your survey showing the proposed work.
- Water service. New or reopened businesses arrange water service with the village Water Department.
Hazel Crest permit costs and fees
Building permit fees are set by village ordinance, and the department calls the general contractor with the amount when the permit is ready to pick up. The building application has lines for an impact fee, a performance bond, the building permit and inspection fees, so a single permit can carry several charges. The Residential Building Permit page still posts a construction fee schedule dated May 1, 2007; its main rows are below with the amounts printed on the current forms, so confirm the total with the department.
| Item | Fee |
|---|---|
| Building permit, project under $1,000 (2007 schedule) | $50 base fee |
| Building permit, $1,000 to $3,000,000 (2007 schedule) | $10 per $1,000 of project value; $5 per $1,000 above $3,000,000 |
| Decks, fences, patios, driveways, roofs, sheds, air conditioners or furnaces (2007 schedule) | $50 each |
| Inspection fees, new construction (2007 schedule) | $0.30 per sq ft residential or commercial, $0.10 per sq ft accessory buildings, $100 minimum; re-inspection $50 |
| Cash bond, residential construction (2007 schedule) | $1,000 |
| Contractor registration | $125 a year, expiring each April 30 |
| Surety bond | $10,000 for any job over $10,000 |
| Electrical, new single-family house with 100-amp service | $75 |
| Electrical, new single-family house with 200-amp service | $125 |
| Electrical alterations to an existing building | $6.60 for the first outlet plus $0.25 for each additional outlet |
| Electrical minimum fee / re-inspection | $50 / $35 |
| Point-of-sale inspection | $100, including one re-inspection; $35 for each further visit or a missed appointment |
| Plumbing, single-family home (2007 schedule) | $75 for the first 5 fixtures, $10 for each additional fixture |
Rather talk it over?
Call 1-855-478-4290 →Commercial and multi-family electrical fees are set by circuits, motors and service size under Sections 9-77 and 9-90 of the village electrical code, and outdoor electric signs by square foot per side. The Business Operations Permit carries its own annual fee. On the 2007 schedule, a $20,000 remodel would carry a building permit fee of $10 × 20 = $200, before any electrical, plumbing or inspection charges; the schedule also lists water and sewer tap and system development charges for new connections.
Trade permits and who may pull them
Every contractor working in Hazel Crest must be registered with the village before work starts. The registration form asks for workers’ compensation and employer’s liability cover of at least $100,000 per person, public liability of at least $250,000 per person and $500,000 per accident, and property damage cover of $100,000 per accident and $300,000 in total, all naming the village as certificate holder. The 2022 permit process sheet adds that general, concrete and roofing contractors must carry workers’ compensation.
- Plumbers submit a copy of their current 055 plumbing license and a letter of intent on company letterhead, sealed or notarized, describing the work and signed by the owner and the plumber. Water heaters made after 2010 must have an expansion tank.
- Electricians file a copy of their electrical license with each application, and solar installers must also complete village contractor registration.
- Roofers and alarm installers provide copies of their licenses before any work is done.
Homeowners can apply for permits on their own homes and bring the plat of survey and drawings themselves. The village lets an owner make any changes to their own property except a change of electrical service, which must be done by a village-registered electrical contractor. The solar checklist notes that an owner acting as their own contractor on a larger job, which it does not recommend, must file an owner exemption affidavit.
Rather not deal with the building department?
Get a free quote →How to apply for a Hazel Crest building permit
Call Inspectional Services at 708-335-9600, extension 700, to confirm a permit is needed and whether zoning relief is required.
Each contractor files the registration form with insurance certificates and the $125 fee, and a bond for jobs over $10,000.
Download the building application and any trade forms from the Document Center; attach the plat of survey, drawings and signed scopes.
On a contractor job the general contractor submits all the subcontractor applications at the same time.
Allow 7 to 10 days; the department phones when the permit is approved and tells you the fee.
Pay at Village Hall, collect the permit documents and inspection card, and keep them posted at the site.
Review, corrections and what causes delay
The solar checklist describes the review rhythm: five business days to approve or reject the application and five more to issue the approved permit. It names the usual causes of delay as missing information, contractors not registered with the village and equipment that is not listed. A plumbing letter of intent without the owner’s signature, or subcontractor applications arriving separately, will also hold up a file.
Inspections, occupancy and home sales in Hazel Crest
Each permit comes with an inspection card listing the visits for that project, which are made at stages during the work. A fence, for example, needs a pre-pour inspection of the post holes, which must be at least half as deep as the fence is tall, and a final. Plumbing work ends with a certificate of final plumbing inspection, and a new building may not be occupied until it passes its final inspection and receives an occupancy permit.
Before a sale, the seller or the seller’s agent files the point-of-sale application with the property address, the owner or agent’s details, the buyer’s name, a copy of a driver’s license and the fee, and books the inspection at least three weeks before closing; for a vacant or foreclosed home the buyer arranges it and shows proof of ownership. An adult must be present. Reports are mailed within 10 working days, and all violations must be fixed and re-inspected before closing and occupancy, unless the buyer signs the buyer’s agreement taking on the repairs. A certificate of occupancy is issued once an inspection shows every violation corrected, and the seller calls the Water Department for a final meter reading before leaving.
Illinois building code in Hazel Crest
Hazel Crest enforces the building, electrical and plumbing codes adopted in its Municipal Code. FEMA’s Community Status Book lists Hazel Crest (community 170102) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Hazel Crest building permit FAQs
Can I put a fence in my front yard in Hazel Crest?
No. Section 6-40 bans front-yard fences; side and rear fences may be up to 6 feet tall, with the finished side facing the neighbor.
How long does a permit take?
Allow 7 to 10 days. Solar jobs up to $30,000 have a streamlined review that aims for approval in three days.
What does contractor registration cost?
$125 a year, expiring each April 30, with insurance certificates naming the village; jobs over $10,000 also need a $10,000 surety bond.
How much is an electrical permit for a new house?
$75 with a 100-amp service or $125 with a 200-amp service; the minimum electrical fee is $50 and a re-inspection is $35.
Do I need an inspection to sell my house?
Yes. The point-of-sale inspection costs $100 including one re-inspection, should be booked three weeks before closing, and violations must be fixed or taken on by the buyer.
Do gutters need a plumbing permit?
No. The plumbing permit application states that gutters do not need a permit.
How do I ask for a zoning variance?
Write to the Zoning Administrator at Village Hall, 3601 West 183rd Street, with copies of your survey showing the work; call extension 110 with questions.
Hazel Crest permit search and official resources
For copies of earlier permits, inspection reports or plans, file a Freedom of Information Act request with the Village Clerk’s office using the village’s FOIA form and method-of-request form from its FOIA page. Complaints about property conditions go to Inspectional Services in writing during business hours.
Inspections are where schedules slip.
Get a free quote →- Inspectional Services and Document Center
- Residential building permits
- Permit process information (2022)
- Building permit application
- Contractor registration application
- Electrical permit application
- Plumbing permit application
- Fence permit application and Section 6-40
- Point-of-sale inspection procedures
- Business operations permit procedure (2024)
- Solar permit checklist
- Zoning fact sheet for solar PV
- FOIA requests
- FEMA Community Status Book, Illinois
Simplify Hazel Crest permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Hazel Crest sooner?
Let Alliance prepare, file, and track your Hazel Crest permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Hickory Hills
Read guide →Justice
Read guide →Henry County Building Permit Guide
Read guide →Highland Park Building Permit Guide
Read guide →Hinsdale Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Hazel Crest permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.