In the Village of Grayslake, building permits come from the Building Department’s Construction Permits and Inspections office at Village Hall, 10 S. Seymour Avenue (847-223-8515), open Monday to Friday, 8 a.m. to 5 p.m. Submit at the counter or, for plans 11 by 17 inches or smaller, by e-mail to permits@villageofgrayslake.com. Fees come from Chapter 3.08 of the village code, updated every year: an alteration valued at $1,000 or less is $84.40, plus $16.37 for each additional $1,000. Grayslake does not register contractors, and its inspections are booked directly with the village’s inspection contractor, TPI.
What requires a building permit in Grayslake?
Grayslake’s rule of thumb is that almost every building or property change needs a permit from the Building Department, and the department asks owners to check with it before making any interior or exterior change.
Permit needed
- New buildings, additions, decks, sheds and fences
- Interior alterations, including bathroom, kitchen and basement remodeling
- Pools and hot tubs; patios, driveways, paving and re-paving
- Siding, roofing, brickwork and tuckpointing; window and door replacement
- Electrical and plumbing improvements, water heaters and HVAC
- Lawn irrigation systems, demolition, sewer and water repairs, signs
Exempt (one- and two-family homes)
- Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
- Prefabricated pools less than 24 inches deep
- Swings and other playground equipment
- Cord-and-plug temporary decorative lighting and minor electrical repairs such as replacing lamps
- Portable heating, cooling, cooking and drying appliances
- Stopping leaks, clearing stoppages, and removing and resetting a toilet without changing pipes or valves
The exempt list follows the building department’s handout on work exempt from permit for houses and townhomes; a separate non-residential list covers commercial buildings. If a concealed drain or supply pipe has to be replaced, that is new work and needs a permit. Construction may run from 7 a.m. to 7 p.m. on weekdays and 8:30 a.m. to 5 p.m. on Saturdays; Sunday and holiday work needs a special permit.
What Grayslake decides and what the state holds
Grayslake writes its own amendments to the codes it adopts, in Title 15 of the village code (and Title 8 for the fire code). The department’s General Construction Information handout, last revised in February 2022, lists the 2009 International Residential, Building, Fire and Mechanical Codes and the 2011 National Electrical Code, each with local amendments, plus village ordinances on construction and demolition debris recycling (Chapter 15.56), tree protection (Chapter 12.16) and exterior architecture (Chapter 15.48). The Illinois Plumbing Code, the state energy code and the Illinois Accessibility Code come from the state. Septic systems are permitted by the Lake County Health Department, and new sanitary sewer connections by the North Shore Water Reclamation District.
Grayslake building department: who handles permitting
The Building Department is split into two offices at Village Hall: Construction Permits and Inspections, which reviews plans and inspects all residential and non-residential construction in the village, and Planning and Zoning. All inspections are administered by the village’s third-party contractor, TPI. Unincorporated land around Grayslake is permitted by Lake County.
Short on time to read all of this?
Get a free quote →One neighborhood works differently. Under the annexation agreement that brought the Prairie Crossing subdivision into the village, Lake County performs plan review and inspections there. Projects in Prairie Crossing follow Grayslake zoning and the codes Lake County has adopted; you still file with the village, which sends the plans to the Lake County Building Department, issues the permit, and issues the certificate of occupancy or completion once the county’s inspections pass. County code questions go to 847-377-2600, and the village notes it cannot control the county’s review or inspection times.
| Detail | Information |
|---|---|
| Office | Building Department, Village Hall, 10 S. Seymour Avenue, Grayslake, IL 60030 |
| Phone and fax | 847-223-8515; fax 847-223-4821 |
| permits@villageofgrayslake.com (plans 11x17 or smaller) | |
| Hours | Monday to Friday, 8 a.m. to 5 p.m. |
| Inspections (TPI) | 630-443-1567 |
| Prairie Crossing (Lake County) | Lake County Building Department, 847-377-2600 |
Grayslake permit types
A single building permit application covers most miscellaneous work, including signs, fences, driveways, window replacement, re-roofing and re-siding. Electrical and plumbing work have their own applications, and there are separate forms for temporary uses (and temporary signs), backflow preventer certification, right-of-way work, street access and Watershed Development permits. Residential projects are submitted with three copies of every document; non-residential, apartment and condominium projects with four.
Residential permits
- Project handouts. The department publishes requirement sheets for decks, fences, sheds, detached garages, pools, generators, air conditioning, lawn sprinklers, roof-mounted solar, demolition, finished basements, bathrooms and general remodeling, and backyard hens.
- New homes and additions of 800 square feet or more need a site grading plan by an Illinois registered land surveyor or licensed civil engineer that complies with the Lake County Watershed Development Ordinance, a spot survey after the foundation is in (going further before the village approves it is at your own risk), and an as-built grading survey before final occupancy.
- Energy tests. New homes and additions file third-party blower door and duct leakage test reports before occupancy.
- Fixtures. All new plumbing fixtures and irrigation controllers must carry the EPA WaterSense label.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Non-residential projects can use the village’s Fast Track permitting process, which lays out the village’s codes, procedures, specifications and forms up front with the aim of completing non-residential permitting in 40 calendar days. The Fast Track diagram sets out the meetings and timing, and the submittal checklist and developer advance information checklist list the documents. The same resources page carries the village’s architectural facade ordinances (general and industrial) and its downtown architectural detail guide.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Sewer. A new sanitary sewer connection (not a same-size replacement) needs a permit and connection fees paid directly to the North Shore Water Reclamation District, 14770 William Koepsel Drive, Gurnee (847-623-6060); proof is required before the village issues its permit.
- Septic. A new onsite wastewater treatment system needs a Lake County Health Department permit (500 W. Winchester Road, Libertyville, 847-377-8020) before the village permit.
- Zoning. The combined Plan Commission / Zoning Board of Appeals meets on the second Monday of the month at 6 p.m. at Village Hall and reviews zoning issues, subdivision plats and subarea plans.
- Stormwater. Grading plans must meet the Lake County Watershed Development Ordinance, and the village has its own Watershed Development permit application.
Grayslake permit costs and fees
Grayslake’s permit fees are in Chapter 3.08 (Fee Schedule of Village Permits and Services) of the village code (the history note for Section 3.08.010 cites Ordinance 2025-0-24), and the village updates its posted Summary of Fees every year; the figures below are from the January 2026 edition. Fees are worked out during plan review and must be paid before the permit is issued. For remodeling, the value is the contract price (file a copy of the contract with the application) or, without a contract, the department’s estimate.
| Item | 2026 fee |
|---|---|
| Foundation (all buildings) | $0.93 per sq ft of building footprint |
| New one- or two-family home: administrative / plan review | $892.42 per lot ($1,339.34 to $1,477.40 where significant trees exist) |
| Residential addition: administrative / plan review | $269.36 |
| Residential usable floor space / basements | $1.75 / $0.93 per sq ft |
| Commercial new building: administrative / plan review | $892.42 or 0.1% of cost, whichever is greater |
| Commercial alterations and additions under 2,500 sq ft: plan review | $214.64 |
| Office and retail / factory and warehouse space | $0.51 / $0.40 per sq ft |
| Accessory building of 80 sq ft or more | $0.41 per sq ft ($63.34 minimum) |
| Remodeling and other work not listed | $84.40 up to $1,000 of value, plus $16.37 per additional $1,000 |
| Reroofing / residing | $110.45 each |
| Fence | $62.06 |
| Deck, balcony or porch | $0.58 per sq ft ($60.85 minimum) |
| Driveway / sidewalk, patio or slab paving | $192.65 / $50.24 |
| Pool: above-ground / in-ground / commercial | $71.17 / $110.45 / $303.45 |
| Demolition | $101.20 |
| Certificate of occupancy: new single-family / addition or alteration | $458.45 / $74.87 |
| Plumbing: alterations and repairs (minimum) / per fixture / water heater | $110.45 / $38.43 / $38.43 |
| Electrical: 100–200 amp service / minimum permit | $137.78 / $106.18 |
| Lawn sprinkler system | $70.81 |
Rather talk it over?
Call 1-855-478-4290 →Worked example. A kitchen remodel with a $10,000 contract: $84.40 for the first $1,000, plus 9 × $16.37 = $147.33 for the remaining $9,000, for a building permit fee of $231.73. Electrical and plumbing work on the same job are charged on their own schedules.
Related charges
- Re-inspections after a correction notice or when work is not ready: $50 the first time, $75 the second and $100 for each one after, paid before the next inspection.
- Work started without a permit: an extra administrative fee of 50% of the permit fees, up to $750, and a stop-work order if work continues after a written warning.
- Cancelled permits: 50% of the building permit and plan review fees if already paid; otherwise the plan review fee.
- Outside plan review: when the department uses a consultant, a plan review escrow of at least $500 is set up at submittal, with any balance refunded.
- Water: a basic connection charge of $600 for a 1-inch service, and $298.40 for residential construction water.
Trade permits and who may pull them
Grayslake does not require contractor registration, so there is no village license to buy before filing. Electrical and plumbing permits use their own applications and fee schedules. Electrical permits are priced by the service and by each opening, fixture, motor horsepower and ton of air conditioning, with a $320.96 inspection fee on new construction and $110.45 on alterations and a $106.18 minimum. Plumbing permits carry a $320.96 basic inspection fee for new construction or $110.45 for alterations, plus $38.43 per fixture up to 50 fixtures.
Rather not deal with the building department?
Get a free quote →- Homeowner plumbing. An owner may install plumbing only in a home or accessory building that he or she owns and occupies, or will occupy, by signing the plumbing-by-homeowner waiver; the work must meet the Illinois Plumbing Code, and anyone else doing it faces a fine under the state plumbing license law. If the work is beyond the owner, a plumber licensed and bonded with the Illinois Department of Public Health must finish it.
- Homeowner electrical. An owner may wire a home or accessory building he or she owns and occupies, without paying anyone for the labor, after filing plans and showing the electrical inspector enough knowledge of the code. These permits last six months from issue or the last inspection, and nothing may be energized until final approval.
- Fire protection sprinkler and alarm systems are charged by area ($49.25 per 1,500 square feet, $100.91 minimum).
How to apply for a Grayslake building permit
Confirm the property is in the village, and whether it is in Prairie Crossing, where Lake County reviews and inspects.
Use the project’s requirement sheet and the general submittal requirements for new buildings, alterations or miscellaneous projects.
Get NSWRD sewer or Lake County Health Department septic permits first where they apply, plus any zoning relief.
File the application and three copies of residential plans (four for commercial) at Village Hall, or e-mail plans 11x17 or smaller.
The department reviews against its customer service standards for that permit type and calculates the fee.
Pay the fee before the permit is issued, then keep the site secured and clean as the handout requires.
Contact TPI by 4 p.m. for a next-business-day inspection.
Review, corrections and what causes delay
Grayslake sets customer service standards for review time by permit type, measured from a complete and accurate application, so missing copies, a missing contract or an incomplete grading plan pushes the date back. Projects in Prairie Crossing run on the Lake County Building Department’s schedule, which the village cannot control. Outside plan review, when the department uses a consultant, needs the escrow deposit before review starts, and a new sewer connection or septic system cannot be permitted until the NSWRD or county health permit is shown.
Inspections and certificates in Grayslake
All inspections are administered by TPI, the village’s third-party contractor. Request them by phone at 630-443-1567 or by e-mail to tpi1@tpibcc.com; a request made by 4 p.m. can be scheduled for the next business day. Prairie Crossing projects are inspected by the Lake County Building Department instead (847-377-2600).
Want this handled start to finish?
Get a free quote →- Foundations: file a spot survey by an Illinois registered land surveyor showing property lines, the foundation’s dimensions and setbacks and the top-of-foundation elevation before building further.
- Re-inspections: $50, then $75, then $100 when work is not ready or a correction notice is issued.
- Before occupancy: as-built grading surveys for new homes and additions of 800 square feet or more, blower door and duct leakage reports for new homes and additions, and proof of construction and demolition debris recycling where Chapter 15.56 applies (new or renovated space of 2,000 square feet or more, any demolition, or projects of four or more units).
- Certificates: a single-family certificate of occupancy is $458.45 and an addition or alteration certificate $74.87.
Illinois building code in Grayslake
Grayslake enforces the codes listed in its General Construction Information handout with the local amendments in Titles 15 and 8 of the village code. FEMA’s Community Status Book lists the Village of Grayslake (community 170363) as participating in the National Flood Insurance Program, with a current flood map dated October 5, 2023; the village is not in the Community Rating System.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Grayslake building permit FAQs
How much does a building permit cost in Grayslake?
It depends on the work: remodeling is $84.40 for the first $1,000 of value plus $16.37 per additional $1,000, a fence is $62.06, and a reroof or residing job is $110.45.
Does Grayslake require contractors to register?
No. The village says it does not require contractor registration.
Do I need a permit to replace windows or a roof?
Yes. Window and door replacement, re-roofing and re-siding all use the village’s building permit application.
Who inspects my project?
TPI, the village’s inspection contractor (630-443-1567), except in Prairie Crossing, where the Lake County Building Department inspects.
Can I do my own plumbing or electrical work?
Yes, in a home you own and live in, by signing the village’s homeowner plumbing or electrical waiver and following its conditions.
Can I e-mail my application?
Yes, to permits@villageofgrayslake.com if the plans are 11 by 17 inches or smaller; larger sets go to Village Hall.
Grayslake permit search and official resources
For the status of a permit, call the Building Department at 847-223-8515. Copies of permits, plans and other village records are requested in writing from the Freedom of Information Office at Village Hall; the village encourages its request form (online or at Village Hall) but reviews written requests in any form, and copying and postage are charged where they apply.
Inspections are where schedules slip.
Get a free quote →- Building/Zoning
- Construction Permits & Inspections Office
- Applications and forms
- Permitting resources and handouts
- Building FAQs
- General Construction Information handout
- Work exempt from permit (residential)
- 2026 fee schedule (Chapter 3.08)
- Plumbing by homeowner waiver
- Electrical work by homeowner form
- Plan Commission / Zoning Board of Appeals
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
- Illinois Capital Development Board
- Illinois Department of Public Health – Plumbing
Simplify Grayslake permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Grayslake sooner?
Let Alliance prepare, file, and track your Grayslake permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Highland Park
Read guide →Lake Forest
Read guide →Grundy County Building Permit Guide
Read guide →Hancock County Building Permit Guide
Read guide →Hanover Park Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Grayslake permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.