To get a building permit in Cumberland County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Cumberland County has no building or zoning department; on rural land its health department permits septic systems and wells, and its ordinances regulate wind, solar and battery storage projects.

Authority: No county building departmentSeptic and wells: Cumberland County Health DepartmentPhone: 217-849-3211
County building permit
None publishedNo building or zoning office
Septic and wells
Health Department200 S. Indiana St., Toledo
Energy projects
County ordinancesWind, solar, battery storage (2025)
County roads
Highway Department217-849-3441

Cumberland County, governed from Toledo, publishes no building code, zoning ordinance or building permit for its unincorporated areas. Rural builders deal instead with the Cumberland County Health Department (200 S. Indiana St., Toledo, 217-849-3211), which issues construction permits for private sewage systems and water wells, and with the county board’s energy ordinances for wind, solar and battery storage, adopted July 8, 2025. Greenup, Neoga, Toledo, Jewett and the county’s small shares of Casey and Montrose are governed by their own city or village boards.

What requires a permit in unincorporated Cumberland County?

The county’s website lists departments for animal control, the assessor, circuit clerk and judge, clerk and recorder, coroner, 911, emergency management, health, highway, sheriff, state’s attorney and treasurer, and no building, zoning or planning office. Its ordinances page lists six ordinances, all on energy and road use, and none adopts a building code or zoning. The county therefore publishes no building permit for a rural home or farm building, but these county approvals apply:

County approvals

  • Private sewage system construction permit (Health Department)
  • Water well and closed-loop geothermal well construction permits (Health Department)
  • Permit to seal an abandoned well, at no cost
  • Wind energy, solar and battery energy storage projects under the July 8, 2025 ordinances
  • DC power lines, under the June 13, 2023 ordinance
  • Use of county roads by wind and solar farms, under the February 14, 2023 road use ordinance and its addendum

Not published by the county

  • A county building permit, building code or inspection program
  • County zoning districts, setbacks or a zoning board
  • County electrical, plumbing or HVAC permits
  • County contractor licensing

The energy rules are changing: the county board’s solar and wind committee met on October 28 and November 6, 2026 to discuss the ordinances, and the November 10, 2026 board agenda listed motions to approve an amended solar ordinance, an amended wind ordinance and a renewable energy decommissioning resolution. The minutes of that meeting are not yet posted, so check the board’s minutes page for the outcome before planning a project.

What the county decides and what the state holds

Illinois lets each county choose whether to adopt a building code. Cumberland County has not, so the statewide minimums for commercial buildings and new homes apply (see the state note below). Septic systems follow the Illinois Private Sewage Disposal Code (Part 905), which the health department enforces, and wells are built only by contractors licensed by the Illinois Department of Public Health. Plumbing follows the state plumbing code with state-licensed plumbers, and roofers hold a state license.

Short on time to read all of this?

Get a free quote →

Cumberland County building department: who handles permitting

On unincorporated land, the Health Department is the main permitting office, the Highway Department handles county roads and the county board adopts and amends the energy and road use ordinances, working through its solar and wind committee. County offices are open 8 a.m. to 4 p.m., Monday to Friday. To check whether a parcel lies inside a city or village, use the county’s GIS portal or the property tax inquiry site.

Cumberland County offices for rural projects
OfficeContact
Cumberland County Health Department (septic, wells)200 S. Indiana St., P.O. Box 130, Toledo, IL 62468; 217-849-3211; info@cumberlandhealth.org; Monday to Thursday, 8 a.m. to 5 p.m.; Administrator Sheri Drotor
Highway Department (county roads)800 East Industrial Drive, Toledo, IL 62468; 217-849-3441; County Engineer Tom Kreke
Supervisor of Assessments (parcels, GIS, exemptions)P.O. Box 217, Toledo, IL 62468; 217-849-3831, fax 217-849-2183
County Board (energy and road use ordinances)Regular monthly meetings at 7 p.m. (for example November 10, 2026); agendas and minutes on the county website

Cities and villages in Cumberland County

The cities and villages are separate governments: Neoga (population 1,369), Greenup (1,330), Toledo (1,140) and Jewett (186), plus a few residents of Casey and Montrose, whose main areas lie in neighboring counties. What their own pages show:

  • Neoga: the city’s zoning ordinance requires a building permit for all construction, portable sheds included. The application asks for the owner, the general contractor, the type and size of the structure, footing and foundation details, framing and siding materials, the estimated cost, and plats or plans in duplicate drawn to scale; it certifies compliance with the Zoning Ordinance of September 1999 and with the Building Code of 2000 or its successive editions, and the city asks for up to 15 business days to process it. Fences need a separate permit under Ordinance 537-6-89 (June 6, 1989), reviewed by the city’s Building Inspector. Variances go to a Zoning Board public hearing and then to the City Council, which decided two setback variances that way in May and June 2026. The administrative office is at 533 Chestnut Ave., Neoga (217-895-3237).
  • Greenup: the village’s forms page lists no building permit application, and the mayor and trustees each administer a department, one of which is Code Review; ask the Village Clerk at the Municipal Building, 115 E. Cumberland St. The village’s pages give the clerk’s hours as 7:30 a.m. to 4:30 p.m. on one page and 7 a.m. to 4 p.m. in a site notice, so call ahead.
  • Toledo and Jewett: no official village website was found; ask the village office before building. Casey and Montrose are governed from their main areas in neighboring counties.

Cumberland County permit types

Because the county issues no building permit, the permit types that matter in rural Cumberland County are the health department’s construction permits and the county board’s energy project approvals.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

  • Private sewage system: file the health department’s Application for a Permit to Install a Private Sewage System with the fee before installation. If the system discharges to the surface, the owner also completes the department’s attestation that the discharge does not reach waters of the United States.
  • Water well: the licensed well contractor applies for a construction permit with the fee; the same applies to closed-loop geothermal wells.
  • Abandoned well sealing: a free permit, with the work done by a licensed driller or the homeowner.
  • Houses, garages and farm buildings: no county building permit or inspection; the septic and well permits still apply.

Commercial permits

Commercial buildings in unincorporated areas also have no county building permit, but they fall under the statewide minimums described in the state note below, and food businesses need the health department’s operating permit and inspections. Wind energy conversion systems, solar projects and battery energy storage systems are regulated by the county’s July 8, 2025 ordinances, and their use of county and township roads by the 2023 road use ordinance and addendum.

What comes before construction

  • Parcel check. Confirm on the GIS portal that the site is outside Neoga, Greenup, Toledo, Jewett, Casey and Montrose.
  • Septic design. Choose a licensed installer from the health department’s list of registered contractors, or apply as an owner-occupant, and get the system approved before any work.
  • Flood maps. FEMA’s flood map for unincorporated Cumberland County is dated February 4, 2011; check whether the building site is in a mapped flood area.
  • Energy projects. Follow the current solar, wind or battery storage ordinance, which the board was considering amending in November 2026.

Cumberland County permit costs and fees

There is no county building permit fee in unincorporated Cumberland County. The published amounts that touch a building project are few:

Cumberland County permit fees and amounts
ItemAmount
County building permit (unincorporated land)None; the county issues no building permit
Permit to seal an abandoned well (Health Department)$0
Private sewage system permit (Health Department)Fee due with the application; amount not published (217-849-3211)
Water well or closed-loop geothermal well permitFee due with the contractor’s application; amount not published
Neoga fence permit$25, paid to the City of Neoga with the application and sketch
Neoga building permitFee not printed on the application; ask the city office (217-895-3237)

Rather talk it over?

Call 1-855-478-4290 →

For energy projects, ask the County Clerk’s office for the ordinance currently in force and any application fee, road use agreement or decommissioning security it requires; a renewable energy decommissioning resolution was on the board’s November 10, 2026 agenda, and its outcome will appear in the posted minutes.

A new improvement also changes the tax bill. The Supervisor of Assessments explains that the Homestead Improvement Exemption covers up to $75,000 a year of fair cash value ($25,000 of assessed value) added to an owner-occupied home by a new room, deck or porch, or by rebuilding after a catastrophe, for four years after the work is completed and occupied. The septic installer’s and well contractor’s prices are not set by any county office.

Trade permits and who may pull them

The county itself issues no electrical, plumbing or mechanical permits and licenses no contractors. The trade rules on rural land come from the health department and the state:

  • Septic installers: a private sewage system may be installed by an Illinois licensed private sewage disposal installation contractor, someone working under the direct supervision of one, or the person who owns and occupies the single-family home it serves. The department keeps a list of licensed installers who have registered with it, and the state health department has a searchable list of active licensees.
  • Well contractors: private water wells and closed-loop geothermal wells must be built or renovated by an IDPH-licensed well contractor, who files the permit application.
  • Well sealing: by a licensed driller or the homeowner, with the free sealing permit.
  • Plumbing and roofing: state licenses, as everywhere in Illinois.

Any electrician registration or local contractor license inside the cities and villages is set by that municipality.

Rather not deal with the Cumberland County building department?

Get a free quote →

How to get permits for a rural Cumberland County project

1. Confirm the parcel

Use the county GIS portal to confirm the site is unincorporated rather than inside a city or village.

2. Check energy and road rules

For wind, solar, battery storage or DC power line projects, read the county ordinance and ask the County Clerk’s office, open 8 a.m. to 4 p.m., about the board’s current version.

3. Pick licensed contractors

Line up a licensed septic installer and an IDPH-licensed well contractor, unless you will install your own septic system as an owner-occupant.

4. Apply to the health department

File the private sewage permit application, attestation if the system discharges to the surface, and fee; the well contractor files the well permit.

5. Give notice before work

Notify the health department at least 48 hours before installing the septic system or starting the well.

6. Pass the inspection

Health department staff inspect the installation for code compliance.

Review, corrections and what causes delay

The health department approves each septic application before installation can start, and it inspects wells after the contractor’s notice. Unlicensed installers, missing attestations for surface-discharging systems and work started without the 48-hour notice are the usual problems. For energy projects, the pending amendments to the solar and wind ordinances mean the rules in force may change; check the latest board minutes.

Inspections in Cumberland County

No county building inspections or certificates of occupancy exist for unincorporated land. The health department’s inspections are:

  • Septic systems: inspection of the installation of each new or renovated system, after at least 48 hours’ notice, and complaint investigations of failing systems.
  • Wells: inspections to confirm wells are installed to code, after the contractor’s 48-hour notice; the department also inspects non-community water systems.
  • Water testing: staff collect well water samples for the state laboratory, or residents can collect their own sample for the department to submit.

Food establishments, including temporary vendors, receive operating permits and inspections from the same department. Inside the cities and villages, any building inspections follow local rules.

Illinois building code in Cumberland County

Cumberland County has adopted no building code for unincorporated areas, so the statewide minimums apply there, alongside the county’s energy and road use ordinances and the state private sewage and well codes enforced by the health department. FEMA’s Community Status Book lists Cumberland County (community 170987, unincorporated areas) as participating in the National Flood Insurance Program, in the regular program since September 18, 1996, with its current flood map dated February 4, 2011; it has no Community Rating System class.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

Cumberland County permit records and official resources

Septic and well permit records are held by the health department, and county board actions on the energy ordinances appear in the posted agendas and minutes. The county website links a list of Freedom of Information officers; send a written request to the office that holds the record.

Inspections are where schedules slip.

Get a free quote →

Cumberland County permit FAQs

Does Cumberland County issue building permits?

No county building permit is published for unincorporated land; the county has no building or zoning department. Septic and well permits come from the health department.

How do I get a septic permit?

Submit the Application for a Permit to Install a Private Sewage System and the fee to the health department, then give at least 48 hours’ notice before installation.

Can I put in my own septic system?

Yes, if you own and live in the single-family home; otherwise a licensed installer, or someone under a licensed installer’s direct supervision, must do the work.

Who can drill a well?

Only an IDPH-licensed well contractor, after getting a construction permit from the health department.

Does it cost anything to seal an old well?

The permit is free; a licensed driller or the homeowner may seal it.

Are there county rules for solar or wind farms?

Yes. The county adopted wind, solar and battery storage ordinances on July 8, 2025, and amendments were on the November 10, 2026 board agenda.

Who handles building in Neoga, Greenup or Toledo?

Each governs building inside its own limits. Neoga requires a permit for all construction, portable sheds included, and charges $25 for a fence permit; in Greenup and Toledo, ask the village office.

Simplify Cumberland County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Cumberland County sooner?

Let Alliance prepare, file, and track your Cumberland County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Cumberland County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.