Villa Park, Illinois Building Permit Guide

To get a building permit in Villa Park, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Villa Park’s Permitting Division, part of Community & Economic Development at 11 W. Home Avenue, issues building permits inside the village and takes applications through its online Permit Portal, by email, over the counter or by mail.

Authority: Permitting DivisionFiling: Permit Portal, email or counterPhone: 630-433-4300
Authority
Permitting Division11 W. Home Avenue
Remodel fee
$1.00 per sq ftFinished space, $400 minimum
Same-day permits
Roof, water heater, furnaceSame-size windows too
Re-inspection
$75Each failed or not-ready inspection

Inside Villa Park, building permits come from the Permitting Division of the Community & Economic Development Department at 11 W. Home Avenue (630-433-4300; permits@invillapark.com; Monday to Friday, 7:30 a.m. to 4 p.m.), headed by Brandon Nolin, Community & Economic Development Director. Roofs, water heaters, furnaces and same-size windows are permitted the same day; other jobs typically take 10 to 15 business days. Fees in the division’s January 2026 table run $1.50 per square foot for new finished living space and $1.00 for a remodel, with minimums.

What requires a building permit in Villa Park?

The village’s rule is broad: a building permit is required for every new building and for changes, improvements and repairs to existing ones. The list below is not complete, and the division asks owners to call about anything similar.

Permit needed

  • New homes and buildings, additions, garages and carports
  • Decks, patios, gazebos, pergolas, sheds and dog runs
  • Fences, driveways, approaches, sidewalks and curbs
  • Parking lots, including restriping after sealcoating
  • Roofing, siding and windows
  • Drywall, insulation and removal of walls, floors, ceilings or roofs
  • Structural or bearing changes and changes to a building entry or exit
  • Electrical, plumbing and mechanical work, water heaters, generators and solar panels
  • Pools, hot tubs and spas; accessible ramps and lifts; business signs
  • Grade changes, sewer and water work and anything in the right-of-way

No permit

  • Painting, carpeting, tiling and other floor coverings, when that is the only work
  • Landscaping without irrigation or grade changes
  • Landscape retaining walls under 36 inches high
  • Doors replaced without a change in size or location
  • Appliances with no change in service or plumbing
  • Tree removal on private property; swing sets, playhouses and treehouses

Emergency repairs to water lines, sewers and furnaces may start outside business hours, but the permit must follow: by the next business day for a furnace or water heater and within 48 hours for a water service or sewer repair, and inspections are still required. Air conditioning is not treated as an emergency, though the division aims to approve it within 24 hours.

What Villa Park decides and what the state holds

The Village Board adopts the building codes. Ordinance 4346, in effect since January 1, 2024, adopted the 2021 International Building, Residential, Mechanical, Fuel Gas, Property Maintenance, Existing Building, Fire and Swimming Pool and Spa codes with local amendments, along with the 2014 Illinois Plumbing Code and the 2018 Illinois Accessibility Code. The two official lists differ on the electrical and energy editions: the Permitting Division page names a 2021 electrical code and the 2024 energy code, while the division’s January 2026 presentation names the 2020 National Electrical Code and the 2021 Illinois Energy Conservation Code, so ask which edition a plan reviewer will apply. Stormwater follows the DuPage County Countywide Stormwater and Flood Plain Ordinance with village amendments. The state licenses the plumbers and roofers the village requires on those jobs.

Short on time to read all of this?

Get a free quote →

Villa Park building department: who handles permitting

The Community & Economic Development Department covers building permits, planning and zoning, and property maintenance. Its Permitting Division reviews and issues most village permits and acts as a one-stop shop: when a project also needs Public Works and Engineering, the Fire Department or the Health Department to sign off, the division sends the plans and collects their approvals. Zoning staff check every building permit application against the zoning ordinance. Villa Park is wholly in DuPage County, and unincorporated land nearby is permitted by DuPage County Building and Zoning (630-407-6700), which handles unincorporated areas only.

Villa Park permit contacts
DetailInformation
OfficePermitting Division, Public Works / Community & Economic Development Building, 11 W. Home Avenue, Villa Park, IL 60181
Phone630-433-4300 (the 2020 application form prints 630-834-8505, fax 630-834-8509)
Emailpermits@invillapark.com
HoursMonday to Friday, 7:30 a.m. to 4 p.m.
Department headBrandon Nolin, Community & Economic Development Director
Mailing addressVillage Hall, 20 S. Ardmore Avenue, Villa Park, IL 60181 (630-834-8500)
After-hours code violations630-592-6134

Villa Park permit types

Every permit starts with a building permit application filled out completely and signed by the property owner, or accompanied by a contract the owner signed. The village posts separate application forms for residential new work, additions and alterations; air conditioners, furnaces and generators; flatwork; fences; sheds and greenhouses; garages; siding; windows and doors; decks and porches; pergolas and gazebos; pools and spas; fireplaces; and radon systems, plus non-residential, structural, electrical, plumbing, roofing, sign, demolition, fire protection, elevator, storage tank, miscellaneous and moving-container forms. Most permits need an accurate, to-scale plat of survey, a site plan, a description of the work and its value.

Residential permits

  • New homes. The checklist asks for the application and contractor sheet, a highway permit application, two plats of existing conditions and two showing the footprint and setbacks to scale, two sets of stamped and sealed architectural plans, two sets of engineering plans with the engineer’s cost estimate for public, stormwater and erosion-control work, a topographic survey, soil borings where needed, a DuPage County Stormwater Management permit application, the paid Salt Creek Sanitary District permit receipt, a water line service agreement and, for a lot that had a well or septic system, a DuPage County Health Department sign-off. A demolition first needs the demolition packet and a call to the Fire Department (630-833-5350).
  • Additions and remodels. Stamped plans are required for every addition and for structural changes, including removing or altering structural walls and adding bathrooms or plumbing fixtures. Separate checklists cover ground-level and second-story additions and garages.
  • Smaller jobs. Informational packets cover remodels, decks and patios, dog runs, driveways, electric service, fences, HVAC units, generators, radon systems, roofs, sheds, signs, solar and pools. ComEd requires new service heads no more than 25 feet above the ground with safe ladder access.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial checklists cover new construction, additions and interior remodels, and stamped plans are required for structural changes, interior build-outs, new structures and additions. Every business in Villa Park must also register and obtain a certificate of occupancy from Community & Economic Development ($100 per business), including when the owner, name, location or building owner changes; the certificate is in addition to county and state registrations.

What comes before the building permit

  • Zoning relief. A project that does not meet the zoning ordinance needs relief after a pre-application meeting with Community Development, Public Works and the Fire Department. The village’s pages describe the hearing body two ways: the zoning relief page names the Planning and Zoning Commission, meeting the second Thursday at 7:30 p.m. and taking about 90 days, and the Planning & Zoning page names the Zoning Board of Appeals, meeting the second Wednesday at 6 p.m. and taking 90 to 120 days. Either way, the application is due well ahead (30 days to six weeks), notice goes to owners within 250 feet 15 to 30 days before the hearing, a sign goes on the property, and the Village Board decides.
  • Subdivisions. A single-family lot under 1 acre can be split into two through administrative plat review, without a hearing, if no street is created and every ordinance is met.
  • Stormwater, sewer and right-of-way. Stormwater permits are priced by lot size, site plan review is at least $100, and right-of-way work needs $1 million in liability insurance naming the village and a $1,200 cash bond per street opening, refunded after the approved inspection.

Villa Park permit costs and fees

The Permitting Division presented the fee table below to the Village Board’s Committee of the Whole on January 12, 2026; the presentation does not cite the ordinance behind it. Building fees are charged per gross square foot with a minimum; most other permits are flat. The application form also makes the applicant responsible for DuPage County impact fees.

Rather talk it over?

Call 1-855-478-4290 →
Villa Park permit fees (Permitting presentation, January 12, 2026)
WorkFee
Residential new or addition, finished space$1.50 per gross sq ft ($600 minimum)
Residential new or addition, unfinished space$0.50 per gross sq ft ($200 minimum)
Residential alteration or remodel, finished space$1.00 per gross sq ft ($400 minimum)
Non-residential new or addition, finished / shell$2.50 ($1,000 minimum) / $1.00 ($300 minimum) per gross sq ft
Non-residential alteration or remodel$1.50 per gross sq ft ($700 minimum)
Deck or porch; fireplace; flatwork; structural$250 each
Garage; shed; fence$300; $150; $150
Pergola or gazebo$200
Pool or spa, above ground / in ground$300 / $500
Roof, pitched / flat / accessory building$150 / $500 / $25
Siding, house / accessory; window replacement$100 / $25; $100
Electrical, plumbing or mechanical (general)$250
Water heater; A/C condenser; furnace$100; $150; $150
Electrical service; water or sewer service line$200 each
Demolition: interior / accessory / principal$50 / $100 / $500
Fire sprinklers, alarms and equipment; radon system$250 each
Signs (each); storage tanks; elevator$250; $300; $500
Right-of-way permit; bond$100; $1,200 minimum
Site plan review$100 minimum or 10% of the stormwater permit fee
Re-inspection (failed or not ready)$75

Worked example from the square-foot rows: a 500-square-foot finished addition costs 500 × $1.50, or $750, while remodeling 300 square feet of finished space works out to $300 and so pays the $400 minimum. Temporary moving and storage containers need a permit but carry no fee. A permit is good for one year from issuance, and the division can extend a started project with extenuating circumstances.

Rather not deal with the building department?

Get a free quote →

Trade permits and who may pull them

Roofing and plumbing work, other than normal maintenance, must be done by Illinois state-licensed contractors: plumbers submit their state 055 license and a letter of intent with every application, and roofers their state roofing license, before the permit issues. The January 2026 presentation lists the other contractors who must register: fire alarm contractors (IDFPR license and NICET certification), fire sprinkler contractors (licensed with the State Fire Marshal) and radon mitigators (IEMA license, active systems only); it says other contractors are not required to register. The older application form, dated December 2020, still prints stricter rules, including a $75 yearly village registration for general contractors, an electrical license from an Illinois municipality with a $10,000 bond, a $10,000 bond from every contractor and insurance of $500,000 to $2,000,000 depending on the job, so confirm with the division which papers it wants for your trade. Right-of-way work always needs the insurance and cash bond described above. The division will not recommend contractors but can list those who have worked in the village during a requested period.

How to apply for a Villa Park building permit

1. Call or read the packet

Check the project’s informational packet or checklist, or call 630-433-4300, to confirm the permit and documents.

2. Clear zoning first

If the plan does not meet zoning, book the pre-application meeting and finish zoning relief before applying.

3. Complete the application

Fill in every field, list every contractor, and get the owner’s signature or a signed contract.

4. Submit

Use the Permit Portal, email permits@invillapark.com with the address and work in the subject line, drop off at 11 W. Home Avenue, or mail it.

5. Answer corrections

The division routes plans to other departments; respond to comments through the portal.

6. Pay and post

Pay by card, Google Pay or eCheck in the portal, then post the permit where it can be seen from the street or sidewalk.

Review, corrections and what causes delay

Roof, same-size window, water heater and furnace permits are issued at application. Other permits typically take 10 to 15 business days for the first review, depending on how complete the submittal is and how many permits are waiting; portal filings made after hours or on a weekend or holiday start the next business day. A permit issues only when every reviewing department has approved, contractor information is complete and fees are paid; applicants can check status by calling the department.

Inspections and certificates in Villa Park

Required inspections are listed on the permit placard. Call the Permitting Division at 630-433-4300 at least 24 hours ahead with the permit number; inspections are booked first come, first served. Common stages are footings and piers, concrete, asphalt and paver pre-pours, rough framing, electrical, plumbing, insulation and water and sewer. Make sure the work is finished first: each failed inspection, including one that is not ready when the inspector arrives, costs $75. Refundable bonds come back only after every final inspection is approved, and the village suggests holding the last payment to a contractor until the final passes.

Want this handled start to finish?

Get a free quote →

Construction is allowed Monday to Saturday from 7 a.m. to 7 p.m. and Sunday from 8 a.m. to 6 p.m. When a property is sold or its title is transferred, Villa Park requires an inflow and infiltration inspection, which checks for stormwater draining into the sanitary sewer, counts plumbing fixtures, notes the water service material and confirms all permits are closed. It costs $50, paid in advance, is valid for 30 days, and any violations must be fixed within 180 days.

Illinois building code in Villa Park

Villa Park enforces the 2021 International codes adopted by Ordinance 4346 with local amendments, in effect since January 1, 2024. FEMA’s Community Status Book lists the Village of Villa Park (community 170217, DuPage County) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Villa Park building permit FAQs

Do I need a permit to replace windows or siding in Villa Park?

Yes. Siding and windows are on the village’s permit list; a window replacement permit is $100 and same-size windows are issued the same day.

How much is a building permit for an addition?

$1.50 per gross square foot of finished space, with a $600 minimum, under the January 2026 fee table.

Can I get a roof permit the same day?

Yes. Roof, water heater, furnace and same-size window permits are issued at application; the roofer needs a state license.

Do I need a permit for a short retaining wall?

Not for a landscape retaining wall under 36 inches high.

What happens when I sell my house?

The village requires a $50 inflow and infiltration inspection before the sale or transfer; violations must be fixed within 180 days.

How do I schedule an inspection?

Call 630-433-4300 at least 24 hours ahead with the permit number; a failed or not-ready inspection costs $75.

How long is a permit good for?

One year from issuance; ask the division before it expires if a started job needs more time.

Villa Park permit search and official resources

Applicants track their own permits in the Permit Portal or by calling the Permitting Division. Other records, including past permit files, are requested under the Freedom of Information Act through the village’s electronic request system, linked from its FOIA page; Village Hall is at 20 S. Ardmore Avenue (630-834-8500).

Inspections are where schedules slip.

Get a free quote →

Simplify Villa Park permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Villa Park sooner?

Let Alliance prepare, file, and track your Villa Park permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Villa Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.