To get a building permit in Godfrey, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Village of Godfrey’s own Building and Zoning Department issues building, electrical and plumbing permits and inspects work in the village; applications are filed through Cloudpermit or at Village Hall, 6810 Godfrey Road.

Authority: Village of Godfrey Building and ZoningFiling: Cloudpermit or Village HallPhone: 618-466-1206
Permit office
Building and ZoningVillage Hall, 6810 Godfrey Road
House permit base
$50Projects up to $4,999
Trade inspections
$50 eachResidential electric and plumbing
Inspection notice
24 hoursNo same-day inspections

In the Village of Godfrey, building permits are issued by the village’s Building and Zoning Department at Village Hall, 6810 Godfrey Road (618-466-1206), which also reviews the plans and makes the inspections. Applications go through the village’s Cloudpermit portal or the office, and fees follow Resolution 2024-15: a house project costing up to $4,999 pays a $50 building permit fee, and each residential electric or plumbing inspection costs $50.

What requires a building permit in Godfrey?

Building and Zoning issues permits for new homes and commercial buildings, additions, alterations, plumbing, roofing, pools, decks, fences, electrical work and signs. The village’s FAQ adds detached garages and pole barns and certain interior remodeling projects, and lists these jobs as needing a permit: a new roof, an electrical upgrade, a fence, a pool and any accessory building over 200 square feet. The fee resolution also prices permits for retaining walls, solar systems, standby generators, mobile homes, demolition and moving a building.

Permit needed

  • New homes, additions and alterations
  • Detached garages and pole barns
  • Accessory buildings over 200 sq ft
  • Roofs, fences and retaining walls
  • Decks, porches and pools
  • Electrical upgrades, generators and solar
  • Plumbing work and signs
  • Demolition and building relocation

Ask the office

  • Accessory buildings of 200 sq ft or less
  • Interior remodeling (only “certain” projects need a permit)

Starting construction before the permit is issued is charged $250 under the fee resolution, on top of the permit itself.

What Godfrey decides and what the state holds

The village adopts its own codes, and its Board of Trustees sets permit fees by resolution. Godfrey enforces the 2018 International Building Code, which can be inspected at the Building and Zoning office or the Village Clerk’s office, and the 2017 National Electrical Code as amended by Ordinance 36-2023. Plumbing follows the Illinois Plumbing Code and must be done by a plumber licensed through the Illinois Department of Public Health; sanitary sewer permits come from Illinois American Water, not the village.

Godfrey building department: who handles permitting

Godfrey is an incorporated village with its own Building and Zoning Department, led by Building and Zoning Administrator Tony Cain. The department reviews every set of plans tied to a permit, issues the permits, makes the inspections (footings, foundations, framing, electrical, plumbing, signs, fire damage and demolition), verifies zoning classifications, processes rezoning and variance requests and issues ordinance violations for weeds, junk, derelict vehicles and property maintenance.

Unincorporated land around the village is outside Godfrey’s reach and is permitted by Madison County Building & Zoning, which also handles private sewage systems (see our Madison County guide); the neighboring City of Alton runs its own building department.

Short on time to read all of this?

Get a free quote →
Godfrey permit contacts
DetailInformation
OfficeBuilding and Zoning, Godfrey Village Hall, 6810 Godfrey Road, Godfrey, IL 62035 (mail: P.O. Box 5067)
PhoneBuilding and Zoning 618-466-1206; Village Hall 618-466-3324
Emailbuildingzoning@godfreyil.org
HoursMonday to Friday, 7:30 a.m. to noon and 1 p.m. to 4:30 p.m.
Online filingCloudpermit (village Building and Zoning portal)
Sanitary sewerIllinois American Water

Godfrey permit types

Permits can be applied for online in Cloudpermit, where the applicant creates a project, names the owner and invites any contractor or electrician, uploads the required documents and signs off the application, or picked up and filed at the Building and Zoning office.

Residential permits

  • New homes. $50 plus the value-based building permit fee, plus inspections; every new home needs at least four electric and four plumbing inspections at $50 each.
  • Additions, garages and accessory buildings. $50 plus the building permit fee plus inspections.
  • Decks, porches and retaining walls. $35 plus the building permit fee, with an electric inspection fee where wiring is involved.
  • Pools. Above-ground pools are $35 with at least two electric inspections; in-ground pools $50 plus the building permit fee and at least two electric inspections.
  • Solar and generators. Solar is $150 plus the building permit fee; a generator is a flat $100.
  • Flat-fee permits. Fences $35, roofs $50, garage or accessory demolition $50, house demolition $100 and relocation $50.
  • Mobile homes. $50 plus the building permit fee, with at least three electric and three plumbing inspections.

Commercial permits

Commercial work, including new buildings, additions and accessory structures, pays a permit fee set by bands of project cost, with electrical, plumbing and occupancy fees added on. New commercial buildings need at least four electric and four plumbing inspections at $100 each. Flat commercial permits cover fences ($50), each sign ($50), demolition ($100), roofs ($100), occupancy ($100) and generators ($150). The village engineer posts a development plan and site review checklist.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Call Building and Zoning to look up a parcel on the zoning map; variance and rezoning applications are picked up at the office, where staff explain the process; the village has a Planning and Zoning Commission.
  • Subdivision. Minor subdivisions use the village’s minor final subdivision plat application under its subdivision regulations.
  • Sewer or septic. Sanitary sewer connections are permitted by Illinois American Water; where sewer is not available, the village writes a cover letter to Madison County for a septic or Norweco system.
  • Floodplain. The village takes part in the National Flood Insurance Program and posts stormwater best-management guidance for residents.

Godfrey permit costs and fees

Fees come from Resolution 2024-15, Resolution Adopting Revised Fees for Building Permits, which the Board of Trustees approved on September 3, 2024 under the building code adopted by Ordinance 64-2000. For homes the building permit fee (BPF) is based on the total cost of the project; the resolution notes that all fees can change depending on the plans submitted.

Godfrey residential fees (Resolution 2024-15)
ItemFee
Building permit fee (BPF), project up to $4,999$50
BPF, project $5,000 and over$50 plus $4 per $1,000
New home / addition / accessory building$50 + BPF + inspections
Deck or porch / retaining wall$35 + BPF
Above-ground / in-ground pool$35 / $50 + BPF
Solar$150 + BPF
Fence / roof / occupancy$35 / $50 / $45
Generator$100
Demolition: garage or accessory / house$50 / $100
Electric or plumbing inspection (each, incl. re-inspections)$50
Missed or no-show inspectionUp to $100 plus the $50 re-inspection fee
Cancelled without 24 hours’ notice$50
Work started before a permit$250

Rather talk it over?

Call 1-855-478-4290 →
Godfrey commercial permit fees by project cost (Resolution 2024-15)
Cost of projectPermit fee
Up to $50,000$250
$50,001 to $100,000$500
$100,001 to $200,000$850
$200,001 to $300,000$1,200
$300,001 to $400,000$1,550
$400,001 to $500,000$1,900
Over $500,000$2,000 plus $1 per $1,000

Worked examples from the resolution: a $4,000 deck pays the $35 deck fee plus a $50 building permit fee, or $85, plus $50 for each electric inspection if it has wiring. A new commercial building costing $150,000 pays an $850 permit fee plus at least eight electric and plumbing inspections at $100 each ($800), before the $100 occupancy permit. Commercial inspections cost $100 each, including re-inspections; a missed commercial appointment adds up to $100 more, and a cancellation without 24 hours’ notice costs $100.

Trade permits and who may pull them

Electrical and plumbing work is permitted and inspected by the village itself, and the number of inspections drives much of the cost: $50 each for homes and $100 each for commercial work, counting every re-inspection and consultation.

  • Electrical contractors: anyone in business as an electrical contractor in Godfrey must register with the village under Ordinance 36-2023. A contractor already registered or licensed by another Illinois municipality that uses the National Electrical Code the village has adopted does not have to sit the village exam.
  • Electrical rules: the village’s 2017 NEC handout sets a 100-amp minimum service, three spare panel spaces and no half-size breakers on new construction, 12 AWG minimum for power wiring, copper ground wire in conduit, and hard-wired, interconnected smoke and carbon monoxide alarms with battery backup.
  • Plumbing: done by a plumber licensed through the Illinois Department of Public Health; new homes need at least four plumbing inspections.
  • Roofing: residential roof permits are $50 and commercial ones $100.

The handout adds detail electricians are checked against: every new service, upgrade or panel change needs ground blocks; aluminum conductors are allowed in dwellings at 4 AWG or larger; nonmetallic-sheathed cable is allowed only in residential dwellings; smoke alarms go in every bedroom, in hallways within 15 feet of bedroom doors and on each level, with carbon monoxide alarms within 15 feet of bedroom doors; and arc-fault protection covers the 120-volt, 15- and 20-amp circuits in kitchens, living and family rooms, bedrooms, hallways, closets, laundry areas and similar rooms. The village’s pages describe no general contractor license; the registration rule they publish is the one for electrical contractors.

Rather not deal with the building department?

Get a free quote →

How to apply for a Godfrey building permit

1. Confirm the address

Make sure the property is inside the village; unincorporated parcels go to Madison County.

2. Check zoning

Call 618-466-1206 for the parcel’s zoning and setbacks, and pick up a variance or rezoning application if needed.

3. Start the application

Create a Cloudpermit login, open a building permit application with the category, work type and address, or file at the office.

4. Add parties and documents

Name the owner, invite the contractor or electrician, attach plans and sign off the application.

5. Pay the invoice

Building and Zoning reviews the application and confirms the invoice, which is paid in Cloudpermit before the permit issues.

6. Request inspections

Ask for each inspection at least 24 hours ahead; the office confirms the exact time.

Review, corrections and what causes delay

The village does not publish a review deadline; Building and Zoning reviews every plan tied to a permit before it issues. The resolution states that all fees are subject to change depending on the plans submitted. Occupancy permits are handled differently: the application is on the village website, it must carry complete buyer and seller information or it is refused, the village suggests the real estate agent fill it in, and the fee cannot be paid by phone or online.

Inspections and certificates in Godfrey

Every inspection needs 24 hours’ notice and the village does not inspect on the same day. In Cloudpermit the applicant requests a date and a morning or afternoon slot, and Building and Zoning confirms the exact time. Inspections cover footings, foundations, framing, electrical, plumbing, signs, fire damage and demolition, and new homes get at least four electrical and four plumbing visits. For electrical inspections the panel cover must be off and the panel labeled, and a failed electrical inspection needs an additional permit and fee.

A missed or no-show appointment costs up to $100 plus the re-inspection fee, and cancelling without 24 hours’ notice costs $50 for homes or $100 for commercial work. When every inspection on a Cloudpermit project has passed, the village marks the project finished. An occupancy permit ($45 residential, $100 commercial) is required every time a property changes owner, and the village posts an occupancy inspection checklist.

Want this handled start to finish?

Get a free quote →

Illinois building code in Godfrey

Godfrey enforces the 2018 International Building Code adopted under its building code ordinance and the 2017 National Electrical Code as amended by Ordinance 36-2023; its zoning ordinance and subdivision regulations are published online. FEMA’s Community Status Book lists the Village of Godfrey (community 171031) as participating in the National Flood Insurance Program, with a current flood map dated April 15, 1982, regular-program entry on June 18, 1993, and no Community Rating System class.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Godfrey building permit FAQs

Does Godfrey issue its own building permits?

Yes. The village’s Building and Zoning Department reviews plans, issues permits and inspects; Madison County handles only unincorporated land.

How much is a building permit for a house project?

$50 for a project costing up to $4,999 and $50 plus $4 per $1,000 above that, plus the fee for the permit type and $50 per electric or plumbing inspection.

Do I need a permit for a shed?

The village lists a permit for any accessory building over 200 square feet; ask Building and Zoning about smaller ones.

Can I get a same-day inspection?

No. Godfrey needs 24 hours’ notice for every inspection and does not inspect on the same day.

Does an electrician need to register with Godfrey?

Yes. Electrical contractors register with the village; those registered or licensed by another Illinois municipality on the adopted NEC skip the exam.

Who issues sewer and septic permits?

Illinois American Water handles sanitary sewer permits; where sewer is not available, the village provides a cover letter to Madison County for a septic or Norweco system.

What does a commercial permit cost in Godfrey?

It depends on project cost: $250 up to $50,000, rising in bands to $1,900 at $500,000, then $2,000 plus $1 per $1,000, plus $100 for each electric or plumbing inspection.

Do I need an occupancy permit when I buy a house?

Yes. An occupancy permit is required whenever a property changes owner; it costs $45 for a home and cannot be paid online or by phone.

Godfrey permit records and official resources

Building and Zoning keeps permit, inspection and occupancy files for village addresses; call 618-466-1206 about a permit’s status, or use the Cloudpermit project page for applications filed online; the village’s step-by-step Cloudpermit instructions were last updated on February 24, 2025. Other records can be requested under the Illinois Freedom of Information Act on the village’s FOIA request form.

Inspections are where schedules slip.

Get a free quote →

Simplify Godfrey permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Godfrey sooner?

Let Alliance prepare, file, and track your Godfrey permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Godfrey permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.