Skip to main content
Municipal GuideIllinoisBurr Ridge · DuPage County

Burr Ridge, Illinois Building Permit Guide

To get a building permit in Burr Ridge, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Burr Ridge’s Community Development Department issues building permits inside the village and accepts applications only through its online portal; outside consultants do the plan reviews and inspections.

Authority: Community Development DepartmentFiling: Online portal onlyPhone: 630-654-8181 x6170
Authority
Community Development451 Commerce Street, Burr Ridge
House permits
$2.00 per sq ftBase fee for new homes, additions, alterations
First review
15 business days10 business days for resubmittals
Inspections
8 a.m. to noonRequest by 3 p.m. for next day

Inside Burr Ridge, building permits come from the Community Development Department, whose Director, Janine Farrell, serves as Building Commissioner and Zoning Administrator (Village Hall, 451 Commerce Street; 630-654-8181, permit questions x6170; permits@burr-ridge.gov). Every application must be filed in the village’s online portal; paper applications are no longer accepted. The base permit fee for new homes, additions and alterations is $2.00 per square foot plus a plan review deposit, first reviews take up to 15 business days, and every contractor needs a village license.

What requires a building permit in Burr Ridge?

Burr Ridge requires building permits for residential, commercial and industrial construction, including work in the public right-of-way. Its permit page lists what does and does not need one; a business opening where no permit is needed still needs a business license.

Permit required

  • New buildings and additions, including pergolas and sunrooms
  • Garages, sheds (prefabricated too) and gazebos
  • Decks, patios, retaining walls, outdoor kitchens and fireplaces
  • Pools and spas; fences, including repairs
  • Driveway replacements and extensions
  • Foundation work and moving, removing or adding walls
  • Plumbing and electrical alterations, solar panels and EV chargers
  • Any change in grade, any work in the parkway, and removing more than four trees

No permit

  • Traditional roof tear-off and replacement
  • Replacing windows, doors or roofing with no enlargement or structural change
  • Painting, hardwood refinishing, tile and carpet
  • Lawn irrigation systems, which should stay out of the right-of-way

Roofing that includes structural changes or repairs, new skylights or enlargements does need a permit. The village warns that unpermitted work can bring a stop work order with a $750 fine, plus a fee for starting without a permit of at least $750 or 150% of the permit cost, whichever is greater.

What Burr Ridge decides and what the state holds

The village’s Building Ordinance adopts, with local amendments listed in its Section VII, the 2021 International Residential, Building, Fire, Existing Building, Mechanical, Fuel Gas and Swimming Pool and Spa codes and the 2020 National Electrical Code. The state’s Illinois Plumbing Code and Illinois Accessibility Code apply in their latest editions as the state mandates, and the energy code is the latest Illinois Energy Code adopted by the Capital Development Board.

Short on time to read all of this?

Get a free quote →

Burr Ridge building department: who handles permitting

The Community Development Department runs building permits, planning and zoning and code enforcement. Its Development Coordinators process applications, answer the public and coordinate plan review and inspection services, while the plan reviews and inspections themselves are done by outside contractors; building code and architectural questions go to Don Morris Architects, P.C. (630-920-8175). Zoning questions go to the village Planner (x6260) and engineering questions to the Assistant Village Engineer (x6010). Burr Ridge spans DuPage and Cook counties, and land outside the village is permitted by the county: DuPage County Building and Zoning (630-407-6700) or the Cook County Department of Building and Zoning (312-603-0500), each for unincorporated areas only.

Burr Ridge permit contacts
DetailInformation
OfficeCommunity Development, Village Hall, 451 Commerce Street, Burr Ridge, IL 60527
Permit questions630-654-8181 x6170; permits@burr-ridge.gov
Inspection requestsinspection@burr-ridge.gov or 630-654-8181 x3100
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m.
Department headJanine Farrell, Community Development Director, Building Commissioner and Zoning Administrator, x6100
Village Hall main line630-654-8181

Burr Ridge permit types

Every permit type is filed in the village’s online permit portal (BS&A Online), opened from the Building Permits page. The village posts checklists to help assemble each application, though it notes they are being updated and may be out of date, so call x6170 with questions. Development Coordinators can meet in person, by appointment, to help with the online application. Where the owner is not the applicant, an Owner Authorization Form is needed. Because of a phishing scheme aimed at applicants, the village reminds everyone that it never asks for payment by wire transfer and writes only from @burr-ridge.gov addresses.

Residential permits

Single-family checklists cover accessory buildings, additions, alterations and remodels, decks, demolition, driveways, elevators, EV chargers, fences, generators, grading, new houses, outdoor kitchens and fireplaces, patios and retaining walls, right-of-way utilities, rooftop solar, pools and spas and tree removal of five or more trees. A new house, addition or alteration pays a plan review deposit with the application. Supplemental forms include the water and sewer service application, a water and sewer disconnect form for demolitions, a demolition notice and affidavit, and a police emergency contact list.

Commercial permits

Non-residential and multi-family checklists cover additions, alterations and renovations, elevators, EV chargers, new commercial and industrial buildings, parking lots, right-of-way utilities and signs. Plan review deposits run from $700 for an alteration to $2,000 for a new building, permit fees follow Section 250.4 of the Building Ordinance, and a business needs a certificate of occupancy before the village issues its business license. Certain signs need conditional approval or a sign variation from the Plan Commission/Zoning Board of Appeals.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. The Plan Commission/Zoning Board of Appeals hears zoning cases, conditional sign approvals and sign variations and recommends to the Board of Trustees; petition forms for rezoning, annexation and signs are posted on the Planning and Zoning page.
  • Subdivisions. Dividing land starts with a meeting with the Community Development Director under the Subdivision Ordinance.
  • Engineering and grading. Grading, berms and fill need a permit, and the engineering site plan checklist and site preparation rules apply; bonded work ends with a final engineering inspection.
  • Other agencies. Bond release can depend on approvals such as the sanitary district’s, and commercial certificates of occupancy need Health Department (where applicable) and Fire District inspections.

Burr Ridge permit costs and fees

Permit fees are set in Section 250 of the Building Ordinance; the building permits page summarizes the main ones. The fee for a new single-family home, addition or alteration starts at $2.00 per square foot, and the village notes that additional fees apply.

Burr Ridge permit fees, deposits and bonds
ItemFee or amount
Base permit fee, new single-family home, addition or alteration$2.00 per sq ft, plus additional fees
Plan review deposit: new single-family home; addition; alteration$1,000; $600; $300
Plan review deposit: new non-single-family building; addition; alteration$2,000; $1,000; $700
Flat-rate permits (Section 250.6)$125 residential; $625 non-residential
Resubmittal fee, from the third plan review$100 residential; $300 non-residential
Review of revisions to approved plans$100 residential; $300 non-residential
Re-inspection$100 the first time; $200 each after that
Stop work order$750
Starting work without a permitFee increased by 50% or $750, whichever is greater
Contractor license, general contractor with subcontractors; others$200; $100 a year
Cash bond, new single-family home$10,000 or the building permit fee, whichever is greater
Cash bond, new non-single-family building, additions or exterior alterations, in-ground pools, demolition, significant grading$10,000
Conditional certificate of occupancy (October 16 to March 31)$1,000 application fee plus a bond of at least $5,000

Rather talk it over?

Call 1-855-478-4290 →

Worked example from the posted rates: a 500-square-foot addition to a house has a base permit fee of 500 × $2.00, or $1,000, and a $600 plan review deposit is paid when the application is filed; the other fees Section 250 adds depend on the project. Cash bonds are returned after a final engineering and bond release inspection, which the applicant must request within one year of issuance (or of an extension), once landscaping has turf visibly growing, as-built drawings and other agency approvals are in and all fees are paid; otherwise the bond can be forfeited, and unpaid invoices are taken from it.

Trade permits and who may pull them

Every contractor doing permitted work must be licensed or registered with the village, and a contractor applying online needs a valid license and a web pin, requested by emailing the business name and contact details to permits@burr-ridge.gov; homeowners doing their own projects need no web pin. Contractor licenses last one year from issuance and cost $200 for a general contractor with subcontractors and $100 for any other contractor, with a $10,000 surety bond naming the village (a general contractor lists which subcontractors its bond covers) and liability insurance of at least $1 million in aggregate naming the village, plus workers’ compensation or a letter explaining why none is carried.

  • Plumbers and electricians are exempt from the fee and bond but file the application, the insurance certificate and their licenses: plumbers their Illinois plumbing contractor registration (055) and plumber’s license (058), electricians a license from an Illinois municipality that gives an electrical licensing exam.
  • Submission: send the license documents to permits@burr-ridge.gov; staff reply with a link to pay online. Copies of state licenses and insurance must be updated when they expire.

Rather not deal with the building department?

Get a free quote →

How to apply for a Burr Ridge building permit

1. Confirm the village has the parcel

Addresses outside Burr Ridge go to DuPage or Cook County Building and Zoning.

2. Settle zoning first

Variations, rezoning or sign approvals go to the Plan Commission/Zoning Board of Appeals before a permit.

3. License contractors

Contractors file their license documents and get a web pin; owners doing their own work skip this.

4. Apply online

Use the checklist for your project, upload everything to the portal and pay any plan review deposit.

5. Answer review comments

Outside reviewers return a first review within 15 business days and resubmittals within 10.

6. Pay and pick up

Pay the fees and any cash bond within 3 months of approval, or the approved permit becomes void.

Review, corrections and what causes delay

The third and later plan reviews cost $100 for residential projects and $300 for others, as do revisions to approved plans. An application that is never approved expires 3 months after it was filed or last resubmitted, an approved permit must be picked up within 3 months, and work must make substantial progress within 6 months of issuance. A contractor cannot file without a valid village license, and reviewers may ask for more documents after the first review.

Inspections and certificates in Burr Ridge

The required inspections are listed when the permit is issued, and the applicant, owner or tenant schedules them. Inspections run between 8 a.m. and noon on business days, and requests received by 3 p.m. are scheduled for the next business day; send them to inspection@burr-ridge.gov or call x3100 with the permit number, address, inspection type and date. An automated email confirms receipt, but staff do not return inspection request calls or emails; a specific time cannot be promised, though the inspector can call ahead on request. A failed inspection must be paid for before the re-inspection is booked.

Most permits expire one year after issuance. For new houses and additions, exterior work such as windows, siding and roofing must be finished within one year and site work within two years of issuance or the first footing inspection, whichever is later; 90-day extensions cost 25% to 50% of the permit fee. New non-single-family buildings get two years for exterior work and three for site work, with extensions at 25% to 100% of the fee. A certificate of occupancy needs all fees paid, every final inspection passed, inspected water and sewer connections with a final water meter inspection by Public Works, approved as-built drawings and the final engineering inspection. Between October 16 and March 31, a conditional certificate is possible when weather stops exterior work, with the work finished by May 15. Under Chapter 38 of the Municipal Code, outdoor construction by commercial firms is limited to 7 a.m. to 7 p.m. on weekdays and 8 a.m. to 5 p.m. on Saturdays, never on Sundays or holidays; outdoor maintenance is also allowed on Sundays from noon to 4 p.m. These limits do not apply to owners working on their own property.

Want this handled start to finish?

Get a free quote →

Illinois building code in Burr Ridge

Burr Ridge enforces the 2021 International codes and 2020 National Electrical Code with the local amendments in its Building Ordinance. FEMA’s Community Status Book lists the Village of Burr Ridge (community 170071, in Cook and DuPage counties) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Burr Ridge building permit FAQs

Do I need a permit for a new roof in Burr Ridge?

Not for a traditional tear-off and replacement. Structural repairs, skylights or enlargements need one.

Can I submit a paper application?

No. All permits must be filed through the online portal; staff can help by appointment.

How much is a permit for a house addition?

The base fee is $2.00 per square foot, plus a $600 plan review deposit and any other fees in Section 250 of the Building Ordinance.

How long does plan review take?

Up to 15 business days for the first review and 10 business days for each resubmittal.

Do contractors need a village license?

Yes. It costs $100, or $200 for a general contractor with subcontractors, and needs a $10,000 bond and insurance; plumbers and electricians pay no fee or bond.

Does a fence repair need a permit?

Yes. New fences, replacements and repairs all need a permit.

When are inspections done?

Between 8 a.m. and noon on business days; request by 3 p.m. for the next business day.

Inspections are where schedules slip.

Get a free quote →

Burr Ridge permit search and official resources

Check a permit’s status in the online portal or ask the Development Coordinators at x6170. The village posts monthly building reports on its building permits page. For copies of records, use the village’s online General FOIA Request form or send the PDF form to the Village FOIA Officer; the FOIA page gives Village Hall’s address as 7660 County Line Road, while other village pages list 451 Commerce Street, so confirm the address before mailing. The village typically has five business days to respond.

Simplify Burr Ridge permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Burr Ridge sooner?

Let Alliance prepare, file, and track your Burr Ridge permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Burr Ridge permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.