Skip to main content
Municipal GuideIllinoisVernon Hills · Lake County

Vernon Hills, Illinois Building Permit Guide

To get a building permit in Vernon Hills, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Vernon Hills’ Community Development Department reviews and issues building permits at 290 Evergreen Drive, charging 1% of the project cost above $5,000 plus a refundable completion bond, payable by cash or check.

Authority: Community Development DepartmentFiling: In person, mail or drop boxPhone: 847-367-3700
Authority
Community Development290 Evergreen Drive
Typical fee
1% of cost over $5,000Plus plan review and bond
Review time
About 15 business daysResidential; 20 commercial
Contractors
No village registrationLicense copies for 3 trades

In the Village of Vernon Hills, the Community Development Department at 290 Evergreen Drive (847-367-3700) reviews permit applications, inspects construction and issues certificates of occupancy; its director, Andrew C. Jennings, is the village’s building official under the code. A new building code took effect on March 1, 2026. Residential permits cost $30, $50 or 1% of the project cost depending on its size, plus a plan review fee and a completion bond that is refunded after the final inspection. Fees are paid by cash or check only.

What requires a building permit in Vernon Hills?

The village’s permit forms cover almost every change to a house or business, from a water heater to a new home. Its 2026 building code lists the few residential jobs that need no permit, and the residential permit guide adds some everyday items.

Permit needed

  • New homes, additions, basements and remodels
  • Decks, pergolas and gazebos
  • Fences
  • Patios, stoops, walkways and driveways
  • Sheds built on site or larger than 40 square feet
  • Pools, spas and hot tubs, except prefabricated pools under 24 inches deep
  • Roofs, siding, water heaters, HVAC and sewer repairs
  • Generators, solar panels and irrigation systems
  • Electrical and plumbing work
  • Commercial build-outs, signs, tents, racking and fire systems

No permit

  • Painting, papering, tiling, carpeting, cabinets and countertops
  • Prefabricated pools under 24 inches deep
  • Swings and playground equipment
  • Window awnings on an exterior wall
  • Modular sheds of 40 square feet or less
  • Same-size window and door replacement, basketball hoops and tree removal

What Vernon Hills decides and what the state holds

The Village Board adopted a new building code by Ordinance 2026-008 on February 3, 2026, effective March 1, 2026. It brings in the 2024 International Building, Residential, Mechanical, Fuel Gas, Fire, Property Maintenance, Existing Building and Swimming Pool and Spa Codes, the 2023 National Electrical Code and the 2021 International Solar Energy Provisions, with local amendments in Chapter 5 of the Village Code. Plumbing, energy and accessibility follow the current Illinois Plumbing, Energy Conservation and Accessibility Codes. Projects that won zoning approval before February 3, 2026 could still use the older codes if the first permit application was filed before June 1, 2026. Some application forms still list the 2018 codes; the village asks applicants to cite the current codes anyway. One local amendment stands out: the village’s version of the International Building Code requires automatic sprinklers in new buildings of every use group, except utility buildings under 1,000 square feet and temporary accessory structures.

Short on time to read all of this?

Get a free quote →

Vernon Hills building department: who handles permitting

The Community Development Department reviews building permit applications, inspects construction, issues certificates of occupancy and handles property maintenance and building code complaints. Under the 2026 code, every reference to the building official means the Director of Community Development. The department also runs the development review process and supports the Planning and Zoning Commission. Engineering and site work permits go through the Public Works Department at 490 Greenleaf Drive (847-367-3726), and fire alarm, sprinkler and racking permits are filed with Community Development, which forwards them to the reviewing agency. Land outside the village limits is permitted by Lake County.

Vernon Hills permit contacts
DetailInformation
Community Development290 Evergreen Drive, Vernon Hills, IL 60061
Phone and fax847-367-3700; fax 847-367-2541
Plans by e-mail (large projects)permits@vhills.org
Department headAndrew C. Jennings, AICP, Director of Community Development
Permit counter hoursMonday to Friday, 8:30 a.m. to 4:30 p.m.
Public Works (engineering permits)490 Greenleaf Drive, 847-367-3726

Vernon Hills permit types

The village publishes a separate application or handout for each kind of work. Residential jobs use the general residential application, while a new home, an addition, a basement or a remodel uses the residential new construction permit. Commercial jobs use the commercial application and the commercial permit guide. Roofs, siding, water heaters, furnaces and air conditioners, sewer repairs and similar jobs are “over the counter” permits with no plan review, released immediately when staff are available.

Residential permits

The residential checklist asks for the application, two highlighted copies of the plat of survey, the contract signed by the homeowner, HOA approval where one applies, a contractor list, license copies for the electrician, plumber and roofer, and a J.U.L.I.E. dig number. Some local standards from the residential guide:

  • Decks: at least 7 feet from side and rear lot lines, piers at least 42 inches deep, guardrails at 18 inches above grade, and a 40-pound live load.
  • Fences: no taller than 6 feet, within 12 inches of the lot line, posts set in concrete 42 inches deep, and no side-by-side fences.
  • Patios: at least 6 feet from any lot line and never in an easement.
  • Driveways: no wider than the garage (20 feet where there is no garage or a narrower one), at least 5 feet from the property line, and a $50 right-of-way waiver letter if brick pavers or stamped concrete go into the apron.
  • Roofs: no more than two layers, shingles with at least a 25-year warranty, ice and water shield 24 inches inside the wall line, and cedar shakes in the Sugar Creek, Pebble Beach, Royal Birkdale and Sawgrass subdivisions.
  • New homes: EV charging provisions under the Electric Vehicle Charging Act, in effect since January 2026, which substantial renovations and conversions also trigger, and a Watershed Development Permit.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial permits need three sets of plans on 24 by 36-inch sheets, a copy of the proposal, property management approval where applicable, the contractor list and licenses, a Lake County Public Works sewer receipt, a Lake County Health Department report and a certificate of insurance. Structural review, when needed, goes directly to one of three outside engineering firms the village lists, which bill the applicant and confirm approval to the village. Building plans go to Community Development, and digital submittal for large projects can be arranged case by case.

What comes before the building permit

  • Zoning entitlement. A village building permit cannot be issued until any zoning approval is complete; the Planning and Zoning Commission reviews special use and variation petitions and code amendments for the Village Board.
  • Site work. Engineering and site work permits are uploaded through the village’s documents portal; large site projects need a performance guarantee set by the Engineering Division.
  • Sewer, water and health. Utility and health permits are filed directly with Lake County, and the village advises calling Lake County Public Works (847-377-7500) early about connection and infrastructure impact fees, which can be significant.
  • HOA approval. Submit proof of any homeowners’ association approval with the permit.

Vernon Hills permit costs and fees

Building fees are set in Chapter 25, Comprehensive Fees and Penalties, of the Village Code. The village links its Building Department Permit Fees schedule from the permit page, and its permit FAQ gives the same residential figures as a calculator.

Rather talk it over?

Call 1-855-478-4290 →
Vernon Hills building permit fees (village fee schedule and permit FAQ)
ItemFee
Residential permit, project $1,500 or less$30
Residential permit, $1,501 to $5,000$50
Residential permit, $5,001 or more1% of the project cost
Residential plan review0.2% of the cost (20% of the permit fee), $25 minimum; none for roofs, siding, HVAC, water heaters, driveways, fences, patios and kit sheds
New single-family home$1.00 per sq ft of habitable area, plus $0.20 per sq ft plan review
Commercial permit / plan review1% of cost, $75 minimum / 20% of permit fee, $75 minimum
Completion bond (refundable)$50 up to $5,000; $150 to $15,000; 1% above, capped at $5,000
Water heaterNo permit fee; $50 bond
Re-inspection / renewal$50 / 20% of the permit fee, $30 minimum
Work started without a permitDouble fee ($50 minimum); quadruple for a repeat within 12 months

Worked example from the FAQ calculator: a $20,000 kitchen remodel pays a $200 permit fee (1%), a $40 plan review fee (0.2%, above the $25 minimum) and a $200 completion bond (1%), or $440 in all, and the $200 bond is refunded 3 to 5 weeks after the final inspection. New homes have separate fees, including fire district, park, school and other charges listed on the new construction application, and fire department fees on commercial work range from $200 to $319 or more. Payment is by cash or check only, payable to the Village of Vernon Hills; the village’s FAQ says card payment may be accepted later in 2026, so ask whether it has started.

Trade permits and who may pull them

Vernon Hills does not register or license contractors. Instead, license copies must come with the application, no later than 2 days before the permit is issued, for three trades:

  • Electricians: a copy of a registration from a municipality that tests electricians.
  • Plumbers: the Illinois plumber’s license (055) and contractor registration (058). Water heaters must be installed by a licensed plumber or, in a single-family home, by an owner who lives there.
  • Roofers: a copy of the Illinois roofing license.

Rather not deal with the building department?

Get a free quote →

On projects worth more than $100,000, the general contractor must also provide a certificate of insurance covering general liability and workers’ compensation for the property, naming the village as an additional insured. License copies are not accepted by fax. The village strongly recommends that the contractor post the completion bond even when the owner pays for the permit.

How to apply for a Vernon Hills building permit

1. Confirm the address

Use the village boundary map to check the property is in Vernon Hills, not unincorporated Lake County.

2. Pick the right form

Choose the residential, new construction or commercial application and the handout for your project.

3. Assemble the packet

Add the plat of survey, plans, signed contract, HOA approval and license copies.

4. Calculate and pay

Work out the plan review, permit and bond amounts and include one check, or pay at the counter.

5. Deliver it

Mail it, leave it in the Village Hall vestibule basket or after-hours drop box, or bring it to the front desk.

6. Receive the permit

If fees were paid up front, the placard, receipts and stamped plans are e-mailed to you.

Review, corrections and what causes delay

Over-the-counter permits are released immediately, or within a business day if mailed or dropped off. The permit page puts typical turnaround at 15 business days for residential projects and 20 for commercial, while the FAQ says residential plan reviews take 7 to 10 business days; applications are handled in the order received and there is no expedited review. E-mail filing is accepted only for complete packets of permits with no fee or no plan review fee and no more than five letter-size pages, and faxed applications are refused. An application not pursued for 180 days is treated as abandoned.

Inspections and certificates in Vernon Hills

The village does not set up inspections automatically. Call 847-367-3700 with the permit number by 3:30 p.m. for a next-day inspection (the department’s overview page asks for calls before 3 p.m.); there are no same-day, Saturday or Sunday inspections. Outdoor and commercial inspections are booked for a morning window (8:30 to 11:30 a.m.) or an afternoon window (1 to 2:30 p.m.), and inside residential and fire inspections get specific times. Outdoor inspections need no one on site as long as the permit placard and plans are posted, for example in a gallon zip-top bag. Missed inspections can cost the completion bond.

Want this handled start to finish?

Get a free quote →

A residential permit lapses if work does not start within six months, stops for six months, or is not finished within a year of starting; one renewal for 20% of the fee is allowed. After the foundation is built and before framing starts, a new building needs an as-built plat of survey by an Illinois registered land surveyor, and a final as-built survey comes before the certificate of occupancy. New homes and tenant spaces need a certificate of occupancy, with a $100 fee for a temporary residential certificate. Construction is allowed from 7 a.m. to 7 p.m. on weekdays and 8 a.m. to 5 p.m. on Saturdays, never on Sundays.

Illinois building code in Vernon Hills

Vernon Hills enforces the codes adopted by Ordinance 2026-008 as Chapter 5 of the Village Code. FEMA’s Community Status Book lists the Village of Vernon Hills (community 170394) as participating in the National Flood Insurance Program, with a current flood map dated September 18, 2013; the village is not in the Community Rating System.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Vernon Hills building permit FAQs

How much is a building permit in Vernon Hills?

$30 for jobs up to $1,500, $50 up to $5,000 and 1% of the cost above that, plus plan review where it applies and a refundable completion bond.

Do contractors register with the village?

No. Vernon Hills only requires copies of the electrician’s, plumber’s and roofer’s licenses.

Can I pay by credit card?

Not according to the village’s pages: permit fees are cash or check only, payable to the Village of Vernon Hills.

Do I need a permit for a shed?

Yes, unless it is a modular or prefabricated shed of 40 square feet or less.

How do I schedule an inspection?

Call 847-367-3700 with the permit number by 3:30 p.m. for the next weekday.

When is my completion bond refunded?

About 3 to 5 weeks after all final inspections are passed.

Which building codes apply now?

The 2024 International Codes and 2023 National Electrical Code, effective March 1, 2026, even where a form still lists 2018 codes.

Vernon Hills permit search and official resources

For the status of an application or an inspection result, call Community Development at 847-367-3700; inspectors return calls when they are back in the office. The permit placard carries the permit number used for every inspection and question. Older permit files and plans can be requested from the village under the Illinois Freedom of Information Act.

Inspections are where schedules slip.

Get a free quote →

Simplify Vernon Hills permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Vernon Hills sooner?

Let Alliance prepare, file, and track your Vernon Hills permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Vernon Hills permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.