In Calumet City, permits come from the Department of Building and Zoning (also called the Department of Inspectional Services) at 670 Wentworth, Calumet City ((708) 891-8120), led by Building & Zoning Director Sheryl Tillman. The city requires a permit for all work, issues one permit covering every trade on a job, and charges about 1.5% of the job cost with a $50 minimum and a $25 inspection fee. New homes, additions, garages, solar and commercial projects may first go to the city’s outside plan reviewers, B&F Construction or the Farnsworth Group, who bill their own fee.
What requires a building permit in Calumet City?
The city’s permit instructions open with a simple rule: a permit is required for all work done in Calumet City, residential and commercial. The only jobs the commercial instructions excuse are flooring and painting, and the building permit form likewise exempts painting and floor sanding from the list of trades that must file.
Permit required
- New buildings, additions, porch enclosures and private garages
- Rehabs, remodels and repairs, including repairs ordered after a city inspection
- Porches, patios, concrete or asphalt driveways, sidewalks and fences
- Electrical, plumbing, heating and air conditioning work
- Solar panels, cell towers and civil work
- Signs, balloons, banners and tents
- Any construction, repair, fill or regrading in the floodplain, including fences and pools
No permit
- Painting
- Flooring and floor sanding
When repairs come out of a city inspection, such as a point-of-sale or rental inspection, every trade permit needed for them must be applied for at the same time. Garages, porches, patios, driveways, sidewalks and fences need a plat of survey with the application and the signed contract.
What Calumet City decides and what the state holds
The city chooses its codes, which include the Chicago Electrical Code with local amendments, sets its own fees, registers contractors, inspects homes at sale and rentals every year, and runs zoning through its Zoning Board of Appeals. Plumbing follows the Illinois Plumbing Code with city amendments and must be done by a state-licensed plumber unless the owner does it under the city’s homeowner rules, and roofers need their roofing license. Flood rules come from city, state and federal law together.
Calumet City building department: who handles permitting
The Department of Building and Zoning issues every building and trade permit for property in the city. It began in 1996 as the Department of Inspectional Services, created to bring building, housing and fire prevention inspections under one roof, and it still handles new construction, remodeling, rental inspections, property complaints, floodplain questions, zoning and contractor certification. Land in unincorporated Cook County is permitted by the county’s Department of Building and Zoning, not by the city.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Department of Building and Zoning, 670 Wentworth, Calumet City, IL 60409 (listed as Wentworth Road on the department page and Wentworth Avenue on its forms) |
| Phone / fax | (708) 891-8120 / (708) 891-2128 |
| dis@calumetcity.org | |
| Hours | Monday to Friday, 8 a.m. to 4 p.m., excluding holidays |
| Director | Sheryl Tillman, Building & Zoning Director |
| Outside plan review | B&F Construction (single-family structural); Farnsworth Group (civil and commercial) |
Calumet City permit types
Application forms are posted on the city website for printing only; completed forms go to Building and Zoning in person or by mail. The city issues one permit for an entire job rather than separate trade permits, but each trade still completes its own application: building, electrical, plumbing, HVAC, fence and sign. Permits are picked up in person, and the city notifies the general contractor when the permit is ready and what it costs.
Residential permits
- New homes need plans signed and sealed by an Illinois-licensed architect showing the foundation, floor plan, a wall section from footing to roof and the site plan; a second set goes to the City Engineer, and single-family structural plans go to B&F Construction for review.
- Private garages need a grade setting from the city engineer and a plat of survey locating the garage.
- Additions and porch enclosures need plans or sketches with the same information as a new building.
- Fences need a staked plat of survey, may not extend past the front-yard building line, may not be built on an easement or back-to-back with another fence, must have a gate or opening, and in a flood zone may not block the flow of water. Removing a neighbor’s fence takes the neighbor’s signed letter.
- Air conditioners are charged $10 per ton, and condensers go in the back yard under city ordinance.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial jobs submit one set of plans and permit applications for every trade, general contractor and subcontractor alike, with flooring and painting the only exceptions. Civil and commercial plans go to the Farnsworth Group for review; once Farnsworth releases them, the department needs three to five days to process the permit, and Farnsworth’s review is billed on a separate invoice. The building permit form also states that rental and commercial properties require trade contractors.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Contractor registration. Every contractor and subcontractor registers with the city before any permit is pulled.
- Zoning Board of Appeals. Variances, special uses and zoning amendments start with the ZBA application, which needs a plat of survey, legal description, site plan, drawings for any raised structure such as a garage or roofed porch, a zoning analysis showing what does not comply, and proof of ownership (a tax bill is not accepted). A disclosure statement of everyone with an interest is filed with the City Clerk under section 13.1 of the city code.
- Floodplain. New homes in the Little Calumet River floodplain must be elevated 1 foot above the base flood level, and a substantial improvement, work worth more than 50% of the building’s value, must meet the same standard.
- Stormwater. Calumet City is not one of the municipalities MWRD authorizes to issue its watershed permits, so larger sites that trigger the Watershed Management Ordinance apply to MWRD.
Calumet City permit costs and fees
The department’s permit-process sheet, updated in April 2026, gives the basic formula: every permit has a $50 minimum fee and a $25 inspection fee, and the permit fee is based on 1.5% of the job cost. Third-party plan review is billed separately by the reviewer.
| Item | Fee |
|---|---|
| Permit fee | 1.5% of the job cost; $50 minimum |
| Inspection fee | $25 |
| Air conditioning | $10 per ton |
| Third-party plan review (B&F or Farnsworth) | Separate invoice from the reviewer |
| Contractor registration | $250 for July 27 to December 31, 2026 |
| Point-of-sale inspection, single-family | $150, including one re-inspection |
| Point-of-sale inspection, multi-family | $25 for each additional unit |
| Point-of-sale inspection, commercial or industrial | $0.20 per sq ft, $150 minimum |
| Extra follow-up inspection | $50 per unit |
| No-show or cancellation inside 24 hours | $50 per inspector |
Rather talk it over?
Call 1-855-478-4290 →As a worked example from the sheet, a $10,000 garage carries a permit fee of 1.5% of $10,000, or $150, plus the $25 inspection fee, before any outside plan review charge. A $2,000 job would hit the $50 minimum, since 1.5% of it is only $30. Point-of-sale inspections remain valid for no more than 180 days.
Owner-occupants can recover part of the cost of flood-proofing work. The city’s overhead sewer rebate program, under section 14.2 of the city code, pays half the qualifying cost up to $4,000 for an overhead sewer, sump pump or related sewer and waterproofing work. The homeowner applies with two written contractor estimates, the city plumbing inspector visits before any work, and only then is the permit issued; work done before approval is not reimbursed, and payment follows the passed final inspection and paid receipts, usually four to six weeks later.
Trade permits and who may pull them
All contractors register with the city before pulling a permit. The 2026 form covers general, HVAC, electrical, plumbing and roofing contractors and asks for a copy of a current business license from another city or town, liability insurance naming the City of Calumet City and a $10,000 surety bond, except for plumbers.
- Electricians supply a copy of the current company license; the form lists the municipalities it recognizes as giving a written test on the Chicago or National Electrical Code, starting with the City of Chicago. Electrical work follows the 2018 Chicago Electrical Code.
- Plumbers must apply in person with the 058 or journeyman photo license and a letter of intent for each permit, and the plumbing form requires a double-check backflow preventer on the water service and hose connections and an expansion tank on the water heater.
- HVAC contractors supply a current EPA license; the HVAC form sets rules for combustion air, smoke and carbon monoxide detectors, attic platforms, furnace shut-offs and duct insulation of R6 on returns and R8 on supplies in unconditioned space.
- Roofers supply their roofing license.
Homeowners may take out permits with a current ID showing the permit address. A homeowner plumbing permit requires six months’ residence after it is issued, and a home where the owner did the plumbing cannot be sold for six months after the work is finished.
Rather not deal with the Calumet City building department?
Get a free quote →How to apply for a Calumet City building permit
Every contractor and subcontractor files the city registration form, insurance and bond.
Fill in the building form and each trade form, with the signed contract.
Where required, send one set to B&F Construction or the Farnsworth Group and one to Building and Zoning.
A plat of survey for outside work, sealed architect plans for new buildings, a second set for the City Engineer.
Deliver everything to 670 Wentworth between 8 a.m. and 4 p.m. on weekdays.
Collect the permit in person once notified and display the card during construction.
Review, corrections and what causes delay
Permits are not issued separately, so every application for the job must be complete before the permit is released. On reviewed projects the clock starts after the outside reviewer releases the plans, with three to five days of city processing after that. Unregistered subcontractors, a missing signed contract or survey, and contractor changes not reported in writing will hold up issuance. Work under a start permit must begin within 30 days and finish within six or twelve months, depending on the permit.
Inspections in Calumet City
Once the permit card is in hand and the work is done, contact the office or come in to schedule a rough or final inspection. For foundations, the Building Commissioner must be told when footing or wall forms are ready, with 24 hours’ notice each time concrete is to be poured. No new building or part of one may be used until an occupancy permit is issued.
Calumet City also inspects existing property. A point-of-sale inspection is required when a property is sold or transferred, and the report, issued to the seller’s representative at the end of the inspection, may call for permits. Rental properties get an annual code compliance inspection, and businesses such as salons and food service establishments follow published inspection guidelines.
Illinois building code in Calumet City
The city lists the 2021 International Building, Residential, Mechanical, Fire and Property Maintenance codes, the 2018 Chicago Electrical Code and the 2016 Illinois Plumbing Code, both with local amendments, the 2018 energy code and the 2018 Illinois Accessibility Code. FEMA’s Community Status Book lists the City of Calumet City (community 170072) as participating in the National Flood Insurance Program, with its flood map effective August 19, 2008, and in the Community Rating System at class 5, a 25% flood insurance discount.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Calumet City permit search and official resources
The city says information about property inspections, permits, violations and citations is available directly from the Department of Building and Zoning at 670 Wentworth Avenue or (708) 891-8120, without a formal Freedom of Information request. Flood Insurance Rate Maps and elevation certificates can be reviewed at the department and at the Calumet City Public Library.
- Department of Building and Zoning
- Residential and commercial permit process
- 2026 building permit application
- 2026 contractor registration form
- Electrical permit application
- Plumbing permit application
- HVAC permit application
- Fence permit application
- Zoning Board of Appeals application
- Purchasing or selling property process
- Flood prevention and floodplain rules
- Overhead sewer rebate program
- Documents that need no FOIA request
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Calumet City building permit FAQs
Do I need a permit for small jobs in Calumet City?
Almost always. The city requires a permit for all work; only painting and flooring or floor sanding are excused.
How much does a permit cost?
About 1.5% of the job cost, with a $50 minimum and a $25 inspection fee; a $10,000 job comes to $150 plus $25, before any outside plan review.
Can a homeowner pull a permit?
Yes, with a current ID matching the address; rental and commercial properties require trade contractors.
Can I do my own plumbing?
Only in a home you live in for six months after the permit, and the house cannot be sold for six months after the work is done.
Who reviews my plans?
Building and Zoning, plus B&F Construction for single-family structural plans or the Farnsworth Group for civil and commercial plans.
Do I need an inspection to sell my house?
Yes. A point-of-sale inspection costs $150 for a single-family home and is valid for up to 180 days.
How high must a new house in the floodplain be built?
New residential buildings in the floodplain must be elevated 1 foot above the base flood level.
Simplify Calumet City permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Calumet City sooner?
Let Alliance prepare, file, and track your Calumet City permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Chicago
Read guide →Chicago Heights
Read guide →Canton Building Permit Guide
Read guide →Carbondale Building Permit Guide
Read guide →Carpentersville Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Calumet City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.