Inside Granite City, permits come from the Building & Zoning Department on the bottom floor of City Hall (618-452-6218), led by Building & Zoning Administrator Greg Koberna. Almost all construction, remodeling, repair and property-improvement work needs a permit, and a basic building permit costs $50 plus $4 for every $1,000 of value over $3,000, with a $100 plan review for homes.
What requires a building permit in Granite City?
Granite City starts from the position that all work needs a permit unless it is specifically exempted; painting and replacing flooring are the exemptions the department names. Its FAQ gives the everyday cases: renovating, remodeling or adding onto a home or business, changing a building’s use, finishing a basement, adding a room, building a deck, new framing or foundation work, electrical or plumbing work, fences, and any above-ground or in-ground pool. In the city’s words, any swimming pool, above or below ground, or any hot tub or spa with 24 inches or more of water requires a building permit, and the city enforces electrical and barrier requirements on new and existing pools, noting that portable and inflatable pools carry the same risks.
Permit needed
- New buildings, additions and room additions
- Remodeling, renovation and repairs
- Basement finishing and decks
- Change of use of a building
- Fences and roofs
- Swimming pools, hot tubs and spas
- Electrical, plumbing and mechanical work
- Razing a structure and removing tanks
Generally exempt
- Painting
- Replacing flooring
Pools count as accessory structures and must stay at least 6 feet from side and rear property lines. Before demolishing any structure, the owner must notify neighboring property owners and obtain written releases from every utility company, and inspections are made both before and after the work.
What Granite City decides and what the state holds
Granite City chooses its own codes. The department lists the 2018 International Building, Residential, Mechanical, Existing Building and Property Maintenance Codes, the 2017 National Electrical Code and the 2021 International Fire Code, together with the Granite City Zoning Code. The latest Illinois Plumbing Code and Illinois Accessibility Code apply as state codes, and when a home or building is converted to commercial use, places of public accommodation must be made accessible.
Granite City building department: who handles permitting
The Building & Zoning Department handles permits, construction inspections and certificates of occupancy, administers the zoning ordinance and supports the Plan Commission, the Board of Appeals and the Graphic Review Board. Its Building & Zoning Administrator is Greg Koberna. Building permit review is handled administratively by the department and may run alongside final site plan review; some plans also go to the department’s site plan review meetings with the Engineering, Fire and Police Departments. For larger or more complex buildings the city may send the plans to an outside professional code consulting firm, with the owner paying for that review.
Short on time to read all of this?
Get a free quote →The department works only inside the city limits. Land outside them is unincorporated Madison County, permitted by Madison County Building & Zoning (see our Madison County guide), unless it is first annexed into the city, which the Plan Commission and City Council review together with its zoning.
| Detail | Information |
|---|---|
| Office | Building & Zoning Department, bottom floor of City Hall, 2000 Edison Avenue, Granite City, IL 62040 |
| Phone | 618-452-6218 |
| Fax | 618-452-6246 (zoning look-ups by address and parcel ID) |
| City Clerk | City Clerk’s Office, 2000 Edison Ave. |
| Occupancy inspections | Slots 8 a.m. to 4 p.m., Monday to Friday |
Granite City permit types
A building permit application asks for the legal description and parcel ID, the existing and proposed use, the zoning, the cost of the improvement and the square footage, with a sketch plan showing the layout and dimensions of the work; setbacks and floor-area limits come from the zoning code. A Certificate of Zoning Compliance is issued when the proposed building meets the land-use rules of the zoning ordinance.
Residential permits
- Building permit. New homes, additions, remodels, repairs and accessory buildings use the basic permit, priced on value, plus the $100 residential plan review.
- Roof and fence. A residential roof is $40 ($10 more with gutters and downspouts) and a fence $40.
- Electrical. Needed before rewiring or significant remodeling, with a plan showing the use, outlet locations and service size.
- Plumbing. Needed for renovating, remodeling or adding plumbing; give the inspector two business days for each appointment.
- Razing. $40, with a $1,000 cash demolition bond for residential work under Ordinance 7850.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
New commercial and residential developments submit a building permit application, building plans and a site plan, which are reviewed for zoning compliance and the city’s development standards. Commercial plan review is $250 and industrial $500, commercial roofs are priced on value like a building permit, signs cost $80 plus $2 a square foot, and communication towers $750 plus permit fees. Some commercial uses with added safety concerns need annual inspections, and a business occupancy permit costs $200.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Annexation and zoning. Land added to the city is usually rezoned at the same time; annexations go to the Plan Commission and City Council.
- Pre-application meeting. For subdivisions and developments, the city suggests preparing a concept plan and booking a staff meeting on 618-452-6218 before the preliminary plat.
- Plats. Final plats need the other certificates of approval, such as a Flood Hazard Certificate, are approved by the City Council and are filed with Madison County.
- Planned unit developments. Sites in PUD districts follow the city’s separate PUD procedure.
- Downtown historic district. Exterior changes need a Certificate of Appropriateness; historic review is now handled by the Plan Commission and carries no filing fee.
- Floodplain. The city will not say whether a lot is in a floodplain, for liability reasons, but staff help locate it on the FEMA map, and a flood zoning letter costs $20.
Granite City permit costs and fees
Fees come from the department’s Permit Fee Schedule, linked from its FAQ page; the posted schedule carries no adoption date or ordinance number apart from the demolition bond (Ordinance 7850) and sewer tap-on fees (Ordinance 8278).
| Item | Fee |
|---|---|
| Basic building permit (new, renovation, repair or accessory building) | $50 plus $4 per $1,000 of value over $3,000 |
| Plan review: residential / commercial / industrial | $100 / $250 / $500 |
| Residential roof | $40 (plus $10 with gutters and downspouts) |
| Commercial roof | $50 plus $4 per $1,000 over $3,000 |
| Fence / razing | $40 / $40 |
| Residential demolition cash bond (Ord. 7850) | $1,000 |
| Sewer tap-on: residential / commercial / industrial (Ord. 8278) | $250 / $500 / $1,000 |
| Sewer lateral / excavation and locating | $50 / $20 |
| Electrical permit / each inspection | $40 / $20 (rough, final, misc.) |
| Electrical service upgrade 100 / 200 amp | $55 / $65 |
| New construction service 100 / 200 / 201–400 amp | $70 / $80 / $90 |
| Plumbing permit / each inspection / fixtures | $40 / $20 / $8 each |
| Mechanical permit / alterations beyond minor work | $40 / $10 per $1,000 |
| Inspection failed after the second inspection | $40 (electrical, plumbing or mechanical) |
| Flood zoning letter | $20 |
| Plan Commission / Board of Appeals filing | $150 / $50, plus postage and recording |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the schedule: a $20,000 room remodel pays the $50 basic fee plus $4 for each $1,000 of the $17,000 above $3,000 ($68), or $118, plus the $100 residential plan review and any electrical or plumbing permits. A new furnace with ductwork under 200,000 BTU adds a $30 fixture fee to the $40 mechanical permit, and a replacement air conditioner under 5 tons $10.
Trade permits and who may pull them
Electrical, plumbing and mechanical permits are all issued by Building & Zoning, each with a $40 permit fee and per-inspection or per-fixture charges, and the trade inspectors check rough work before walls are closed and again at final.
- Electrical: the city enforces the 2017 National Electrical Code. Temporary utilities are $25 and a temporary pole $30, service fees rise with amperage up to $600 for 3,001 to 6,000 amps, and an electric sign circuit is $20.
- Plumbing: work follows the Illinois Plumbing Code under a plumber licensed by the Illinois Department of Public Health. Backflow preventers cost $25 each for record keeping, or $150 each when tested by the city inspector, and fire sprinkler systems $115 plus $1 a head.
- Mechanical: fixture fees range from $5 for a flue damper to $30 for commercial cooking hoods or a new furnace with ductwork, and alterations beyond minor work pay $10 per $1,000.
- Fire code: the 2021 International Fire Code applies, and the Fire Department takes part in the department’s site plan review meetings.
The department’s pages and fee schedule do not describe a local contractor license or registration fee.
Rather not deal with the Granite City building department?
Get a free quote →How to apply for a Granite City building permit
Land outside the limits is unincorporated Madison County unless annexed first.
Visit the office or fax the address and parcel ID to 618-452-6246 for a written zoning reply.
Line up any variance, special use, rezoning, historic or plat approval before the permit.
Legal description, parcel ID, use, zoning, cost and square footage, a sketch or site plan and construction documents.
File the building application with the department; larger projects also go through site plan review.
Pay the permit and plan review fees, then call in each inspection.
Review, corrections and what causes delay
Building plans are reviewed administratively, and the department publishes no fixed review time. A permit cannot be approved if the structure breaks the zoning ordinance, so a variance, special use or rezoning has to be won first; each goes to a public hearing, and rezoning and variance requests need notice to neighbors within 300 feet. Special uses are decided by the Plan Commission, with the City Council given 21 days to reaffirm, modify or overturn the decision, while the Commission’s recommendations on rezonings and variances go to the Board of Appeals and the City Council. An outside code consultant review on a complex building adds time and cost.
Inspections and certificates in Granite City
The permit holder or a designee calls each inspection in to the department, giving at least 24 hours’ notice and allowing until the end of the following work day for the visit; plumbing inspections need two business days. The typical required inspections are footing (with every property corner located and marked, so setbacks can be checked), foundation or basement walls before concrete, framing and masonry, rough plumbing, electrical and mechanical before concealment, wallboard before taping, the public pre-sidewalk inspection before concrete, and a final covering structure, trades and infrastructure. House numbers, sidewalks and final yard grading must be done before occupancy.
A certificate of occupancy is issued after all final inspections pass. For existing buildings, the city requires occupancy inspections and certificates for rental properties and for properties transferred by contract for deed; the department’s main page says owner-occupied homes are no longer inspected when they are bought, although the posted fee schedule still lists a $50 home-sale change-of-ownership inspection. Rental occupancy permits cost $50, and a rental change of ownership or new rental $200 plus $10 for each additional unit.
Want this handled start to finish?
Get a free quote →Illinois building code in Granite City
Granite City enforces the 2018 International Building, Residential, Mechanical, Existing Building and Property Maintenance Codes, the 2017 National Electrical Code, the 2021 International Fire Code, the Illinois Plumbing and Accessibility Codes and its own zoning code. FEMA’s Community Status Book lists the City of Granite City (community 170443) as participating in the National Flood Insurance Program, with a current flood map dated June 1, 1978, and no Community Rating System class.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Granite City building permit FAQs
How much is a building permit in Granite City?
$50 plus $4 for each $1,000 of value over $3,000, plus a $100 plan review for homes ($250 commercial, $500 industrial).
What work does not need a permit?
The department names painting and flooring replacement as generally exempt; everything else needs a permit unless specifically exempted.
Do I need a permit for a pool or hot tub?
Yes. The city requires a building permit for any swimming pool, above or below ground, or any hot tub or spa with 24 inches or more of water; pools must be at least 6 feet from side and rear lot lines.
How much is a roof permit?
$40 for a home, plus $10 if gutters and downspouts are included; commercial roofs are priced on value.
How do I find out whether my lot is in a floodplain?
The city will not certify it, but staff will help you locate the lot on the FEMA map; a flood zoning letter costs $20.
When does the Plan Commission meet?
The first Thursday of each month at 7 p.m. at City Hall; the Board of Appeals meets the same day at 5 p.m.
Do I need an occupancy inspection when I buy a house?
Not for an owner-occupied purchase, according to the department; rentals and contract-for-deed transfers still need one.
Inspections are where schedules slip.
Get a free quote →Granite City permit records and official resources
Building & Zoning holds permit and occupancy records for city properties. Public records requests must be in writing and can be made in person, by mail or electronically on the city’s request form; the city answers non-commercial requests within five business days and commercial ones within 21, with the first 50 pages free and 15 cents a page after that.
- Granite City Building and Zoning Department
- Building and Zoning FAQs and adopted codes
- Granite City permit fee schedule
- Planning Commission and public hearings
- Historical Architecture Review (downtown district)
- Freedom of Information requests
- FEMA Community Status Book, Illinois
- Illinois Department of Public Health plumbing
Simplify Granite City permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Granite City sooner?
Let Alliance prepare, file, and track your Granite City permits while your crew stays on the job.
More Illinois permitting guides
Madison County
Read guide →Troy
Read guide →Alton
Read guide →Grayslake Building Permit Guide
Read guide →Grundy County Building Permit Guide
Read guide →Hancock County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Granite City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.