Skip to main content
Municipal GuideIllinoisVermilion County

Vermilion County, Illinois Building Permit Guide

No county building department appears on Vermilion County’s website. The county requires floodplain development permits and issues septic and well permits; Danville, Hoopeston and Westville run their own offices.

County building department: None on the county websiteFloodplain permits: Emergency Management AgencyLargest city: Danville
Floodplain permits
County EMA201 N. Vermilion St., Danville
Septic and wells
217-431-2662County Health Department
Danville
217-431-2321Building Safety
Highway Department
217-703-7870Oakwood

No county building, zoning or planning department appears on the Vermilion County website; the county’s permit roles found there are floodplain development and the Health Department’s septic and well permits. By the Census Bureau’s 2025 estimates the largest municipalities are Danville city (28138), Hoopeston city (4676), Westville village (3029) and Georgetown city (3006).

This guide covers the county’s floodplain, septic and well permits and the offices of Danville, Hoopeston and Westville. No official website was found for Georgetown, so contact the city directly. The county’s pages give two different phone numbers for the Emergency Management Agency, so confirm the number with the county.

What requires a permit in Vermilion County?

Vermilion County takes part in the National Flood Insurance Program and requires a Floodplain Development permit before ANY development in the floodplain. New and renovated private sewage disposal systems and new private wells need Health Department permits, and so do closed-loop geothermal wells.

Short on time to read all of this?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Who handles permitting in Vermilion County?

County and city permit offices
OfficeHandlesContact
Emergency Management AgencyFloodplain Development permit applications; 201 N. Vermilion St., Lower Level, Danville, IL 61832Confirm the phone with the county
Vermilion County Health DepartmentPrivate sewage disposal and private well permits; 200 S. College St. Suite A217-431-2662
Vermilion County Highway Department2732 Batestown Rd., Oakwood, IL 61858217-703-7870
Danville Building SafetyBuilding permits; 1155 East Voorhees Street, Danville, IL, 61832217-431-2321
Hoopeston City Administration301 West Main Street, Hoopeston; window hours Monday through Friday 8am to 3pm217-283-5833
Westville Village office201 N. State Street, Westville, IL 61883; Monday to Friday 7am to 4pmForms & Permits page

Not sure this scope needs a permit?

Get a free quote →

County health permits in Vermilion County

For a private sewage disposal system, owners must have the soil analyzed by a soil classifier; percolation tests are no longer accepted.

Building permits in Danville, Hoopeston and Westville

Danville

Building Safety accepts all building permit applications only through Danville’s CitizenServe Online Portal. Community development application fees can be paid by credit card over the phone at 217-431-2321, or applications mailed with a check to 1155 East Voorhees Street, ATTN: Building Safety. Danville issues Land Disturbance Permits in two classes: Class 1 for 1.0 acre or more and Class 2 for 2,000 sf up to 1.0 acre.

Hoopeston

A building permit application is posted on the city’s Forms and Applications page; the City Administration office is at 301 West Main Street.

Westville

Village forms and permits are filled in and submitted online on the Forms & Permits page.

Rather talk it over?

Call 1-855-478-4290 →

How to get a permit in Vermilion County

1. Floodplain check

Any development in the floodplain needs a Floodplain Development permit from the county EMA.

2. Septic and well

Get Health Department permits; for septic, owners must have the soil analyzed by a soil classifier.

3. Danville

File in the CitizenServe Online Portal.

4. Hoopeston

Use the application on the city’s Forms and Applications page.

5. Westville

Submit online on the Forms & Permits page.

A building permit carries a validity period set by the local building office; confirm the expiry on phased or delayed work before it passes. Permit validity in Illinois

Inspections in Vermilion County

In Danville, failing to schedule a required inspection can bring a $100 charge per offense.

Rather not deal with the Vermilion County building department?

Get a free quote →

Official Vermilion County permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Frequently asked questions

Does Vermilion County have a building department?

None appears on the county website. The county requires Floodplain Development permits and its Health Department issues septic and well permits.

How do I apply for a Danville building permit?

Only through Danville’s CitizenServe Online Portal.

Is a percolation test accepted for a septic permit?

No. Vermilion County requires a soil analysis by a soil classifier; percolation tests are no longer accepted.

Simplify Vermilion County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build
  • Confirm whether the county or a city or village has the parcel, and which office to file with
  • Line up the health, highway and floodplain approvals that come before the building permit
  • File with the right office and keep inspections on schedule

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Vermilion County sooner?

Let Alliance prepare, file, and track your Vermilion County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Vermilion County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.