Skip to main content
Municipal GuideIllinoisTroy · Madison County

Troy, Illinois Building Permit Guide

To get a building permit in Troy, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of Troy’s Building & Zoning Department at 116 E. Market Street issues building permits and makes inspections inside the city; applications and inspection requests go to it by email.

Authority: City of Troy Building & ZoningFiling: By email to buildingzoning@troyil.usPhone: 618-667-8734 ext. 4
Permit office
Building & Zoning116 E. Market Street, Troy
Limited use permit
$50 or $100Sheds, decks, pools, solar and more
Inspection window
8 a.m. to 1:30 p.m.Request 24 hours ahead
Fences
No permitHeight limits still apply

In the City of Troy, building permits come from the Building & Zoning Department at 116 E. Market Street (618-667-8734 ext. 4, weekdays 7 a.m. to 3:30 p.m.), led by Building & Zoning Director Ann Byrd. Permit applications and inspection requests are emailed to buildingzoning@troyil.us; smaller projects such as sheds, decks, pools and solar panels use a $50 or $100 limited use permit, and the city’s building page says it has implemented new codes, posted as Ordinance 2025-33 (2021 International codes).

What requires a building permit in Troy?

Troy requires a building permit for all new construction, additions, renovations and structural changes, and asks owners to describe their project to the department before starting anything. The city sorts the work into four permit forms: a residential building permit for new homes, additions and garages; a residential remodel permit for repairs and remodeling, including fire and wind damage; a commercial building permit for new commercial buildings and additions; and a limited use permit for smaller jobs. A mobile home permit is needed to place a mobile home in the city.

Limited use permit

  • Carports and sheds
  • Decks and roof coverings over a deck or patio
  • Season rooms without heating or air conditioning
  • Above-ground and in-ground pools and hot tubs
  • Electric service upgrades
  • Solar panel installations
  • Demolition

No permit

  • Fences and walls (height and placement rules still apply)

Fences do not need a permit, but front-yard fences are limited to 4 feet and side and rear fences to 8 feet in residential areas, barbed wire and other sharp-pointed fences are banned in residential areas, and no fence may block the flow of ground water or the view of traffic. Building without a permit or ignoring a stop work order can be fined $100 to $750, with each day counted as a separate offense.

What Troy decides and what the state holds

Troy chooses its own codes. The city’s Building Information page says it has implemented new codes and posts Ordinance 2025-33, which repeals Ordinance 2013-09 (the 2012 codes) and adopts the 2021 International Building, Residential, Existing Building, Fire, Fuel Gas, Mechanical, Property Maintenance and Swimming Pool and Spa Codes and the 2020 National Electrical Code, with local amendments; the city’s code list pairs them with the 2024 International/Illinois Energy Conservation Code. The posted copy of the ordinance leaves the passage date and signatures blank, so ask the department for the passed version if the date matters. Plumbing follows the Illinois Plumbing Code and accessibility the Illinois Accessibility Code, and the residential form reminds applicants that state law requires compliance with the energy code.

Short on time to read all of this?

Get a free quote →

Troy building department: who handles permitting

The Building & Zoning Department is the city’s code office: under Ordinance 2025-33 it implements and enforces the building codes, and its Director and two inspectors review permit applications, issue permits for new construction and alterations, and carry out the inspections. The department also inspects rental property and issues occupancy permits under the property maintenance code, administers the subdivision and zoning codes, registers and inspects new businesses, issues sign permits and liquor licenses, and handles property maintenance and animal complaints. It works with the Planning Commission, which recommends to the City Council on planning and zoning, the Zoning Hearing Officer, the Zoning Board of Appeals, which rules on variances, and the City Engineer, who reviews development plans for the subdivision code.

Troy issues permits only inside the city limits; nearby unincorporated land is permitted by Madison County Building & Zoning (see our Madison County guide).

Troy permit contacts
DetailInformation
OfficeBuilding & Zoning Department, 116 E. Market Street, Troy, IL 62294
Phone618-667-8734 ext. 4; City Hall 618-667-9924
Fax618-667-0694
Email (permits and inspections)buildingzoning@troyil.us, which reaches everyone in the department
HoursMonday to Friday, 7 a.m. to 3:30 p.m.

Troy permit types

Each permit has its own form on the city’s Building Information page, with an information sheet for common projects (carports, garages and sheds; decks, covers and season rooms; demolitions; electric service upgrades; erosion control; finished basements; pools, hot tubs and spas, with a homeowner acknowledgement; solar; and mobile homes). Completed forms are emailed to the department.

Residential permits

  • New homes, additions and garages. The residential packet asks for every sub-contractor and license number (plumbers by their 055- number), floor areas by level, setbacks, egress windows and lot area, a plot plan showing pins, setbacks from property lines (not from the curb), driveway, utilities, drainage arrows and erosion control, and a truss and specification sheet. New homes need at least 1,200 square feet of living area, or 900 square feet a unit for a two-family home.
  • Notarized certificates. Before a house permit is issued, the contractor signs a notarized certification of awareness of the 2024 Illinois Energy Conservation Code, and the plumber a notarized certification of the plumbing installation with Illinois license numbers.
  • Remodels and repairs. The remodel form covers remodels, repair or replacement and fire or wind damage.
  • Limited use. Carports, pools and sheds need a sketch with size and distances to lot lines; decks, roof covers, season rooms and solar need structural details, and a survey or exposed pins is required for work within 3 feet of a setback.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

The commercial building permit form is to be completed by the architect or design professional and lists the general contractor and every trade, with license numbers for the design professional, plumber and roofer, along with the parcel ID, current zoning and development name.

What comes before the building permit

  • Zoning and subdivision. Setbacks and lot rules come from the city’s zoning and subdivision codes; variances go to the Zoning Board of Appeals and development plans to the City Engineer.
  • Accessory building limits. Sheds and garages go in back yards only, 5 feet from lot lines (20 feet on lots of two acres or more), at most one story and 15 feet; permanent ones up to 900 square feet and temporary ones 600, no more than two per lot with 900 square feet combined.
  • Erosion control. Silt fence goes up before any grading or clearing wherever water leaves the lot, and must stay until permanent vegetation is established.
  • Walkout basements. Must be designed by a professional engineer to set minimum elevations and grading.
  • Floodplain. Troy’s building information page and permit packets do not set out a separate floodplain permit.

Troy permit costs and fees

The only permit fees printed on the city’s current forms are the two limited use rates, shown on the limited use permit dated July 10, 2026. Fees for residential building, remodel and commercial permits are not printed on those forms, so ask the department for the figure; every building permit fee is non-refundable.

Troy limited use permit fees (form dated July 10, 2026)
ProjectFee
Pre-fab carport$50
Demolition$50
Electric service upgrade (with bypass)$50
Above-ground pool (with homeowner acknowledgement)$50
Shed, not metal-sided$50
Framed carport$100
Deck$100
In-ground pool (with homeowner acknowledgement)$100
Roof covering over a deck or patio$100
Season room (no heating or air conditioning)$100
Solar panels$100

Rather talk it over?

Call 1-855-478-4290 →

A limited use permit is good for 6 months. A full building permit expires one year after issue, or 6 months after work is suspended or abandoned; reviving an expired permit takes a letter giving the reason for the delay and a completion date, and the original fee is charged again for extensions beyond 3 months. A reinspection fee is charged after a missed appointment or repeated noncompliance. Under the city’s rental rules, an owner found violating the rental registration requirements pays an involuntary registration fee of $150 per unit, and rental occupancy inspection fees are set by the City Council in the code’s fee schedule appendix.

Trade permits and who may pull them

The city’s building page lists no separate trade permit forms: electrical, plumbing and mechanical work is listed on the building, remodel or commercial application, and an electric service upgrade on its own uses the $50 limited use permit. The city inspects the trades at the rough-in and service stages.

  • Electrical: under the city’s amendments to the 2020 NEC, new construction and additions of at least 25% of the existing floor space need a 200-amp minimum service, conductors must be copper (except utility lines), branch circuits at least No. 12 wire, space-saver, twin and tandem breakers are banned in new construction, a 200-amp panel may hold at most 42 circuits and a 125-amp panel 24, and every panel keeps a 2-pole space for expansion. Arc-fault protection is required in all bedrooms.
  • Plumbing: the plumber signs a notarized certificate with an Illinois plumbing contractor (055-) and plumbing (058-) license number; plumbing licenses come from the Illinois Department of Public Health. The city inspects every sewer tap.
  • Roofing: roof covers over decks and patios must be built by an Illinois-licensed roofer, with the 104- license number on the form.
  • Solar: installers must be licensed in Illinois and give their distributed generation and DER numbers.

Rather not deal with the building department?

Get a free quote →

How to apply for a Troy building permit

1. Talk to the department

Describe the project; staff explain what is needed and can provide an aerial view with property measurements.

2. Pick the form

Residential building, remodel, commercial, limited use or mobile home permit.

3. Complete the packet

For a new home, pages 1 to 7: application, plot plan, specification sheet and the two notarized certificates.

4. Email it

Send the forms and plans to buildingzoning@troyil.us.

5. Pay and receive approval

Pay the non-refundable fee; the code official signs the approval and the owner keeps the information pages.

6. Request inspections

Email each request 24 hours ahead with the permit number, address, inspection type and time wanted.

Review, corrections and what causes delay

The city publishes no review time. Both notarized certificates must be submitted and approved before a house permit is issued, so an unsigned or un-notarized certificate holds up the permit. Projects within 3 feet of a required setback wait for a survey or exposed property pins, and walkout basements need an engineer’s grading design.

Inspections and certificates in Troy

Every inspection needs 24 hours’ notice by email, though the department tries to make same-day visits for requests received before 8:30 a.m.; inspections are only made between 8 a.m. and 1:30 p.m. Property pins must be exposed with string lines up, and no inspection is made if erosion control is missing or failing; continued failures can bring a stop work order or a notice of non-compliance to the Illinois EPA, with any fines falling on the contractor or owner.

A new house moves through eight inspections: erosion control, footing (rock and drain in place, pins and strings set), pre-pour foundation, post-pour foundation (damp-proofing, drains and anchor bolts), rough-in (all trades, trusses, headers and deck piers, with truss drawings on site), electric service, drywall before taping, and final. Decks are self-standing, lag-bolted to the house, on piers at least 30 inches deep that are inspected before the pour, with 36-inch guards on decks over 30 inches high. Before an occupancy permit is issued, construction and rough grading must be complete, materials cleared from the lot and neighboring lots, and the lot seeded and mulched or sodded, with hardship allowances for poor ground conditions. Sites need a rock drive at least 4 inches deep and a dumpster, which up to three adjacent sites may share. Rental units need an occupancy permit and an inspection under the property maintenance code at each change in tenancy.

Want this handled start to finish?

Get a free quote →

Illinois building code in Troy

Under Ordinance 2025-33 Troy enforces the 2021 International Building Code (with Appendices G and J), Residential, Existing Building, Fire (Appendices B to E), Fuel Gas, Mechanical (Appendix A), Property Maintenance (Appendix A) and Swimming Pool and Spa Codes, the 2020 National Electrical Code with local amendments, the energy code its code list gives as the 2024 International/Illinois edition, and the Illinois Plumbing and Accessibility Codes. Its local design values include a 36-inch frost line, 20 psf ground snow load and seismic category C, and the city replaced the residential code’s garage sprinkler section with a 5/8-inch Type X gypsum separation rule.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Troy building permit FAQs

How do I apply for a building permit in Troy?

Fill in the right form from the city’s Building Information page and email it with plans to buildingzoning@troyil.us; the department’s office is at 116 E. Market Street.

Do I need a permit for a fence?

No. Fences and walls need no permit, but front-yard fences may be no taller than 4 feet and side and rear fences 8 feet in residential areas.

How much is a permit for a shed or deck?

A shed that is not metal-sided is a $50 limited use permit; a deck is $100. Limited use permits are good for 6 months.

Can I get a same-day inspection?

Possibly. Requests need 24 hours’ notice, but the department tries to inspect the same day when the request arrives before 8:30 a.m.

Which codes does Troy use?

The 2021 International codes and the 2020 National Electrical Code, which the city says it has implemented under Ordinance 2025-33, with the Illinois plumbing, energy and accessibility codes.

How long is a building permit valid?

One year from issue, or 6 months after work stops; extensions beyond 3 months cost the original fee again.

Is there a minimum house size?

Yes. A single-family home needs at least 1,200 square feet of living area, and each unit of a two-family home 900 square feet.

Troy permit records and official resources

Building & Zoning keeps the city’s permit and inspection files and can also provide an aerial view and measurements of a property; ask by email at buildingzoning@troyil.us or on 618-667-8734 ext. 4.

Inspections are where schedules slip.

Get a free quote →

Simplify Troy permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Troy sooner?

Let Alliance prepare, file, and track your Troy permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Troy permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.