Skip to main content

De Witt County, Illinois Building Permit Guide

To get a building permit in De Witt County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

De Witt County’s Department of Planning and Zoning in Clinton issues zoning and building permits for unincorporated land under the county zoning code, with online filing through Cloudpermit and a $150 permit for a new single-family home.

Authority: De Witt County Planning and ZoningFiling: Cloudpermit or paperPhone: 217-935-7775
Authority
Planning and Zoning201 W. Washington St., Clinton
New house permit
$150Garages, decks and porches included
Septic application
$200DeWitt Piatt health department
Farm buildings
No feeAgricultural buildings exempt by state law

In unincorporated De Witt County, permits come from the Department of Planning and Zoning at the DeWitt County Building, 201 W. Washington St., Clinton (217-935-7775, zoning@dewittcountyil.gov), led by Zoning Administrator Elizabeth Weikle. The county enforces zoning adopted in 1972 rather than a building code, files permits online through Cloudpermit or on its paper application, and charges $150 for a single-family home. No permit is issued until the DeWitt Piatt Bi-County Health Department approves the septic and water plans.

What requires a permit in unincorporated De Witt County?

The county’s permit application covers the erection, construction, reconstruction, alteration, enlargement or moving of buildings and structures and changes of use. Its checklist shows what the department permits:

Permit needed

  • New houses, site-built or modular, multi-family buildings and mobile homes
  • Commercial, industrial, institutional and public buildings
  • Attached and detached garages, covered patios, porches and storage sheds
  • Fences, swimming pools, antennas, towers and other incidental structures
  • Room additions, moving a building and repairs
  • Certificates of occupancy for changes of use, special uses and variances
  • Farm buildings (no fee, but on the application)

Zoning limits to plan around

  • A and RD-1 and RD-2 lots: 87,120 sq ft, 240 ft wide, 50 ft front, 35 ft rear and 15 ft side setbacks
  • R-1 lots: 12,150 sq ft, 90 ft wide, 30 ft front setback
  • Detached residential buildings may sit 5 ft from the rear line and 3 ft from an interior line
  • Highway entrances in RD-1 at least 500 feet apart
  • Lots without public sewer may need to be larger

The district rules come from section 155.065 of the zoning code, which makes it unlawful to build or alter a structure in the county, or in incorporated places that come under the chapter, without the required lot area and yards. Buildings over two stories need 5 more feet of side yard for each extra story.

What the county decides and what the state holds

De Witt County zones its unincorporated land, reviews subdivisions and plats, manages the floodplain and sets permit fees, but it has not adopted a building code: its own permit packet calls it a non-building-code jurisdiction. Under Public Act 103-0510, a new or substantially improved commercial building there may not be occupied until the owner hires a qualified inspector who files a certification of compliance with the state’s listed codes. For a new home, Illinois law makes a residential code part of the construction contract, by default the International Residential Code, and the county form asks which code was agreed. Plumbing follows the Illinois Plumbing Code and plumbers and roofers hold state licenses.

Short on time to read all of this?

Get a free quote →

De Witt County building department: who handles permitting

The Planning and Zoning office issues permits, acts as plat officer, reviews subdivisions and manages the floodplain for unincorporated areas. Zoning cases go to the Regional Planning Commission and the Zoning Board of Appeals, whose seven members serve five-year terms, and siting permits for solar and wind projects go to the county board after a public hearing. Use the county’s GIS portal to confirm whether a parcel is unincorporated.

De Witt County permit offices
OfficeContact
Planning and ZoningDeWitt County Building, 201 W. Washington St., P.O. Box 439, Clinton, IL 61727; 217-935-7775; zoning@dewittcountyil.gov; Tuesday and Thursday 8:30 a.m. to 4:30 p.m., other weekdays by appointment; Zoning Administrator Elizabeth Weikle
DeWitt Piatt Bi-County Health Department5924 Revere Road, Clinton; 217-935-3427; Monday to Friday 8 a.m. to 4 p.m.
Highway Department9900 Revere Road, Clinton; 217-935-2438; Monday to Friday 7:30 a.m. to 4:30 p.m.; County Engineer Mark Mathon

The county has two cities and five villages. The Village of Waynesville sends applicants for building permits and inspections to the county Zoning Administrator. Clinton, the county seat (population 6,781), has its own Building and Zoning section; contact City Hall at 118 W. Washington St. (217-935-9438). For Farmer City, Wapella, Weldon, Kenney and the village of De Witt, the published sources do not say who issues permits; ask the village or city office, or the county zoning office.

De Witt County permit types

Permits are filed online through Cloudpermit or on the county’s paper Zoning Building Permit application (2025 version), which asks for the owner, applicant, legal description, property number, project type, estimated cost, building size and height, and the architect and contractor. A plot plan and the fee must accompany it.

Residential permits

  • New homes and additions: the application with a plot plan showing lot dimensions, utilities, easements and watercourses, every building with distances to lot lines and road rights-of-way, buildings within 100 feet on either side, the well and septic system, parking, drainage, the slope of the ground and a north arrow.
  • Health approval first: the sewage disposal system must be approved by the health department before the zoning department issues a permit for construction or occupancy.
  • Accessory buildings, fences and pools: the same application with a plot plan; detached residential buildings can sit 5 feet from the rear lot line and 3 feet from an interior line.
  • Mobile homes: a $35 permit.

Commercial permits

Commercial and industrial buildings are permitted by floor area and also carry a review and inspection fee. Before occupancy, the owner must contract with a qualified inspector who certifies the building against the International Building and Existing Building codes, the electrical, energy, accessibility and plumbing codes and the state fire rules. Signs need the exact wording and dimensions on the plot plan, and flashing lights are not allowed. Commercial solar and wind facilities need a siting permit under the county’s solar (chapter 157) and wind (chapter 153) ordinances, both revised in March 2026.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning relief. Rezonings, special uses and variances have their own applications and hearings; the applicant pays the legal notice publication costs.
  • Subdivisions. Preliminary and final plats follow the county’s plat checklists and subdivision regulations.
  • Septic and well. Health department approval of sewage and water plans, a condition of every building permit since 1978.
  • Road access. Entrances onto county highways follow the Highway Department’s entrance policy and right-of-way permits.
  • Siting hearings. The county board scheduled a public hearing on November 18, 2026 at 5 p.m. on the Heritage Road Solar siting permit (case Siting #7 Solar-2026), a 41.7-acre facility in Texas Township.

De Witt County permit costs and fees

Zoning and permit fees come from the county’s fee schedule, adopted August 13, 1992 and last amended June 20, 2024. All fees are non-refundable, and checks are payable to DeWitt County Zoning:

De Witt County permit and zoning fees (amended June 20, 2024)
Permit or applicationFee
Single-family or multi-family residential use (with garages, carports, decks, porches)$150
Residential accessory building$50 up to 1,000 sq ft; $150 over 1,000 sq ft
Mobile home$35
Commercial or industrial building or addition$0.03 per sq ft of gross floor area, $50 minimum, plus review and inspection fee
Structures other than buildings0.1% of estimated cost, $25 minimum
Occupancy permit (change of land use)$25
Special use$200 up to 2 acres; $250 to 10 acres; $300 to 26 acres; $100 plus $10 per acre from 26 acres
Rezoning$200 up to 2 acres; $250 for 2.01 to 10 acres; $300 over 10 acres
Variance / appeal / text amendment$150 / $100 / $125
Agricultural buildings and farm accessory buildingsNo fee (state law)

Rather talk it over?

Call 1-855-478-4290 →

Examples from the schedule: a 10,000-square-foot commercial building costs 10,000 times $0.03, or $300, plus the review and inspection fee; a 1,200-square-foot shop works out to $36, so the $50 minimum applies; a $40,000 tower or other non-building structure costs $40. Health department fees, effective October 1, 2026, are $200 for a septic application (contractor or homeowner), $75 to modify less than half of an existing system, $100 for a well, $100 for a geothermal loop of up to 10 holes plus $10 for each extra hole, and $50 to seal a well.

Trade permits and who may pull them

De Witt County issues no separate electrical, plumbing or mechanical permits and publishes no county contractor license or registration; the Planning and Zoning permit covers the building and its use. The trade rules that apply come from the state and the health department:

  • Septic systems: the health department takes applications from licensed contractors and from homeowners doing their own installation, at the same $200 fee; a permit is needed when a septic tank is replaced or a major component is removed or added.
  • Wells: wells, geothermal loops and well sealing are permitted under the health department’s water well ordinance; licensed contractors pay the $50 sealing charge once a year, on their first sealing application.
  • Commercial buildings: the qualified inspector who certifies a new commercial building must be certified as a commercial building inspector by the International Code Council or an equivalent national body, have completed a U.S. Department of Labor-certified apprenticeship as a building inspector, or have filed inspection experience under Capital Development Board rules.
  • Plumbing and roofing: state-licensed plumbers under the Illinois Plumbing Code, and state-licensed roofers.

Inside Clinton and any other municipality with its own program, trade rules are the city’s or village’s.

How to apply for a De Witt County permit

1. Confirm the parcel

Check on the county GIS portal that the land is unincorporated, or in a village that uses the county office, and note its zoning district.

2. Talk to the zoning office

Call 217-935-7775 or email zoning@dewittcountyil.gov about setbacks, lot size and whether a variance or special use is needed.

3. Get health department approval

File the septic and well applications with the DeWitt Piatt Bi-County Health Department.

4. Draw the plot plan

Show every item the application lists, including the well and septic locations.

5. File the permit

Apply online through Cloudpermit or bring the paper application, plot plan and fee to the DeWitt County Building.

6. Arrange inspection certification

For a commercial building, contract a qualified inspector before occupancy; for a new home, record the residential code in the contract.

Rather not deal with the De Witt County building department?

Get a free quote →

Review, corrections and what causes delay

No permit is issued until the application is complete, and none is issued before the health department approves the sewage and water plans. The office is open without appointment only on Tuesdays and Thursdays. Rezonings, special uses and variances add a public hearing and newspaper notice, and solar and wind projects need a county board siting hearing, so allow for those meeting schedules.

Inspections and certificates in De Witt County

Because the county enforces zoning rather than a building code, it publishes no schedule of structural inspections for houses; contact the Zoning Administrator about any inspection your permit requires. Commercial and industrial permits carry a review and inspection fee, and the permit application authorizes county staff to enter the property for zoning purposes.

  • Commercial occupancy: a qualified inspector’s certification must be filed with the county before a new or substantially improved commercial building is occupied.
  • Occupancy permits: a $25 occupancy permit is needed for a change in land use, other than agricultural, one- or two-family residential, public utility or government uses.
  • Septic and wells: inspected by the health department; the state laboratory tests the first sample from a new well at no charge.

Work must follow the approved plot plan: no deviation is allowed unless the department approves it. In Waynesville, building permits and inspections are handled through the county Zoning Administrator.

Illinois building code in De Witt County

De Witt County enforces its zoning code, subdivision regulations, floodplain rules and solar and wind ordinances through Planning and Zoning, and describes itself as a non-building-code jurisdiction, so the statewide minimums apply to construction. FEMA’s Community Status Book lists De Witt County (community 170192, unincorporated areas) as participating in the National Flood Insurance Program, with its current flood map dated November 2, 2007; the county has no Community Rating System class.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

De Witt County permit records and official resources

Freedom of Information Act requests go in writing to the DeWitt County FOIA Officer, P.O. Box 439, Clinton, IL 61727, with your name, address, phone number, email, the records you want, how you want to inspect them and whether the request is commercial. Septic and well records are held by the health department, which lists record requests as fee exempt.

Inspections are where schedules slip.

Get a free quote →

De Witt County permit FAQs

How much is a permit for a new house in De Witt County?

$150 for a single-family home, including attached or detached garages, carports, decks and porches, plus the health department’s $200 septic application if the home is not on sewer.

Can I apply online?

Yes. The county takes building permit applications through Cloudpermit, or you can file the paper application with a plot plan and fee.

Does the county inspect houses under a building code?

No building code has been adopted; the county calls itself a non-building-code jurisdiction. Illinois law writes a residential code into new-home contracts, by default the International Residential Code.

Do farm buildings need a permit?

They go on the permit application, but by state law no fee is charged for agricultural buildings or accessory buildings on an operating farm.

When is the zoning office open?

Tuesdays and Thursdays from 8:30 a.m. to 4:30 p.m.; Monday, Wednesday and Friday visits are by appointment (217-935-7775).

Who handles permits in Waynesville or Clinton?

Waynesville sends building permits and inspections to the county Zoning Administrator. Clinton has its own Building and Zoning section at City Hall.

How much does a variance cost?

$150, plus the cost of the legal notice; a special use starts at $200 and a rezoning at $200, depending on acreage.

Simplify De Witt County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in De Witt County sooner?

Let Alliance prepare, file, and track your De Witt County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about De Witt County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.